0% found this document useful (0 votes)
73 views14 pages

LO1 - Assemble Computer Hardware Assessment Criteria Conditions Methodolo Gies Assessment Methods

This document outlines five learning outcomes for installing and configuring computer systems: 1. Assemble computer hardware components according to procedures. 2. Create bootable devices and customized installers following software guides. 3. Install operating systems and device drivers according to instructions and end-user requirements. 4. Install application software based on guides, requirements, and licenses. 5. Test systems and document results to ensure reliability and compliance with standards.

Uploaded by

Rodessa Lara
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
73 views14 pages

LO1 - Assemble Computer Hardware Assessment Criteria Conditions Methodolo Gies Assessment Methods

This document outlines five learning outcomes for installing and configuring computer systems: 1. Assemble computer hardware components according to procedures. 2. Create bootable devices and customized installers following software guides. 3. Install operating systems and device drivers according to instructions and end-user requirements. 4. Install application software based on guides, requirements, and licenses. 5. Test systems and document results to ensure reliability and compliance with standards.

Uploaded by

Rodessa Lara
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 14

Details of Learning Outcomes:

LO1 . Assemble computer hardware

Assessment Contents Conditions Methodolo Assessment


Criteria gies Methods
 Unit  OHS Policies  Tools  Lecture/  Demonstratio
assembly is and and test demonstr n
planned and procedures instrume ation  Observation
prepared to  Introduction nt  Self-  Interviews/
ensure to Computer  PC or paced/ questioning
OH&S systems workstati modular  Assessment
policies and  Computer on  Lecture/ of output
procedures Assembly  Compute Discussio product
procedures r n  Written/Oral
are followed
periphera  Project examination
in accordance
ls/device Method  Practical
with systems
s demonstratio
requirements
 Appropri n
 Materials
ate OS,
necessary to
drivers
complete the
and
work are
software
identified and applicati
obtained in ons/prog
accordance rams
with
established
procedures
and checked
against
systems
requirements
 Tools,
equipment
and testing
devices
needed to
carry out the
installation
work are
obtained in
accordance
with
established
procedures
and checked
for correct
operation and
safety
 Computer
hardware is
assembled in
accordance
with
established
procedures
and systems
requirements
 Basic-input-
output-
system
(BIOS)
configuration
is performed
in accordance
with
hardware
requirements.

LO2 . Prepare Installer

Assessment Contents Conditions Methodologies Assessment


Criteria Methods

 Portable bootable  Introduction to  Tools and  Lecture/  Demonstration


devices are created Software test demonstration  Observation
in accordance with Installation instrument  Self- paced/  Interviews/
software  Creation of  PC or modular questioning
manufacturer Bootable USB workstation  Lecture/Discu  Assessment of
instruction  Computer ssion output product
peripherals/de  Project  Portfolio
 Customized
vices Method  Written/Oral
installers are
prepared in  Appropriate  Viewing examination
accordance with OS, drivers Multimedia  Practical
software utilization and software demonstration
guide and end user applications/
agreement. programs

 Installation of
portable
applications are
carried out in
accordance with
software user guide
and software
license

LO3 . Install operating system and drivers for peripherals/ devices

Assessment Contents Conditions Methodologies Assessment


Criteria Methods
 Operating system  Types of Software  Tools and  Lecture/  Demonstration
(OS) is installed in  Operating system test demonstration  Observation
accordance with installation instrument  Self- paced/  Interviews/
established  Device Drivers  PC or modular questioning
installation workstation  Lecture/Discu  Assessment of
procedures and to  Computer ssion output product
comply with end- peripherals/de  Project  Portfolio
user requirements vices Method  Written/Oral
 Peripherals/devices  Appropriate  Viewing examination
drivers are installed OS, drivers Multimedia  Practical
and configured in and software demonstration
accordance with applications/
manufacturer’s programs
instructions and/or
OS installation
procedures.
 OS and drivers
updates/patches are
accessed and
installed in
accordance with
manufacturer’s
recommendations
and requirements
 On-going checks of
the quality of the
work are
undertaken in
accordance with
established
procedures

LO4 . Install application software

Assessment Contents Conditions Methodologies Assessment


Criteria Methods

 Application  Application  Tools and  Lecture/  Demonstration


software are Software test demonstration  Observation
installed based on o Application instrument  Self- paced/  Interviews/
software software  PC or modular questioning
installation guides, installation workstation  Lecture/Discu  Assessment of
end-user o Application  Computer ssion output product
requirements and software peripherals/de  Project  Portfolio
software license updates vices Method  Written/Oral
agreement  Appropriate  Viewing examination
 Variation to OS, drivers Multimedia  Practical
application and software demonstration
software applications/
installation is programs
carried out in
accordance to
customer/client
requirements
 Software updates
are accessed and
installed in
accordance with
manufacturer’s
recommendations
and requirements

LO5 . Conduct testing and documentation

Assessment Contents Conditions Methodologies Assessment


Criteria Methods

 Devices / systems  Stress Testing  Tools and  Lecture/  Demonstration


and/or installation  5S and 3Rs test demonstration  Observation
is tested to  Documentation instrument  Self- paced/  Interviews/
determine whether  PC or modular questioning
it conforms to workstation  Lecture/Discu  Assessment of
requirements  Computer ssion output product
peripherals/de  Project  Portfolio
 Stress test is
vices Method  Written/Oral
conducted to
ensure reliability of
 Appropriate  Viewing examination
equipment in
OS, drivers Multimedia  Practical
and software demonstration
accordance with
applications/
manufacturer’s
programs
instructions and
system
requirements
 5S and 3Rs are
followed according
to environmental
policies
 Documentation in
relation to the test
is forwarded to
appropriate
personnel and/or
authority in
accordance with
requirements
SESSION PLAN

Sector : Electronics

Qualification Title : Computer Systems Servicing NC II

Unit of Competency : Install and configure computer systems

Module Title : Installing and configuring computer systems

Learning Outcomes:

1. Assemble computer hardware


2. Prepare Installer
3. Install operating system and drivers for peripherals/ devices.
4. Install the computer application software
5. Conduct testing and documentation

A. INTRODUCTION

This core competency demonstrates an understanding of concepts and principles in installing and configuring computer systems. Also, this allows the students to perform the
installation and configuration of computer systems based on established procedures and system requirements.

B. LEARNING ACTIVITIES
LO 1: Assemble computer hardware
Learning Content Methods Presentation Practice Feedback Resources Time

 OHS Policies and Individual study Read Information Sheet Answer Self-check Compare answers to answer CBLM 1hr
procedures (1.1-1) on OHS Policies (1.1-1) key (1.1-1)
and procedures

Video Presentation Watch trainers video Answer trainer’s Listen trainer’s feedback on Video 30minutes
presentation and oral questioning oral questioning
participate actively in LCD Projector
the class discussion.
References

Laptop

Lecture/Discussion Lisents trainer’s lecture Answer trainer’s Listen trainer’s feedback on PPT 1hr
and participate in class oral questioning oral questioning
discussion LCD Projector

References

Laptop

 Introduction to Individual Study Read Information Sheet Answer Self-check Compare answers to answer CBLM 2hrs
computer systems (1.1-2) on introduction (1.1-2) key (1.1-2)
to computer systems

Lecture/Discussio Lisents trainer’s Answer trainer’s Listen trainer’s feedback on PPT 1hr
n lecture and oral questioning oral questioning
participate in class LCD Projector
discussion
References

Laptop
 Computer assembly Individual Study Read Information Sheet Answer Self-check Compare answers to answer CBLM 1hr
procedures (1.1-3) on types and (1.1-3) key (1.1-3)
parts of computers Working Area

Working table

Computer set

Tools

Lecture/Discussion Lisents trainer’s lecture Answer trainer’s Listen trainer’s feedback on PPT 1hr
and participate in class oral questioning oral questioning
discussion LCD Projector

References

Laptop

Demonstration Observe demo Perform Job sheet Evaluate performance using Working Area 4hrs
1.1-3 performance criteria checklist
1.1-3 Working table

Computer set

Tools
LO 2: Prepare Installer

Learning Content Methods Presentation Practice Feedback Resources Time

 Introduction to Individual study Read Information Sheet Answer Self-check Compare answers to answer CBLM 1hr
software installation (1.2-1) on Introduction (1.2-1) key (1.2-1)
to software installation

Lecture/Discussion Lisents trainer’s lecture Answer trainer’s Listen trainer’s feedback on PPT 1hr
using powerpoint oral questioning oral questioning
presentation and LCD Projector
participate in class
References
discussion
Laptop

 Creation of Bootable Individual Study Read Information Sheet Answer Self-check Compare answers to answer CBLM 1hr
USB (1.2-2) on introduction (1.2-2) key (1.2-2)
to computer systems

Lecture/Discussion Lisents trainer’s lecture Answer trainer’s Listen trainer’s feedback on PPT 1hr
and participate in class oral questioning oral questioning
discussion LCD Projector

References

Laptop

Video Presentation Watch trainers video Answer trainer’s Listen trainer’s feedback Video 30 minutes
presentation and oral questioning
participate actively in LCD Projector
the class discussion.
References
Laptop

Demonstration Observer trainer’s demo Perform Job sheet Evaluate performance using Computer 2hrs
(1.2.-1) the Performance Job checklist set/Laptop
(1.2.-1)
LO 3: Install operating system and drivers for peripherals/ devices.

Introduction to Individual study Read Information Sheet Answer Self-check Compare answers to answer CBLM 1hr
Software (1.2-1) on Software (1.2-1) key (1.2-1)

Lecture/Discussion Lisents trainer’s lecture Answer trainer’s Listen trainer’s feedback on PPT 1hr
and participate in class oral questioning oral questioning
discussion LCD Projector

References

Laptop

Operating System Individual study Read Information Sheet Answer Self-check Compare answers to answer CBLM 1hr
Installation (1.2-2) on Operating (1.2-2) key (1.2-1)
system installation

Lecture/Discussion Lisents trainer’s lecture Answer trainer’s Listen trainer’s feedback on PPT 1hr
and participate in class oral questioning oral questioning
discussion LCD Projector

References

Laptop

Demonstration Observe demonstration Perform Evaluate performance using CBLM 5hrs


operation sheet Performance critateria
(1.2.1) checklist (1.2.1) USB with the ISO
image of Windows 7

Computer
Set/Laptop

Device Drivers Individual study Read Information Sheet Answer Self-check Compare answers to answer CBLM 1hr
(1.2-3) on Device (1.2-3) key (1.2-3)
Drivers

Lecture/Discussion Lisents trainer’s lecture Answer trainer’s Listen trainer’s feedback on PPT 1hr
and participate in class oral questioning oral questioning
discussion LCD Projector

References

Laptop

Demonstration Observe demonstration Perform Evaluate performance using CBLM 3hrs


operation sheet Performance critateria
(1.2.2) checklist (1.2.2) DVD/USB with the
device drivers

Internet connection

Computer
Set/Laptop

LO 4: Install Application Software

Application Individual study Read Information Sheet Answer Self-check Compare answers to answer CBLM 1hr
Software (1.3-1) on Application (1.3-1) key (1.3-1)
Software
 Application
software Lecture/Discussion Lisents trainer’s lecture Answer trainer’s Listen trainer’s feedback on PPT 1hr
installation and participate in class oral questioning oral questioning
 Application LCD Projector
discussion
software
updates References

Laptop
Demonstration Observe demonstration Perform Evaluate performance using CBLM 4hrs
operation sheet Performance critateria
(1.3.1) checklist (1.3.1) DVD/USB with the
application software

Internet connection

Computer
Set/Laptop
LO 5: Conduct testing and documentation

Stress Testing Individual study Read Information Sheet Answer Self-check Compare answers to answer CBLM 1hr
(1.4-1) on Stress (1.4-1) key (1.4-1)
Testing

Lecture/Discussion Lisents trainer’s lecture Answer trainer’s Listen trainer’s feedback on PPT 1hr
and participate in class oral questioning oral questioning
discussion LCD Projector

References

Laptop

Demonstration Observe demonstration Perform Evaluate performance using CBLM 1hr


operation sheet Performance critateria
(1.4-1) checklist (1.4-1) Computer Set/Laptop

5Ss and 3Rs Individual study Read Information Sheet Answer Self-check Compare answers to answer CBLM 1hr
(1.4-2) on 5Ss and 3Rs (1.4-2) key (1.4-2)

Video Presentation Watch trainers video Answer trainer’s Listen trainer’s feedback Video 1hr
presentation and oral questioning
participate actively in LCD Projector
the class discussion.
References

Laptop

Documentation Individual study Read Information Sheet Answer Self-check Compare answers to answer CBLM 1hr
(1.4-3) on (1.4-3) key (1.4-3)
Documentation
Lecture/Discussion Lisents trainer’s lecture Answer trainer’s Listen trainer’s feedback on PPT 1hr
and participate in class oral questioning oral questioning
discussion LCD Projector

References

Laptop

Demonstration Observe demonstration Perform Evaluate performance using CBLM 3hrs


operation sheet Performance critateria
(1.4-3) checklist (1.4-3) Computer Set/Laptop

C. ASSESSMENT PLAN

 Written Test : Questions related to LO1 to LO5.


 Performance Test : The performance will include:
1. Assembling computer hardware
2. Installing operating system and drivers for peripherals/ devices.
3. Installing the computer application software
4. Conducting testing and documentation

You might also like