Haradh & Hawiyah Field Gas Compression Plan Pre-Commissioning Notification

The document provides notification for pre-commissioning activities at the Haradh & Hawiyah Field Gas Compression Plant from July 3rd to 8th, 2021. Testing and commissioning will take place at the GIS building and gantry area, including filling and recovery of SF6 gas in the GIS and testing of various control panels. A subcontractor will perform the work, and minimum safety requirements are outlined for the restricted work area.

Uploaded by

Sathiya Seelan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
78 views1 page

Haradh & Hawiyah Field Gas Compression Plan Pre-Commissioning Notification

The document provides notification for pre-commissioning activities at the Haradh & Hawiyah Field Gas Compression Plant from July 3rd to 8th, 2021. Testing and commissioning will take place at the GIS building and gantry area, including filling and recovery of SF6 gas in the GIS and testing of various control panels. A subcontractor will perform the work, and minimum safety requirements are outlined for the restricted work area.

Uploaded by

Sathiya Seelan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

HARADH & HAWIYAH FIELD GAS COMPRESSION PLAN

PRE-COMMISSIONING NOTIFICATION

DATE FROM: 3-Jul-21 TO: 8-Jul-21


TIME: FROM: 07:00AM TO: 05:00PM
PROJECT SOUTH/ PACKAGE 3 UNIT 522-HDGCP-3
TESTING & COMMISSIONING ACTIVITY AT GIS BUILDING & GIL GANTRY AREA
PRE-COM ACTIVITY ALL LCC PANELS, EARTH SWITCH,PDMAR AND PDMCR PANEL
TESTING(522-310-CP-004 TO 522-310-CP-029 & 522-310-CP-047&048) FILLING AND RECOVERY OF SF6 GAS IN GIS.

Subcontractor NCC PTW Number NCCPC-00452

EQUIPMENT NUMBER LOCATION ACTIVITY ADDITIONAL INFORMATION


Testing & Commmissioning,punch point
522-310-SG-701 GIS ALL LCC PANEL TESTING
clearance

Area Incharge: sathya/0507134573

SUB-CONTRACTOR Area HSE: Jimmar / 0560914302

HSE Manager: Abdi / 0500481434

CONTACT INFO Precom Incharge: Moises/0592531720

CONTRACTOR Area HSE Incharge: Abdullah / 0540281055

Precom
Antonio / 0592464136
Superintendent

TR MEDICAL TEAM HOTLINE 0533 99 22 00


Minimum Requirements for Precom Restricted Area
1. Whoever need to work at indicated area shall take permission from Pre Com department prior to commence activity. (Precom PTW)
2. Related area must barricaded(hard barricade and blue tape) and posted Pre-Com signage.
3. Everyone who works at mentioned area must have Electrical Building Entry Pass.
4. Subcontractors must inform their employees regarding Restricted Area and minimum requirements.
5. Standby man must avaliable with entry log full time at the entrance of the restricted area.

ATTACHED MARKED LOCATION OF PLOT PLAN

ALL LCC PANEL TESTING AT GIS BUILDING and GANTRY AREA