GLPM Mi 10991790en
GLPM Mi 10991790en
GLPM Mi 10991790en
* 1 0 9 9 1 7 9 0 EN *
MI GREENLIFT GLT
INSTALLATION
MANUAL
GREEN LIFT SYSTEM
GLT Σ WITH PERMANENT MAGNETS
FOR SYSTEMS:
q GLT Σ (GLPM MRL 1:1)
q GLT Σ (GLPM MRL 2:1)
SYSTEM N° INSTALLER
INDEX
0 GENERAL INFORMATIONS 5
0.1 INTRODUCTION 5
0.1.1 DEFINITIONS 5
0.1.2 MAIN STANDARDS OF REFERENCE 5
0.1.1 TERMS AND SYMBOLS USED 6
0.1.2 DOCUMENTS RELATED WITH INSTALLATION 6
0.2 SAFETY PRECAUTION DURING INSTALLATION 6
0.3 PRELIMINARY OPERATIONS 7
0.3.1 INSTALLATION PROCEDURES 7
0.3.2 DIMENSIONS CONFORMITY 7
0.3.3 MATERIALS OFF LOADING AND STORAGE 7
0.3.1 TOOLING 7
0.3.2 SCAFFOLDING 7
1 WELL MATERIAL 8
1.1 ANCHORING 8
1.1.1 PLUMBING 8
1.1.2 BRACKETS 8
1.1.2.1 FIXING WITH ANCHORS 9
1.1.2.2 FIXING WITH HALFEN 9
1.1.2.3 FIXING IN WALL 9
1.1.2.4 OTHER FIXINGS 9
1.2 BOLTS, SCREWS AND ANCHORS 10
1.2.1 ANCHORS AND HALFEN 10
1.2.2 TIGHTENING TORQUES 10
1.2.3 TIGHTENING TORQUES FOR OTHER SYSTEMS BOLTS 10
1.3 GUIDE RAILS 11
2 SLING 12
2.1 SLINGS MRL 1:1 12
2.1.1 FRAME FOR MACHINE, COUNTERWEIGHT AND ACCESSORIES 13
2.2 SLINGS MRL 2:1 14
2.2.1 FRAME FOR MACHINE, COUNTERWEIGHT AND ACCESSORIES 15
2.3 SHOES ADJUSTMENT 16
2.4 SLING LIFTING AND PEDESTAL INSTALLATION 16
2.4.1 PEDESTAL LENGTH 17
2.5 LOAD WEIGHTING DEVICE AND CAR BOTTOM 17
2.6 DRIVING LEVERS OF THE SAFETY DEVICES 18
2.7 WEIGHTS OF THE MAIN COMPONENTS 18
3 TRACTION MACHINE AND ROPES 19
3.1 T RACTION MACHINE 19
3.1.1 ROPES LAYING 19
3.2 ROPES 19
3.2.1 ROPING OF THE SYSTEM 1:1 19
3.2.2 ROPING OF THE SYSTEM 2:1 20
3.2.3 TENSIONING OF THE SYSTEM 22
3.3 FINAL OPERATIONS ON THE SLING 22
3.3.1 POSITION OF THE FINAL LIMIT SWITCH 22
3.4 SPEED GOVERNOR 23
3.5 CHECKS 23
3.5.1 CHECKS FOR STNDARD SYSTEMS 23
4 CAR AND DOOR OPERATOR 24
5 LANDING DOORS 24
6 ELECTRICAL MATERIAL 24
6.1 WELL AND MACHINERY ROOM 24
6.1.1 INSTALLATION OF THE CONTROL PANEL OUTSIDE THE WELL 24
6.1.2 WELL ELECTRICAL LINES 24
6.1.2.1 TRUNKS 24
6.1.2.2 FLEXIBLE CABLES 25
6.1.2.3 CONNECTION CABLES 25
6.1.2.4 ELECTRICAL CONNECTIONS 25
6.2 T RACTION MACHINE 25
6.3 SLING AND ROPES 26
6.3.1 FINAL LIMIT ELECTRICAL SWITCH 26
6.3.2 SAFETY ELECTRICAL SWITCH (SAFETY GEAR/RELEASING ROPES) 26
REV
GMV SPA
VIA DON GNOCCHI, 10 - 20016 PERO - MILANO (ITALY) - TEL. +39 02 33930.1 - FAX +39 02 3390379 - E-MAIL: [email protected]
VIA PER BIANDRATE, 110/112 – 28100 NOVARA (ITALY) – TEL. +39 0321 677 611 – FAX +39 0321 677690 - E-MAIL: [email protected]
WELL TYPE
MANOEUVRE
AUTOMATIC PUSH BUTTON (APB) HOLD TO RUN (SOLO HLDM)
™ ™
™ ™
0 GENERAL INFORMATIONS
0.1 INTRODUCTION
0.1.1 DEFINITIONS
The definitions are used in this manual as indicated in the following standards and regulations
EN81-20 e EN81-50 Safety regulations for the construction and installation of lifts
UNI EN ISO 14798 Lifts (elevators), escalators and mobile walkways
– Risks assessment and reduction methodology
UNI EN ISO 7010 Graphic symbols: Safety signs and colours
EN12016 e EN12015 Electromagnetic compatibility
CEI EN 61439-1 Low voltage switchgear and control gear assemblies (LV control panels)
NOTA
The normal use of the lift is NOT
Wrong work.
possible
To make installation operations is NOT possible
ABBREVIAZIONI
MRL Machine Room Less (Control panel inside well) TR Reduced headroom FR Reduced pit
MRL2 Machine Room Less (Control panel outside well) TFR Reduced headroom and pit
0.1.2 DOCUMENTS RELATED WITH INSTALLATION
This is the documentation to be used for the installation of a complete lift:
>100
>130>150
Vano - Well
Sx I ngombr o Tela i - Fr ames Dx
Vano - Well
Cor sa - Tr avel
INSTRUCTION RELATED TO
INSTRUCTION RELATED TO INSTRUCTION RELATED TO
DOOR OPERATOR, CAR
SLING AND ROPES THE CAR
AND LANDING DOORS
All the documentation for a correct and safe installation of the lift, must be stored by the installation responsible.
Please remember that this documentation is considered part of the plant and must be complete, well stored
and unabridged in every part.
In order to maintain the readability, the documentation shouldn’t be damaged and shouldn’t have missing
parts. Moreover, do not tear or deteriorate sheets during consulting.
0.2 SAFETY PRECAUTION DURING INSTALLATION
During installation and maintenance, it is compulsory to observe the applicable national safety standards for
the workplaces
ATTENTION - Before beginning any of the installation operations, ALWAYS check that all the
mechanical and electrical safety devices are, turned on and in perfect working order.
1 WELL MATERIAL
NOTE
The oil collecting tray Is NOT supplied with the mechanical part but is inside the
sling packaging.
1.1 ANCHORING
1.1.1 PLUMBING
For a correct plumbing, refer to the following instructions
and to the images
Lower the plumb lines for the doors and for the guide rails
- Verify if the plan and vertical dimensions of the well comply
with the project drawing
- Highlight possible structural differences in the panels
plumbing.
Set the control templates to verify the distance between guides.
1.1.2 BRACKETS
If not contrary to the specific instructions of the materials supplied, for a correct and safe installation of the
brackets please refer to the following procedure:
hef
L do h(min)
df [mm] [mm] [mm]
min
[mm]
M10 90 10 80 60
M12 100 12 95 70
M16 145 16 135 85
DTG = dimension show on layout
DAG = dimension show on layout
Y <= dimension show on layout
G S Pd Ps
T82/A
68,25 10 5/10 = Pd
T82/B
T90/A
75 10 5/10 = Pd
T90/B
T125/B 82 10 5/10 = Pd
CTP
ST/1B
T 50
CAR
T 82
T 90
T125
5.0 m
5.0 m
B C
A D
A // B // C // D
1 2 3
Fix the fishplate to the guide-rails Place the collecting oil tray and the Install the guide rails starting
segments, on the side with the beam, on the bottom of the pit or from the bottom of the pit
“male” connection part. on the pre-set cement base and positioning the “male” part
level it using a bubble level, upwards into the groove.
complying with the indications of Connect the guide-rails
the project drawing. segments using the
connection plate
4 5 6
Mount the counter-bracket using Perform the same procedure to Check the distances referring to
the related fixing material install all guide-rails and the project drawing and verify
brackets. the verticality of the guide-rails
in comparison to the plumbing
and the position template.
2 SLING
ATTENTION
The following instructions refers to parts subject to modifications not dependent by Gmv Spa,
therefore, for a correct and safe installation ALWAYS refer to the instructions provided by the
manufacturer with the component.
ATTENTION
It is recommended to operators to use ALWAYS, seat belts and appropriate
lifting equipment.
1500 kg
50
P
220
A 8
D F
Overload
(Alarm - System Stop)
Load + 10% with a
minimum of 75 kg
~2
mm
~ 5Kg
M10x60
Floor covering
• Place the middle of the ropes into the grooves of the traction pulley without connecting the ends to the
wire terminals
• Do not remove any protection device.
3.2 ROPES
3.2.1 ROPING OF THE SYSTEM 1:1
For a correct and safe roping of the system, if not differently indicated in the manual of the supplied sling,
refer to the following procedure:
Pass one of the rope end into the wedge socket termination.
Fix the rope with the supplied clamps.
Hook the wedge socket termination to the fixed connection
element of the sling.
Pass the other end of the rope into the wedge socket termination
and fix it with the clamps.
Hook the second wedge socket termination to the ropes
connection on the counterweight frame without weights.
Repeat the same procedure for all ropes with one of the following
sequences.
The rope terminations shall not make noise during the travel of
the lift.
10 6 2 3 7 x
8 4 1 5 9 864213579 9 7 5 3 1 2 4 6 8 10
x9 x10
8 4 1 5 9
10 6 2 3 7
Ctp Arcata
3.2.2 ROPING OF THE SYSTEM 2:1
For a correct and safe roping of the system, refer to the following procedure:
Pass one of the rope end into the wedge socket termination.
Fix the rope with the supplied clamps.
Hook the wedge socket termination to the fixed connection
element on the beam of the frame for machine.
Pass the other end of the rope into the wedge socket termination
and fix it with the clamps.
Hook the wedge socket termination to the other side of the fixed
connection element on the beam of the frame for machine.
Repeat the same procedure for all ropes with one of the following
sequence.
The rope terminations shall not make noise during the travel of
the lift.
3 6 6 3 3 6 6 3
4 4 4 4
2 7 7 2 2 7 7 2
5 5 5 5
1 1 1 8 8 1
76 78
5 56
34 34
12 12
4 4 4 4
3 3 3 10 10 3
5 5 5 5
2 9 9 2 2 9 9 2
6 6 6 6
1 8 8 1 1 8 8 1
7 7 7 7
98 9 10
76
54 78
3 56
12 34
12
3
5
150
2
~ 250 mm
~ 250 mm
NOTE NOTE
Asymmetric wedge socket terminations Symmetric wedge socket terminations
UNI EN 13411-6, X Max = 75% Y UNI EN 13411-7, X Max = 40% Y
3.3 FINAL OPERATIONS ON THE SLING
3.3.1 POSITION OF THE FINAL LIMIT SWITCH
max 50mm
EXS
EXS/EXD
ü0
ð
EXD
max 50mm
5 x M6x20
M12x35
M12x30
~ 400
~
M5x20
M5x20
~ 170
3.5 CHECKS
3.5.1 CHECKS FOR STNDARD SYSTEMS
• Verify that the free distance between buffer and sling is the same specified in the project.
þ • Verify that the distance between sling shoes is the same specified in the project.
• Verify that the buffers are perfectly perpendicular and corresponding with support points under the
sling.
For the installation refer to the instructions of the manual of the supplied car.
If necessary, install panels, roof and cabin doors after the landing doors and the electrical material.
ATTENTION
Do not remove the protection film from the exposed side of angles, uprights, roof, panels and
accessories until specified, since the film preserves their integrity.
ATTENTION
The sill shall be flush.
ATTENTION
Protect the covering floor (for example using a cardboard) to preserve its integrity during the
assembly
5 LANDING DOORS
For the installation refer to the instructions of the manual of the supplied doors
ATTENTION
If the emergency devices (remote push-button) are placed inside the upright verify that the door with
the above devices is installed at the correct floor (normally the lower landing floor).
6 ELECTRICAL MATERIAL
For a correct and safe installation, follow the instructions of the ELECTICAL PART MANUAL and the W IRING
DIAGRAMS, paying attention to the following:
ATTENTION
The flexible cables should be fixed (A) to the wall in the upper middle part of the well, in a position
such as they do not touch (B) the car and (C) the pit.
6.1.2.3 CONNECTION CABLES
The connection cables are used to make easier some connections on the car’s roof and in the machine room
and must be set and fixed thoroughly into the trunks to avoid damaging them.
ATTENTION
Do NOT cut the exceeding cables
max 50mm
EXS
EXS/EXD
EXD
max 50mm
1. Anti-creeping coil
6.6 ACCESSORIES
6.6.1 CONNECTION OF THE WELL LIGHTING
Install the well lighting, referring to the instructions of the MANUAL OF THE ELECTRICAL PART supplied and in
accordance with the requirements of the current regulations with particular reference to the EN 81-20.
NOTE
min 2000
mechanical device must always be
carried out in accordance with the
dimensions of the project design.
3500
SBA
min 500
2000
~1150
OFF
T82 T90 T125
1000
12
ON SBA
T82 T125
66.5
T90 80.5
T2
= =
M 12
100
50
M 12x35
M 12x35
M 12
M 4x30
9 FINAL OPERATIONS
9.1 ADVICES
Verify that non authorised personnel should not enter into the machine room (always keep it locked)
Verify that all protections are mounted on the power unit (electrical connections covering, tank).
Do not lean on nor sit on the traction machine.
Do not set containers with liquids on the clamp board (danger of short-circuit).
Always inform the responsible of the arrival. Before setting the plant out of work, hang the “out of service”
signs to every landing door.
Do not leave components, parts, tools, oil or grease stains on the floor.
Pay attention to any contact when operating on rotating devices or on devices that remained under tension.
ATTENTION
Never exclude the safety circuits.
Before moving the lift-car, verify the correct operation of the emergency button on the roof.
During the movement tightly support with the post or other parts of the lift-car and in any case not with the
ropes.
Pay particular attention during the upward travel.
At the end of the operations, please verify that all protections have been mounted and lock the machine
room.
9.2 FINAL OPERATIONS
At the end of the installation it is necessary to perform a test of the plant, in compliance with the standards in
force.
• This test is performed by the installer (if qualified by a certified Quality System in compliance with UNI EN
ISO 9000) or by a notified organism according to the Lift Standards
If the test gives a positive result, it is necessary to communicate that the installation has been performed,
indicating:
- The address of the building.
- The speed, the rated load, the travel, the number of stations and the starting type
- Name or name of the company of the installer.
- Copy of the compliance certificate.
- Name of the company in charge of the maintenance of the plant
- Name of the individual in charge of the periodical maintenance interventions on the plant
GMV SPA
VIA DON GNOCCHI, 10 - 20016 PERO – MILANO (ITALY)
TEL. +39 02 33930.1 - FAX +39 02 3390379
STRADA PER BIANDRATE, 110/112 - 28100 NOVARA (ITALY)
TEL. +39 0321 677611 - FAX +39 0321 677690
HTTP://WWW .GMV.IT - E-MAIL: [email protected]