Pmi Pba Hours Worksheet

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 7

PMI-PBA℠ Certification Hours

INSTRUCTIONS

NOTE: This Excel spreadsheet assumes an average level of Excel expertise to use.

WORKBOOK: How to use this spreadsheet:


Summary Complete the Worksheet tab and list and number each project you worked on.
Copy additional rows for each project you report on.
Project Section
· You can look back over 8 years, and need 4500 hours of BA work on those projects.
· Begin with your most recent project and work backwards
· For each project, enter the start and end date you worked on each project/initiative
· Enter the approximate percentage of your time spent on each project/initiative
If the percentage time for a single project changed over the life of the project, enter a separate line for each time
frame.

The total percentage for any time frame should not exceed 100% (keeping at 80% is recommended)
· The worksheet will calculate the total project hours for you.

Activities by Domain Section - Percentages


· Estimate the percentage of total project time spent doing tasks within the domain (hover on column title for a
description of each domain)

· Total percentages entered should equal 100%, there is a check column included to verify

Activities by Domain Section - Hours


· The spreadsheet will calculate the number of hours in each domain
· You will enter these hours into the online PMI-PBA℠ application

NOTE Pass this template on to friends and colleagues who want to apply for the PMI-PBA℠ Certification.
As a courtesy, please leave our name and contact information on this worksheet.
Contact us at 800-646-9362 for additional copies or more information on PMI-PBA℠ Certification Preparation.
Or, visit www.WatermarkLearning.com/PMI-PBA for more information, including tips to help you
prepare for the PMI-PBA℠ exam.
ver. 1.1
Developed by Watermark Learning
www.WatermarkLearning.com
800-646-9362

es an average level of Excel expertise to use.

st and number each project you worked on.


ect you report on.

and need 4500 hours of BA work on those projects.


ct and work backwards
nd end date you worked on each project/initiative
e of your time spent on each project/initiative
project changed over the life of the project, enter a separate line for each time

e frame should not exceed 100% (keeping at 80% is recommended)


otal project hours for you.

ercentages
oject time spent doing tasks within the domain (hover on column title for a

d equal 100%, there is a check column included to verify

e number of hours in each domain


e online PMI-PBA℠ application

d colleagues who want to apply for the PMI-PBA℠ Certification.


and contact information on this worksheet.
nal copies or more information on PMI-PBA℠ Certification Preparation.
m/PMI-PBA for more information, including tips to help you
Project or Initiative Title Start Date End Date Duration in Months
0
0
0
0
0
0
0
0
0
Enter as a % of project time to equal 100%

% of total time spent


on project
(recommend not to
exceed 80%) Hours on Project Needs Assessment Planning Analysis
0
0
0
0
0
0
0
0
0
0
ct time to equal 100% Hours by Domain

Traceability & Needs


Monitoring Evaluation Check Assessment Planning Analysis
0% 0.00 0.00 0.00
0% 0.00 0.00 0.00
0% 0.00 0.00 0.00
0% 0.00 0.00 0.00
0% 0.00 0.00 0.00
0% 0.00 0.00 0.00
0% 0.00 0.00 0.00
0% 0.00 0.00 0.00
0% 0.00 0.00 0.00
0.00 0.00 0.00
by Domain

Total
Traceability & Hours All
Monitoring Evaluation Domains Project Description
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00
BA Education Hours
Course Institution Dates Hours Total: 0

You might also like