Description of Works Quan-Tity Unit Input Kind Description (1) (2) (3) (4) (5) (6) (7) Norms Code Item Code

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 40

Norms Item Unit Input

Code Code Description of Works Quan-tity Kind Description


[1] [2] [3] [4] [5] [6] [7]

###
EARTH WORK IN EXCAVATION
2.1 1.1a Excavation of soft clay & silty soils including 1.00 Cum Machine Excavator
disposal up to 10 m lead & 1.5m lift) including
hauling upto 200m (0.9m3 bucket)

Earthwork in embankment including compaction Cum


1.1b with watering & dressing, earth haulage upto
200m.
1.00 Labour Skilled
Unskilled

Tools & Equipment


Machine Roller
Bulldozer
Water Tanker
2_25-b 2.2.a 1 Cum Labour Unskilled
Earthwork in filling with 15cm thick soil, including Equipment Tools & Equipment
lead 10m & 1.5m lift & manually compaction
without sprinkle of water
Earthwork in filling with 15cm thick soil, including Cum
2.2.b lead 10m & 1.5m lift & manually compaction with
2_25-a sprinkle of water 1 Labour Unskilled
Equipment Tools & Equipment
2 CEMENT CONCRETE WORKS
7-2-d 2.1 Concreting of foundations, vertical faces, walls, in 1 Cum Labour Skilled
1:2:4 (M15) PCC for RCC, cement sand
aggregate mix including supply of materials and Unskilled
haulage distance upto 30m
Materials Cement
Aggregates (40 mm)

Aggregates (20 mm)

Aggregates (10 mm)

Sand
7.4-b 2.2 Concreting of super structure, Vertical faces, Deck 1 Cum Labour Skilled
Slab, Beams, Walls of ratio 1:1.5:3 (M20)
including supply of materials and haulage distance Unskilled
upto 30 m
Materials Cement
Aggregates (20 mm)

Aggregates (10 mm)

Sand
7-2-c 2.3 Concreting of foundations, vertical faces, walls, 1 Cum Labour Skilled
Abutment in 1:3:6 (M10) cement sand aggregate
mix including supply of materials and haulage Unskilled
distance upto 30m
Materials Cement
Aggregates (40 mm)

Aggregates (20 mm)

Coarse Sand

3 REINFORCEMENT
7-5 3.1 1 MT. Labour Skilled

Cutting , bending , placing in position and binding Unskilled


of reinforcement steel bars as per the Materials Rebars
design/drawing for RCC works including haulage
to 30m distance. Binding Wires
3.2 Making and errectin Trashracks all complete 1 MT. Labour Skilled
Unskilled
Foreman
Welder
Materials Rebars
Paint
4 GABION WORKS & BOULDER WORKS
16-11 4.1 Boulder supply and filling into Gabion Boxes 1 Cum Labour Unskilled
Material Stone
sqm
Supplying of Machine madeGI wire gabion Boxes
4.2 of Mesh size 100mm*120mm with heavy coated 1
GI wires (Mesh wire :3mm, selvedge wire 3.9mm
and Lacing wire 2.4mm)

Making gabion boxes incl. cutting wire & netting


etc.Hexagonal mesh size 100mm*120mm Mesh
4.3 wire -10SWG salvedge wire -7SWg
a Box size 2m x 1m x1m 1 Each Labour skilled
Labour unskilled
Material G.I. wire
b Box size 3m x 1m x 1m 1 Each Labour skilled
Labour unskilled
Material G.I. wire
c Box size 3m x 1m x 0.5m 1 Each Labour skilled
Labour unskilled
Material G.I. wire
d Box size 3m x 1m x 0.3m 1 Each Labour skilled
Labour unskilled
Material G.I. wire

Making rectangular gabion box ( 3m x 1.5m x 0.75


m) with two way knot incl. wire cutting,netting etc.
4.4 complete.
Mesh size 100mm x 100mm
Mesh wire - 10 SWG
a Selvedge wire - 7 SWG 1 Each Labour skilled
Labour unskilled
Material G.I. wire
Mesh size 150mm x 150mm
Mesh wire - 10 SWG
b Selvedge wire - 7 SWG 1 Each Labour skilled
Labour unskilled
Material G.I. wire
Cum
Laying of 75 mm thick layer of Gravell filter of size
4.5 7.5 to 6 mm stone aggregate in canal bed and
sides including compaction, levelling, dressing etc
23-23 complete haulage 10m and lift 1.5m. Norms-23-3. 1 Labour Unskilled
5 STONE WORK
6_5 Stone soling in foundation and levelling including Cum
5.1
haulage distance up to 30 m. 1 Labour Unskilled
Materials Stone
6 BIO-ENGINEERING
Turfing: Grass Sodding works including sod Sqm
Cutting, Transporting, Placing in Position and
6.1 Water Sprinkling ( All lift) Using Tools, Equipment,
2.4 materials, manure etc 1 Labour Unskilled
Unskilled
(Haulage)
Sqm
6.2 Geo-Textiles: Supplying & laying of Geo-textile
filter of Terram 1000 grade below boulder pitching 1 Labour Unskilled
Material Geo-textile
Input Grand Unit Item
Quantity Unit Rate Amount Total Contractor's OH Total Rate Remarks
[8] [9] [10] [11] [12] [13] [14] [15] [16]

0.0128 Hr 4,664.33 59.7 59.7 8.955 68.655 68.655

M-day

0.0030 655.00 1.96 104.76 15.714 120.48 120.48


0.05 M-day 555.00 27.75
3% of % 0.83
unskilled
0.0167 Hr 2,825.86 47.19
0.0051 Hr 3,930.26 20.04
0.0043 Hr 1,626.30 6.99
0.25 M-day 555.00 138.75 142.91 21.437 164.35 164.35
3% 4.16

0.5 M-day 555.00 277.5 285.83 42.874 328.70 328.70


3% 8.33

1 M-day 655.00 655 12,228.07 1834.211 14062.28 14062.28


4 M-day 555.00 2220
0.32 Mt 18,631.67 5962.13
0.52 Cum 3,020.00 1570.4
0.22 Cum 3,020.00 664.4
0.11 Cum 4,063.40 446.97
0.445 Cum 1,593.65 709.17
0.8 M-day 655.00 524 15438.74 2315.811 17754.55 17754.55
7 M-day 555.00 3885
0.4 Mt 18,631.67 7452.66
0.57 Cum 3,020.00 1721.4
0.29 Cum 4,063.40 1178.38
0.425 Cum 1,593.65 677.3
1 M-day 655.00 655 10410.77 1561.616 11972.39 11972.39
4 M-day 555.00 2220
0.22 Mt 18,631.67 4098.96
0.65 Cum 3,020.00 1963
0.24 Cum 3,020.00 724.8
0.47 Cum 1,593.65 749.01
12 M-day 655.00 7860 33473.87 5021.081 38494.95 38494.95
12 M-day 555.00 6660
1.05 kg 1710.17 1795.67
10 Kg 1715.82 17158.2
0 M-day 655.00 0 105024.9 15753.731 120778.60 120778.60
50 M-day 555.00 27750
51 M-day 655.00 33405
52 M-day 655.00 34060
1.05 kg 1710.17 1795.67
3.91 Lit 2,049.67 8014.2

0.5 M-day 555.00 277.5 2012.2 301.830 2314.03 2314.03


1.1 Cum 1,577.00 1734.7

1 kg 245.29 245.29 245.29 36.794 282.08 282.08

0.45 M-day 655 294.75 42624.05 6393.608 49017.66 49017.66


0.2 M-day 555 111
24.15 kg 1748.17 42218.3
0.63 M-day 655 412.65 61928.81 9289.322 71218.13 71218.13
0.28 M-day 555 155.4
35.1 kg 1748.17 61360.76
0.45 M-day 655 294.75 42624.05 6393.608 49017.66 49017.66
0.2 M-day 555 111
24.15 kg 1748.17 42218.3
0.37 M-day 655 242.35 34863.05 5229.458 40092.51 40092.51
0.17 M-day 555 94.35
19.75 kg 1748.17 34526.35

0.7 M-day 655 458.5 58392.31 8758.847 67151.16 67151.16


0.44 M-day 555 244.2
33 kg 1748.17 57689.61

0.5 M-day 655 327.5 35401.9 5310.285 40712.19 40712.19


0.2 M-day 555 111
20 kg 1748.17 34963.4

1.4 M-day 555 777 777 116.550 893.55 893.55


1.5 M-day 555 832.5 2724.9 408.735 3133.64 3133.64
1.2 cum 1,577.00 1892.4
0

0.05 M-day 555 27.75 37.74 5.661 43.40 43.40

0.018 M-day 555 9.99

0.04 M-day 555 22.2 1905.03 285.755 2190.78 2190.78


1.1 Sqm 1711.67 1882.83
Metalled
Quantity Rate first Rate after
Material Road
S. No. Materials Unit Rate Carried by 20 km, 20 km,
Available at distance,
the Truck NRs/6 mt NRs/km/mt
km
1 Cement Mt 17,000.00 Biratnagar 6 8 3,730.00 60.00
2 Aggregates (40 mm) m3 2220.00 Quarry Site 6 3,730.00 60.00
3 Aggregates (20 mm) m3 2220.00 Quarry Site 6 3,730.00 60.00
4 Aggregates (10 mm) m3 3263.40 Quarry Site 6 3,730.00 60.00
5 Sand m3 793.65 Quarry Site 6 3,730.00 60.00
6 Coarse Sand m3 793.65 Quarry Site 6 3,730.00 60.00
7 Rebars (Fe 500) 10-20mm kg 78.5 Biratnagar 6 8 3,730.00 60.00
8 Binding Wires Kg 84.15 Biratnagar 6 8 3,730.00 60.00
9 Paint (White Primer) Lts 418 Biratnagar 6 8 3,730.00 60.00
10 Stone m3 777.00 Quarry Site 6 3,730.00 60.00
11 G.I. wire Kg 96.5 Biratnagar 6 8 3,730.00 60.00
12 Geo-textile Kg 80 Biratnagar 6 8 3,730.00 60.00
Other Rate of Rate
Rate first Rate after Transportat Load
Road Load Royalty, including
20 km, 20 km, ion Cost, Unload Remarks
distance, Unload per NRs Transportat
NRs/6 mt NRs/6 mt NRs cost, NRs
km truck ion, NRs
3 4,800.00 70.00 1,421.67 1260 210.00 18,631.67
3 4,800.00 70.00 800.00 3,020.00
3 4,800.00 70.00 800.00 3,020.00
3 4,800.00 70.00 800.00 4,063.40
3 4,800.00 70.00 800.00 1,593.65
3 4,800.00 70.00 800.00 1,593.65
3 4,800.00 70.00 1,421.67 1260 210.00 1,710.17
3 4,800.00 70.00 1,421.67 1260 210.00 1,715.82
3 4,800.00 70.00 1,421.67 1260 210.00 2,049.67
3 4,800.00 70.00 800.00 1,577.00
3 4,800.00 70.00 1,421.67 1380 230.00 1,748.17
3 4,800.00 70.00 1,421.67 1260 210.00 1,711.67
COST OF COLLECTION OF LOCAL MATERIALS
Ref. Labor
Source /
S.N. Construction Material Unit Page Unskilled Rate Amount
Size
& No. M-day NRs. NRs.
1 Fine Aggregate (Sand) 65% Cum 9,3-1d 1.43 555.00 793.65
2 Coarse Aggregate - 1 5-70 mm Cum 9,3-2a 2.50 555.00 1387.50
3 Coarse Aggregate - 2 5 - 40 mm Cum 9,3-2b 4.00 555.00 2220.00
4 Coarse Aggregate - 3 5 - 20 mm Cum 9,3-2c 5.88 555.00 3263.40
5 Boulders > 300 mm Cum 9,4 1.40 555.00 777.00
6 River Bed Material Cum 3,2-2 0.82 555.00 457.32
RATE OF LABOUR
S.No. Item Unit Rate Remarks
1 Skilled M-day 655.00
2 Unskilled M-day 555.00
3 Cost of Truck, 6 MT No 3,200,000.00 Market rate
Equipments

Description Excavator Dozer Vibrator Roller


(Kobelco upto 110 (CAT-D6H)
HP) 0.90m3 180 HP (10 ton)

1. Hire charge/ Hr (as per District Rate) 2,860.00 1,800.00 1,730.00


Sub-total-1
2.Hourly Cost of Consumables Unit Rate Quantity Amount Quantity Amount Quantity
High Speed Diesel Lit 97.5 15.00 1,462.50 20 1,950.00 10
Mobil Lit 486.72 0.17 82.74 0.15 73.01 0.127
Greese Kg 539.82 0.20 107.96 0.02 10.80 0.05
Gear Oil Lit 508.84 0.037 18.83 0.04 20.35 0.053
Hydraulic Oil Lit 508.84 0.26 132.30 0.08 40.71 0.01
Transmission Oil Lit 442.47 - 0.08 35.40
Sub-total-2 1804.33 2130.26 1095.86
Hourly Cost 4,664.33 3,930.26 2,825.86
ts

Vibrator Roller Water Tanker (TATA


(10 ton) SE 1210/48) Upto 8 KL

1,730.00 550.00

Amount Quantity Amount


975.00 10.00 975.00
61.81 0.137 66.68
26.99 0.05 26.99
26.97 0.02 7.63
5.09 - -
- - -
1095.86 1076.30
2,825.86 1,626.30
No Item Detail Unit No
1 Gabion boxes
Box size 3m x 1m x 0.3m Along slope of dike No. 0
Box size 3m x 1m x 0.3m Along slope of dike No. 2
Box size 3m x 1m x 1m Along base of dike No. 0
Box size 3m x 1m x 0.5m Along base of dike No. 0
Box size 3m x 1m x 0.5m Along base of dike No. 1

2 Boulder filling in gabion boxes


Box size 3m x 1m x 0.3m Along slope of dike m3 6
Box size 3m x 1m x 0.3m Along slope of dike m3 2
Box size 3m x 1m x 1m Along base of dike m3 1
Box size 3m x 1m x 0.5m Along base of dike m3 1
Box size 3m x 1m x 0.5m Along base of dike m3 2

3 Grass turfing (Dike) Along Dike slopes m2 1


Along top width of Dike m2 1
Along Dike slopes m2 1

4 Gravel Packing (Dike) Along slope of dike m3 1


Along slope of dike m3 1
Along slope of dike m3 1

5 Geo Textile (Dike) Along slope of dike m2 1


Along slope of dike m2 1
Along slope of dike m2 2
Length Breadth Height Quantity Quantity (per m) Remarks

0 0
2 2
0 0
0 0
1 1

1 3 0.3 5.4 1.800


1 1 0.3 0.6 0.200
1 1 1 1 0.333
1 3 0.5 1.5 0.500
1 1 0.5 1 0.333

1 3.36 3.36 3.360


1 5 5 5.000
1 7.22 7.22 7.220

1 7.83 0.2 1.566 1.566


1 0.06 0.51 0.0306 0.031
1 0.06 0.5 0.03 0.030

1 7.83 7.83 7.830


1 0.51 0.51 0.510
1 0.12 0.24 0.240
0
0
1 0
1 0
1 0
1 0
No Item Detail Unit No Length

1 Boulder pitching Along slope of dike m3 1 1


Along base of dike m3 1 1

2 Grass turfing ( Boulder pitched Dike) Along Dyke slopes m2 1 1


Along top width of Dike m2 1 1
Along Dyke slopes m2 1 1

3 Gravel Packing( Boulder pitched Dike) Along slope of dike m3 1 1


Along slope of dike m3 1 1
Along slope of dike m3 1 1

4 Geo Textile ( Boulder pitched Dike) Along slope of dike m2 1 1


Along slope of dike m2 1 1
Along slope of dike m2 2 1
Breadth Height Quantity (per m) Remarks

7.83 0.4 3.132


5.5 0.6 3.3

3.36 3.36
5 5
7.22 7.22

7.83 0.2 1.566


0.07 0.62 0.0434
0.07 0.6 0.042

7.83 7.83
0.62 0.62
0.14 0.28
No Item Detail Unit No Length Breadth
1 Concrete blocks
0.4m x 0.6m Along base of Dike m3 11 1 0.4
0.4m x 0.3m Along slope of dike m3 17 1 0.4
0.4m x 0.3m Along slope of dike m3 1 1 0.21

2 Sand filling Along slope of dike m3 17 1 0.05

2 Grass turfing (Concrete Block dike) Along Dike slopes m2 1 1 3.32


Along top width of Dike m2 1 1 5
Along Dike slopes m2 1 1 7.19

3 Gravel Packing (Concrete Block dike) Along slope of dike m3 1 1 7.83


Along slope of dike m3 1 1 0.06
Along slope of dike m3 1 1 0.06

4 Geo Textile (Concrete Block dike) Along slope of dike m2 1 1 7.83


Along slope of dike m2 1 1 0.51
Along slope of dike m2 2 1 0.12
Height Quantity (per m) Remarks

0.5 2.2
0.3 2.04
0.3 0.063

0.3 0.255

3.32
5
7.19

0.2 1.566
0.51 0.0306
0.5 0.03

7.83
0.51
0.24
No Item Detail Unit No Length Breadth
1 Gabion boxes
Box size 3m x 1m x 0.5m 5th step No 75
Box size 3m x 1m x 0.5m 4th step No 15
Box size 3m x 1m x 0.5m 3rd step No 10
Box size 3m x 1m x 0.5m 2nd step No 10
Box size 3m x 1m x 0.5m 1st step No 5

2 Boulder filling in gabion boxes


Box size 3m x 1m x 0.5m 5th step m3 15 15 1
Box size 3m x 1m x 0.5m 4th step m3 3 15 1
Box size 3m x 1m x 0.5m 3rd step m3 2 15 1
Box size 3m x 1m x 0.5m 2nd step m3 2 15 1
Box size 3m x 1m x 0.5m 1st step m3 1 15 1
Height Quantity Quantity (per m) Remarks

75 75
15 15
10 10
10 10
5 5

0.5 112.5 37
0.5 22.5 7
0.5 15 5
0.5 15 5
0.5 7.5 2
S.N Particulars of Items
1 Earthwork in excavation in foundation abutments

2 Earthwork in excavation in foundation Wing Walls

3 Earthwork in filling

4 Concreting for RCC M20


a Sub structure

b Super structure

5 Gravel packing

6 Pcc

7 Gabion box

8 Boulder filling in gabion boxes


Details Unit No. L B H
Straight part m3 1 13 2.1 0.55
Inclined part m3 1 4.08 1 0.55
Long side m3 2 2.5 0.6 2.5
Long side m3 2 1.5 0.6 2.5
Short side m3 2 1 0.6 1.5

Below ground level m3 1 9.318


Top of box culvert ( both side half portion) m3 1 8.030 1.2 1.05
Side filling ( both side half portion) m3 2 27.980 1 2.5
Side filling ( both side half portion) m3 2 11.127 1 2.89
Top of box culvert ( both side half portion) m3 1 2.800 1 1.2

Below ground level Long side wing walls m3 2 2.5 0.2 2.5
Below ground level Long side wing walls m3 2 1.5 0.2 2.5
Below ground level short side wing walls m3 2 1 0.2 1.5
Below ground level for abutments m3 2 13 0.25 0.25
Below ground level for abutments m3 2 1.83 0.25 0.25

Box portion m3 1 1.5 1 10.83


Ahead of gate (st. part) m3 2 1.82 0.25 2.5
Wings m3 2 2.25 0.2 2.5
Wings m3 2 1.5 0.2 2.5
Abutments (back inclined portion) m3 2 1.83 0.2 1.5
Wings m3 2 1 0.2 1.5
Abutment walls (top) m3 2 13 0.25 1.05
Above gate (front & back) m3 2 1.2 0.25 1.05

Below ground level for abutments m3 1 13 2.55 0.2


Below ground level for abutments (trapizoidal shape) m3 1 4.61 1 0.2
Wings (long side) m3 2 2.5 1.9 0.2
Wings (long side) m3 2 1.5 1.9 0.2
Wings (Short side) m3 2 1 1.9 0.2

Below ground level for abutments m3 1 13 2.35 0.1


Below ground level for abutments (trapizoidal shape) m3 1 4.61 1 0.1
Wings (long side) m3 2 2.5 1.7 0.2
Wings (long side) m3 2 1.5 1.7 0.2
Wings (Short side) m3 2 1 1.7 0.2

Box size 3m x 1m x 0.5m (front) No. 12


Box size 3m x 1m x 0.5m (back) No. 4

Box size 3m x 1m x 0.5m (front) m3 12 3 1 0.5


Box size 3m x 1m x 0.5m (back) m3 4 3 1 0.5
Quantity Remarks
15.015
2.244 area=4.34
7.5
4.5
1.8

9.318
10.117
139.9 Area =27.98
64.314 16.3392
3.36 8.1696

2.5
1.5
0.6
1.625
0.228 5.65

16.245 Area= 1.5 29.6725


2.275 14.83625
2.25
1.5
1.098
0.6
6.825
0.63

6.63
0.922
1.9
1.14
0.76
0
0
3.055
0.461
1.7
1.02
0.68

12
4

18
6
No. Items Details Bar marks
Diameter @
A Along box culvert

a Top slab Top main bars 8@

Bottom main bars ( straight bars) 16 @

Bottom main bars ( crank bars) 16 @

Distribution bars 8@

b Bottom slab Top main bars (straight bars) 16 @

Top main bars (crank bars) 16 @

Bottom main bars 8@

Distribution bars 8@

c Outside walls Verticals bars 16 @

Distribution bars 8@

d Concrete fillet Hounch bars 12 @

B Abutments ( front) Verticals bars 12 @

Verticals bars 12 @

Distribution bars 8@

Top main bars (Bottom slab) 12 @

Bottom main bars (Bottom slab) 12 @

Distribution bars (Bottom slab) 8@

B Abutments ( Back inclined) Verticals bars 12 @


Verticals bars 12 @

Distribution bars 8@

Top main bars (Bottom slab) 12 @

Bottom main bars (Bottom slab) 12 @

Distribution bars (Bottom slab) 8@

B Wings ( front) Verticals bars 12 @

Distribution bars 10 @

Top& Bottom main bars (Bottom slab) 12 @

Distribution bars (Bottom slab) 10 @

B Wings ( front) Verticals bars 12 @

Distribution bars 10 @

Top& Bottom main bars (Bottom slab) 12 @

Distribution bars (Bottom slab) 10 @

B Wings ( Back) Verticals bars 12 @

Distribution bars 10 @

Top& Bottom main bars (Bottom slab) 12 @

Distribution bars (Bottom slab) 10 @

B Box culvert Top ( Both sides) Verticals bars 12 @


Verticals bars 12 @

Distribution bars 8@

B Box culvert Top (Front & Back) Verticals bars 12 @

Distribution bars 8@
Bar marks Bar shapes Bar length per m Nos Rows Total length/m
Spacing

1.56
350 0.5 0.5 2.56 32 1 81.92

150 0.5 0.5 2.56 37 1 94.72


1.56
300 2.69 37 1 99.53

Total 2.69
150 10.79 10.79 12 2 258.96

1.56
130 0.5 0.5 2.56 42 1 107.52
Total 2.69
260 2.69 42 1 112.98

350 0.5 0.5 2.56 32 1 81.92


1.56
150 10.79 10.79 12 2 258.96

150 1.6 2.6 73 4 759.2


0.5 0.5
150 10.79 12 4 517.92
10.79
300 0.2 1.08 37 4 159.84

0.68
0.2
2.7
130 0.5 0.5 3.7 17 2 125.8
2.7
250 0.5 0.5 3.7 10 2 74

110 2.08 2.08 26 4 216.32


2.11
250 0.5 0.5 3.11 10 1 31.1

140 0.5 0.5 3.11 16 1 49.76


2.11
110 2.08 21 2 87.36
2.08

1.65
130 0.5 0.5 2.65 16 2 84.8
1.65
250 0.5 0.5 2.65 9 2 47.7

110 1.99 1.99 16 4 127.36


2.11
250 0.5 0.5 3.11 9 1 27.99

140 0.5 0.5 3.11 15 1 46.65


2.11
110 1.99 20 2 79.6
1.99

2.65
130 0.5 0.5 3.65 20 4 292

340 2.46 2.46 9 4 88.56

1.46
190 0.5 0.5 2.46 14 4 137.76

320 2.46 6 4 59.04


2.46

2.65
130 0.5 0.5 3.65 12 4 175.2

340 1.46 1.46 9 4 52.56

1.46
190 0.5 0.5 2.46 9 4 88.56

320 1.46 6 4 35.04


1.46

1.65
130 0.5 0.5 2.65 8 4 84.8

340 0.96 0.96 6 4 23.04

1.46
190 0.5 0.5 2.46 7 4 68.88

320 0.96 6 4 23.04


0.96

0.7
130 0.5 0.5 1.7 84 2 285.6
0.7
250 0.5 0.5 1.7 44 2 149.6

110 10.79 10.79 8 4 345.28

0.7
130 0.5 0.5 1.7 10 4 68

110 1.16 1.16 8 4 37.12


weight/m Total weight Including wastage Remarks

0.395 32.358 35.593

1.578 149.468 164.414

1.578 157.058 172.763

0.395 102.289 112.517

1.578 169.666 186.632

1.578 178.282 196.11

0.395 32.358 35.593

0.395 102.289 112.517

1.578 1198.017 1317.818

0.395 204.578 225.035

0.888 141.937 156.13

0.888 111.71 122.881

0.888 65.712 72.283

0.395 85.446 93.99

0.888 27.616 30.377

0.888 44.186 48.604

0.395 34.507 37.957

0.888 75.302 82.832


0.888 42.357 46.592

0.395 50.307 55.337

0.888 24.855 27.34

0.888 41.425 45.567

0.395 31.442 34.586

0.888 259.296 285.225

0.617 54.641 60.105

0.888 122.33 134.563

0.617 36.427 40.069

0.888 155.577 171.134

0.617 32.429 35.671

0.888 78.641 86.505

0.617 21.619 23.78

0.888 75.302 82.832

0.617 14.215 15.636

0.888 61.165 67.281

0.617 14.215 15.636

0.888 253.612 278.973


0.888 132.844 146.128

0.395 136.385 150.023

0.888 60.384 66.422

0.395 14.662 16.128


Total kg 5089.579
Total tons 5.089
S.N Particulars of Items Details Unit No. L B
1 Gabion box Launching Apron (3m x 1m x 0.5m) No. 2
Box size 3m x 1m x 0.5m (at slope) No. 2
Box size 3m x 1m x 0.5m (at slope) No. 0
Box size 3m x 1m x 0.5m (at slope) No. 14
Box size 3m x 1m x 0.5m (at slope) No. 6
Box size 3m x 1m x 0.5m (at slope) No. 8
Box size 3m x 1m x 0.5m (at slope) No. 28
Box size 3m x 1m x 0.5m (at slope) No. 16

2 Boulder filling in gabion boxes Launching Apron (3m x 1m x 0.5m) m3 2 1 3


Box size 3m x 1m x 0.5m (at slope) m3 7 1 3
Box size 3m x 1m x 0.5m (at slope) m3 14 3 1
Box size 3m x 1m x 0.5m (at slope) m3 6 3 1
Box size 3m x 1m x 0.5m (at slope) m3 8 3 1
Box size 3m x 1m x 0.5m (at slope) m3 28 3 1
Box size 3m x 1m x 0.5m (at slope) m3 16 3 1

2 Gravel packing Along the ramp m3 1 13.33 1


H Quantity Quantity (per m) Remark
2 2
2 2
0 0
14 14
6 6
8 8
28 28
16 16

0.5 3 3
0.5 10.5 3.500
0.5 21 21
0.5 9 9
0.5 12 12
0.5 42 42
0.5 24 24

5 66.65 66.65 Area= 13.33

You might also like