529997276.xlsx General Requirements/1: Included

This document provides a bill of quantities for renovation works at the Bosporus KSA-Awan Gallery. It includes 18 items covering preliminaries, approvals, site set-up, demolition works, civil works like concrete screeding and waterproofing, precast concrete blocks, plastering, and handover documents. The total amount for the general requirements is listed as SAR Dhs 0.

Uploaded by

bassma Qu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
376 views33 pages

529997276.xlsx General Requirements/1: Included

This document provides a bill of quantities for renovation works at the Bosporus KSA-Awan Gallery. It includes 18 items covering preliminaries, approvals, site set-up, demolition works, civil works like concrete screeding and waterproofing, precast concrete blocks, plastering, and handover documents. The total amount for the general requirements is listed as SAR Dhs 0.

Uploaded by

bassma Qu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 33

Page 1 180915 BOQ Bosporus KSA-Awan Gallery

Time Amount
Item Description Unit Fixed Cost
rltd cost SAR Dhs
Preliminaries

File handling for concept and detailed design


submission, as built drawing issuance with site visits for
A actual reading and handling correspondences with mall 1 Item 0
management

KSA Modification Permit for fit out works and


related Certificates; Public health department, drainage
and irrigation department approval including completion
B 1 Item 0
certificate application and related inspections.

KSA Design modification permit for structure and lift


C cage approval. Including submission of steel load 1 Item 0
calculation and drawings

Electricity & Water approval on drawings including


D final inspection and final connection. 1 Item 0

Civil Defense application and approval on Fire safety


E and Gas system including related inspections and 1 Item 0
completion certificate.

Provision of all, Site Health and Safety requirements,


F tools, protective clothing and equipment as per Contract. 1 Item 0 INCLUDED

Risk, Care, Indemnities and Insurance; Third party as


G per mall requirements. 1 Item 0

Allow for Project Management team. Including site


H supervision staff as required 1 Item 0 INCLUDED

Carried To Collection SAR Dhs 0

Allow for necessary work shop drawings and MEP


drawings (HVAC, Electrical, Plumbing etc.) and to get
the approval from consultant/ designer; price includes
I submission of all required MEP specifications and 1 Item 0
calculation sheet for mechanical equipments.

Construction Plant and Tools


The Contractor shall be responsible for delivery to the
site all construction plant and tools which he needs to
carry out.
This responsibility shall include shipment, customs
clearance, off-loading, loading, handling, transportation
J to site and the removal of all redundant plant on 1 Item 0
completion of the works. He shall ensure timely delivery
of the same, and include for the safe storage of the
construction plant and tools.

529997276.xlsx GENERAL REQUIREMENTS/1


Page 2 180915 BOQ Bosporus KSA-Awan Gallery

Time Amount
Item Description Unit Fixed Cost
rltd cost SAR Dhs
Daily & Deep Cleaning
Removing rubbish, protective casings and covering
K including cleaning of site during fit out, as per Mall & 1 Item 0
KSA requirements

Final Cleaning. Including Removing rubbish, protective


L casings and coverings duriong worksSS 1 Item 0

Quality Control
The Contractor shall operate a Quality Control System
for his management procedures which should be of a
standard equivalent to that required by the Client. The
M system shall comply equally to the on and off-site 1 Item 0 INCLUDED
management of the works, goods and materials.

Temporary Works

Hoarding: Supply and Installation of vinyl sticker with


UV lamination on the existing glass in GF and FF both
N sides- including removal and cleaning prior to Handover 1 Item LS
& Hoarding installation if required.

O Water for the Works 1 Item 0 INCLUDED


P Lighting and power for the Works 1 Item 0 INCLUDED
Mock Up
Allow for all assosiated works for Mockup, including all
necessary works, coordination, etc, complete in
Q accordance with the Drawings, Specification and 1 Item 0 INCLUDED
Engineers approval

Hand over documents, as built drawings, Operation


Manual Documents inculding all subcontractors details
R and contacts, Certificates and inspection test from any 1 Item 0 INCLUDED
third parties.

Carried To Collection SAR 0

COLLECTION

Page No. 1/2 0

Page No. 2/2 0

529997276.xlsx GENERAL REQUIREMENTS/2


Page 3 180915 BOQ Bosporus KSA-Awan Gallery

Time Amount
Item Description Unit Fixed Cost
rltd cost SAR Dhs

TOTAL FOR GENERAL REQUIREMENTS


SAR Dhs 0
FOR THE WHOLE OF THE WORKS

529997276.xlsx GENERAL REQUIREMENTS/3


Unit Amount
Item Description Qty Unit
Rate UAE Dhs

DEMOLITION WORKS

A Dismantling and demolition of block works. 1.0 Item 0 0

CIVIL WORKS
Cement and Sand concrete screeding for entire dining floor
area. Th.<80MM 592.0 sqm 0 0

Sand, cement and coarse aggregate screed with mesh


B reinforcement on top for raise floor area in price includes
CMU block seperation built as support structure below the
slab

Concrete screeding for entire floor Kitchen GF&FF &


C Toilet floor area. Th.<200MM 233.5 sqm 0 0

Styrofoam 46kg/m3 density below the concrete slab in


D kitchen area GF& FF 199.8 sqm 0 0

Membrane waterproofing 2 layers -coating system applied


to smooth concrete surfaces & around pipes, gutters, drains
E at wet areas only, quantity includes 1 meter upstand on all 247.8 sqm 0 0
perimeter.
Location: Kitchen Area GF&FF

Supply and application of 1 layer of liquid waterproofing


F for Dining Area. GF&FF 592.0 sqm LS

Closure of (existing two opening in slab & the Landing


infornt of the guest lift) with interconnected steel
connection between existing and new slab, decking,
framework etc. as per KSA & Landlord requirements.
1.0 Item LS
Including design load calculation and submission of
method statement.
G

Precast concrete hollow blocks, CMU


bedded and jointed in cement and sand mortar (1:3)
including necessary concrete beams (chainage) for
reinforcement if necessary

H 150 MM thick straight walls, full height 265.0 sqm 0


I 150 MM thick straight walls, full height 178.0 sqm 0
J 100 MM thick straight walls, full height 8.8 sqm 0
Cement and sand plastering to all CMU NEW WALLS
K 260.0 sqm 0

Gypsum Wall Partition


Supply and instalaltion of full height gypsum wall with
metal studs and all necessary fixing accessories ready to
L received finish for the all exisiting Landlord walls and 1.0 sqm 0
structure for protection.

529997276.xlsx CIVIL DECORATION/4


Unit Amount
Item Description Qty Unit
Rate UAE Dhs
Supply and instalaltion of full height gypsum wall with
metal studs and all necessary fixing accessories ready to
M received finish for Additionaly VIP rooms and IT room. 1.0 sqm

Carried To Collection SAR 0

529997276.xlsx CIVIL DECORATION/5


Unit Amount
Item Description Qty Unit
Rate UAE Dhs

STEEL WORKS FOR 2 LIFT (Guest & Service)

- Fabrication, supply and fixing of 6Nos. of steel columns,


9.0m high each.
- Fabrication, supply and fixing of horizontal beams as per
the lift shop drawing .
- Fabrication, supply and fixing of lintel beam as per the lift
shop drawing.
- Fabrication, supply and fixing of lift hoist beam as per the
lift
- Provision for Lift engine mechanism on top and steel
A support provisions for the elevator rail from both sides of 2.0 Item LS
each shaft
- Cladding of the above steel structure to close the elevator
shaft, ready to receive finishing
- Any other related builders work. (to be confirmed on site)
with central double wall seperating both elevators

1-Service Lift inside the Kitchen.


2-Panoramic Guest Lift at the entrance.
Note: Steel structure works to be reviewed and designed by
specialist.

OTHER STEEL WORKS

Steel structure support for all mechanical equipments


including maintenance platform access for filter cleaning
and ladder access up to maintenance platform

B Full steel structure above first floor toilets to accommodate 1.0 item 0.0
HRU and for mainteannce of AHU. Load calculations to be
approved by Lanlord.
All machanical equipment to have mainteannce platoforms,
as per Mall requirements

Allow provisional Sum for Steel Structure support in L-


shape hanged on the existing slab above service counter for
drop down bulkhead made of interconnected horizontal and
D vertical steel beams. Steel design to be submited for Mall 1.0 Item LS 0
approval.

Supply and installation of MDF cladding from both sides of


E above structrure, ready to receive tile finish 1.0 Item 0

529997276.xlsx CIVIL DECORATION/6


Unit Amount
Item Description Qty Unit
Rate UAE Dhs

OTHER STEEL WORKS (CONT'D)

Construction of Lift support in steel structure including


G provision of scaffolding and working platform & removal 1.0 Item 0
after completion.

Fabricate, supply and installation of wrought iron


I ballustrade on First Floor in rose gold electroplating 15.0 Lm 0
finish including all necessary fixing support & accessories.

Fabricate, supply and installation of steel framing in First


K Floor arches in brass rose gold finish including all 3.0 No 0
necessary fixing accessories along

Fabricate, supply and installation of standing steel tube


L accent design under wash basin counter in Toilet in brass 4.0 Item 0
finish

10cm rose gold powder coated Stainless steel strip brush


M 10.4 Lm 0
finish for the toilet wall as per 3d.

Rose gold powder coated Stainless steel design brush finish


N 4.0 no.s
under the wash basins as per 3d.

Carried To Collection SAR 0

529997276.xlsx CIVIL DECORATION/7


Unit Amount
Item Description Qty Unit
Rate UAE Dhs

FLOORING

Kitchen, IT Room

FF-01 - Supply and install of 30cm x 30cm Ceramic Tile


(Beige) including cement and sand mortar backing,
A grouting and pointing with cement based water resistant 202.2 sqm 0
grout for Back of House.GF & FF

Dining
FF-03 - Supply and install of Marmara Parjama Marble
B including cement and sand mortar backing. GF & FF 444.1 sqm 0

FF-01 - Supply and install of 30cm x 30cm pattern tiles


from Turkey including cement and sand mortar backing,
grouting and pointing with cement based water resistant
C grout. 145.6 sqm 0
GF & FF

FF-04 -Supply and installation of Calcatta ORO Marble


for Toilet Floor fixed with cement and sand including water
D resistant grouting. 33.8 sqm 0
Location: Toilet - FF

Supply and installation of Marble Skirting on Dining Area


E 79.0 Lm 0

Supply and installation of carrara marble threshold with


F round edges fixed with cement & sand mortar backing for 3.0 No 0
toilet and kitchen entrances.

Carried To Collection SAR 0

529997276.xlsx CIVIL DECORATION/8


Unit Amount
Item Description Qty Unit
Rate UAE Dhs

CEILING FINISHES

Kitchen, IT Room ,

FCL-04 - 60x60 aluminum grid ceiling including necessary


A main beam, cross T, hanging wire and edge molding and all 202.2 sqm 0
accessories and support

Dining
Supply and installation of plain MDF plain ceiling in white
paint finish with necessary supports, ready to receive X-
B 386.1 sqm 0
Shapepyramid shape element.

FCL-01 - Supply and installation of White Wooden


Decorative Ceiling made up wooden off white finish in
C spray painted Finish as per 3d design including all 386.1 sqm 0
necessary fixing accessories.

FCL-02 - Supply and installation of gypsum board with


suspensions, grid and all necessary fixing accessories ready
D 179.3 sqm 0
to received finish.

FCL-03 - Supply and installation of Solid wood walnut


E Decorative Ceiling in 3D design for tree column. 64.6 sqm 0

F Supply and installation of gypsum indirect light bulkhead. 230.7 lm 0

Carried To Collection SAR 0

529997276.xlsx CIVIL DECORATION/9


Unit Amount
Item Description Qty Unit
Rate UAE Dhs

INTERIOR FINISHES WALLS

12.7 MM board wall cladding including metal furring


studs, including jointing, pointing and all necessary fixing
accessories

A Existing Wall at Kitchen Area sqm 0


679
B Existing Wall at Dining Area sqm 0
D Gypsum cladding for Counter Area 1 sqm 0

Kitchen & Preparation Area


Supply and Fixing glazed ceramic wall tiles; fixed with
cement-based water-resistant adhesive; grouted with
cement-based water-resistant grout.
200x300mm to ceramic wall tiles in glazed white color
F finish 629.0 sqm 0

Supply and installation of Carrara Marble Cladding fixed


G with heavy duty adhesive. Location: Visible Kitche 1.0 sqm 0
Display back Area Wall

Supply and installation of marble moulding on the full


H length of open counter fixed with heavy duty adhesive. 1.0 Lm 0

Open Counter
Supply and Installation of the below finishes on the open
counter fascia & bulkhead including all necessary fixing
accessories & support:

Supply and installation of 20x20cm turkish tiles fixed with


heavy duty adhesive
I
Supply and installation of 20x20cm marmara pajama
34.7 sqm 0
marble fixed with heavy duty adhesive

Supply and installation of 20x20cm backlit white plexi with


hinged opening on counte fascia
Supply and installation of 20x20cm 3D Blue Mashrabiya
Tile from Turkey fixed with heavy duty adhesive

529997276.xlsx CIVIL DECORATION/10


Unit Amount
Item Description Qty Unit
Rate UAE Dhs

INTERIOR FINISHES WALLS (CONT'D)

Dining
Supply and installation of Calcatta Marble fixed with
L necessary heavy duty adhesive. GF&FF cloumns and walls 237.8 Sqm 0

Supply and installation of Colored Mashrabiya Tile from


Turkey fixed with cement & sand mortar backing including
N water resistant grouting. Location: Wall inside 3 VIP 45.3 sqm 0
Rooms

Supply and installation of tiles in 3D Blue Mashrabiya Tile


from Turkey fixed with cement & sand mortar backing
including water resistant grouting.
O Location: 2 Existing Lift Walls 26.6 sqm 0

Toilet
Supply and installation of full slab Azul Marina Marble in
Dark Blue color fixed with cement and sand including
Q water resistant grouting. Location: Toilet Washing Area 11.0 sqm 0

Supply and installation of White Volakas Marble fixed with


R cement and sand including water resistant grouting. 203.0 sqm 0
Location:Toilet Area

Supply and installation of White Volakas Marble in water


jet cutting + brass inserts in rose gold finish as per design
S fixed with heavy duty adhesive. Location: Toilet Entry 13.0 sqm LS
Wall

Carried To Collection SAR 0

529997276.xlsx CIVIL DECORATION/11


Unit Amount
Item Description Qty Unit
Rate UAE Dhs

GLAZING

Supply and installation of double glazed frameless glass


panel including all necessary fixing accessories and
A support. 12.1 sqm 0
Location: Open Counter

DOORS

Supply and Installation of Double Swing Single Wooden


B fire rated Door . D1 FF Private dining room doors 850 3.0
X2200 mm
Supply and Installation of Double Swing Single Wooden
fire rated Door with viewing glass panel towards Kitchen
and Stainless steel cladding from inside inlcluding all
C necessary fixing accessories. D3 1200mm x 2200mm 1 Item 0

Supply and Installation of Wooden Single Door inlcluding


all necessary fixing accessories.
Location: Inside the kitchen D6 800 X 2200 mm 2 Item 0

D
Supply and Installation of double sliding glass Door
inlcluding all necessary fixing accessories.
Location: Inside the kitchen SD1 1500 X 2200 mm 1 Item 0

Supply and Installation of Wooden Single Door in paint


finish walnut finish inlcluding all necessary fixing
E accessories. D2 800X2200 1 Item 0
Location: IT

Supply and Installation of Wooden Single Door in paint


finish with CNC cut Mashrabiya Panel and Mirror backing
on both face inlcluding all necessary fixing accessories.
Location:Toilet Doors main entrance D4 1000X 2200 2 Item 0
mm

F
Supply and Installation of Wooden Single Door in paint
finish with CNC cut Mashrabiya Panel and Mirror backing
on both face inlcluding all necessary fixing accessories.
Location:Toilet Doors WC D5 800X 2200 mm 5 Item 0

Carried To Collection SAR 0

529997276.xlsx CIVIL DECORATION/12


Unit Amount
Item Description Qty Unit
Rate UAE Dhs

PAINTING

Prepare and apply one coats of acrylic putty filler, one coat
of acrylic water based hiding/primer, two finishing top
coats of FENOMASTIC mat paint or equal for required
area for Ceiling and bulkhead
A Normal Paint on Gypsum Ceiling
B Normal Paint for IT Room 1 Item LS
C Remaining areas where paint is needed

Prepare and apply one coats of acrylic putty filler, one coat
of acrylic water based hiding/primer, two finishing top
coats of FENOMASTIC mat paint or equal for required
area for WALL
D Stucco special paint (concrete effect) grey color 260 sqm 0

METAL WORKS

Supply and installation of steel in CNC Cutting mashrabiya


screen in rosegold electrostatic finish including all
C necessary support and accessesories. 39.3 sqm

Solid aluminum framing for the above mashrabiya in


D veneer finish with provision for lighting. LM LS

Carried To Collection SAR 0

529997276.xlsx CIVIL DECORATION/13


Unit Amount
Item Description Qty Unit
Rate UAE Dhs

JOINERY, WOOD WORKS

Supply and installation of 300x300x2mmthk glavanized


hollow tube framing with MDF backing for the Kitchen
counter fascia ready to receive pattern tiles, marble plexi
A glass including all necessary fixing support. 6.5 sqm LS

Fabricate , supply and installation of Skyline illuminated


wall design in aluminum CNC cut as per the design
B including all necessary support and accessories. (Size Sqm) 2 Item 0

Construction of dummy column in 50*50mm white wood


wooden structure including all necessary support.
E 2 No

LS
MDF Cladding on the above dummy column to replicate a
tree trunk in wooden veneer finish including all necessary
F support and fixing accessories. 2 No

Curved solid Wooden element acting as branches for tree


G ready to received LED light in aluminum profile including Lm LS
all necessary fixing accessories.

Wooden Shelves in Veneer finish for the above column


H Lm LS

Fabricate, supply and fixing Library Open Shelving made


up of steel framing in rose gold finish with MDF boxes in
selected spaces in veneer finish including all necessary
J fixing accessories.Including provision for backlihgt. 6.5 sqm 0

Construction of Cashier's Desk in wooden carcass,MDF


cladding, marble fascia and top, including access door and
L all necessary fixing accessories & support. 2.0 no

0
Fabricate ,supply and installation of under counter cabinet
for the above desk in melamine finish including all
M necessary hardwares. 2.0 no

529997276.xlsx CIVIL DECORATION/14


Unit Amount
Item Description Qty Unit
Rate UAE Dhs

JOINERY, WOOD WORKS (CONT'D)

Construction of counter in wooden carcass,MDF cladding


all necessary fixing accessories & support. Note: Open
N space under counter top for equipment: 5 Lm
Location: Near Beverage Area
0

Supply and installation Volakas Marble Top for the above


N counter 2.5 sqm

Fabricate , supply and installation of wash basin counter in


marble solid top with 20cm drop down including all
P necessary fixing accessories and support. 2 Item 0

Q Welcome Desk 1.0 No 0

Booth Seating & Furniture


Manufacture, supply and installation of L-shaped Seating
in wooden structure veneer finish including upholstery.
R 1 Item 0 EXCLUDED

Manufacture, supply and installation of U-shaped Seating


in wooden structure veneer finish including upholstery.
S 3 Item 0 EXCLUDED

Manufacture, supply and installation of Straight Seating in


wooden structure veneer finish including upholstery.
T 1 Item 0 EXCLUDED

U Low Table Nos 0 EXCLUDED

V Tables Nos 0 EXCLUDED

W Chairs Nos 0 EXCLUDED

X 1-Seater Sofa Nos 0 EXCLUDED

Y 2-Seater Sofa Nos 0 EXCLUDED

Carried To Collection SAR 0

529997276.xlsx CIVIL DECORATION/15


Unit Amount
Item Description Qty Unit
Rate UAE Dhs

SANITARY FITTINGS ( All finishes to be rose gold


powder coated)
Supply of below sanitary wares including installation.
(Brand to be selected by Client)
A Corsair wall Mounted WC Pan 4 Set 0
B Cor/Dre Soft Close Seat Cover Wh 4 Set 0
Sensor Type- Touchless- Geberit Concealed Cistern for
C 4 Set 0
Wall Hung WC
D Shattaf Spray & Valve 4 No 0
Openable Solid Top Ledge to concealed the flushing
E mechanism 4 No 0

F Counter Top wash basin. 4 No 0


Concealed 3 Hole Basin Mixer (Rose Gold) including
G 4 No 0
bottle trap
Mirror in rosegold framing including provision for backlit
H 4 No 0
I Towel dispenser, Bin & Hand Dryer Satin SS 2 No 0
J Dyson Airblade V Quiet Sprayed Nickel 2 No 0
L Toilet Paper Holder with Cover 4 No 0
M Waste Bin 4 No 0
N Surface Mounted Soap Dispenser Satin SS 2 No 0
O Robe Hook 4 No 0

Carried To Collection SAR 0

529997276.xlsx CIVIL DECORATION/16


Unit Amount
Item Description Qty Unit
Rate UAE Dhs

SIGNAGES

Fabricate, supply and installation of individually cut out 3D


letter reading "BOSPPORUS" and " Your Bridge to
Turkey" in English & Arabic including LOGO in
painted (RAL 9010) metal on the sides and frosted white
acrylic for the face with warm LED light including all
A necessary fixing accessories & support. 1 Item
Size:
Elevation 1

Fabricate, supply and installation of individually cut out 3D


letterl reading "BOSPPORUS" and " Your Bridge to
Turkey" in English & Arabic including LOGO in
painted (RAL 9010) metal on the sides and frosted white
acrylic for the face with warm LED light including all
B necessary fixing accessories & support. 1 Item
Size: 6000mmL x 2400mmH
Elevation 2A,1no

Fabricate, supply and installation of individually cut out 3D


letterl reading "BOSPPORUS" and " Your Bridge to
Turkey" in English & Arabic including LOGO in
painted (RAL 9010) metal on the sides and frosted white
acrylic for the face with warm LED light including all
C necessary fixing accessories & support. 1 Item
Size: 4000mmL x 1600mmH ,
Elevation 2B,1no

Fabricate, supply and installation of individually cut out 3D


letterl reading "BOSPPORUS" and " Your Bridge to
Turkey" in English & Arabic including LOGO in
painted (RAL 9010) metal on the sides and frosted white
acrylic for the face with warm LED light including all
D necessary fixing accessories & support. 1 Item
Size: 3000mmL x 1600mmH
Elevation 3

Carried To Collection SAR 0

529997276.xlsx CIVIL DECORATION/17


Unit Amount
Item Description Qty Unit
Rate UAE Dhs

COLLECTION PAGE

DEMOLITION & CIVIL WORKS 1 0

STEEL WORKS FOR LIFT 3 0

FLOORING 4 0

CEILING FINISHES 5 0

INTERIOR FINISHES WALLS 7 0

GLAZING,DOORS 8 0

PAINTING,METAL WORKS 9 0

JOINERY, WOOD WORKS 11 0

SANITARY FITTINGS 12 0

SIGNAGES 13 0

Carried To Main Summary SAR 0

529997276.xlsx CIVIL DECORATION/18


BILL OF QUANTITY_x000D_MEP WORK_x000D_BOSPORUS RESTAURANT - KSA

Unit Amount
Item Description Qty Unit
Rate UAE Dhs

PLUMBING INSTALLATIONS GENERALLY

Special type of fittings to be used, as per Landlord standards.

Supply and Installation of Sanitary works consisting of waste


pipes, fittings, including connection to existing system, related
civil works, testing, painting and all necessary work to
complete the system

A Wall drainage point, 1.5" points 0


B Floor drainage point, 4" floor traps points 0
C 150x150mm Steel Grating points 0
D Floor clean out points 0
E Sewer Point points 0
F Main connection to existing sewer pipe points 0

Supply and Installation of Water works consisting of pipes,


fittings, accessories, including connection to existing system,
related civil works, painting and all necessary work to
complete the system

G Hot and Cold water supply points points 0


H Water heater 90 Liters no 0
I Main connection with water supply no 0

Below sink internal Grease Trap As shown and specified in the


kitchen equipments layout
Type B Grease Trap to be installed in the parking ceiling area
J 1 no 0
with Steel supports and platform
K AG 2 Grease trap installed under the sink 1 no 0

L Scanning of existing concrete slab by specialized contractor


approved by Landlord for kitchen and toilet areas . Including
Method of Statement, Risk Assessment and scanning report 1 no 0
submission and coordination with Landlord for approval

M Coring of the above scanned points (at least 3 points) by


Landlord approved contractor. Including coordination and 1 no 0
approval

N Chemical treatment and water potability test 1 no 0

O Testing and Commissioning including gravity, flow and


1 no 0
pressure testing witnessed by Mall

SAR
529997276.xlsx MEP WORKS/19
BILL OF QUANTITY_x000D_MEP WORK_x000D_BOSPORUS RESTAURANT - KSA

Unit Amount
Item Description Qty Unit
Rate UAE Dhs
Carried To Collection SAR 0

529997276.xlsx MEP WORKS/20


BILL OF QUANTITY_x000D_MEP WORK_x000D_BOSPORUS RESTAURANT - KSA

Unit Amount
Item Description Qty Unit
Rate UAE Dhs

FIRE FIGHTING SYSTEM

Supply and Installation of Fire fighting works consisting of


pipes, fittings, including connection to existing system, related
civil works, painting and all necessary work to complete the
system

A Upright sprinkler heads for ceiling void area by Landlord/Civil


Defense Authority approved contractor Item LS

B Resssed type PENDANT sprinkler head as per approved


design by Landlord/ Civil Defense approved contractor no 0

C GI class "B" pipe and fittings for the complete network no 0

D 10 lbs. CO2 fire extinguisher no 0

E 10 dry chemical powder fire extinguisher no 0

F Wet chemical powder fire extinguisher no 0

G Fire Blanket no 0

H Supervisory valve closing & opening one time no 0

I Third party hydrotest report. no 0

J Testing and Commissioning including pressure testing,


shut down and connection with main line no 0

Carried To Collection SAR 0

529997276.xlsx MEP WORKS/21


BILL OF QUANTITY_x000D_MEP WORK_x000D_BOSPORUS RESTAURANT - KSA

Unit Amount
Item Description Qty Unit
Rate UAE Dhs

MECHANICAL AC SYSTEM

All works to be executed as per Landlord approved drawing


assuming that provided chilled water and power are
sufficient .

Supply and Installation of Mechanical ventilation works


consisting of equipment, Pre-Insulated ducts, grills, diffusers,
fittings, accessories, including connection to existing chilled
water stub out, related civil works and all necessary work to
complete the system

Ducted type AHU machine including installation. Control


panel Included
A XXX TR AHU, XX nos Unit 0
B XXX TR AHU,XX Nos Unit 0
C Chilled Water connection for the above units including
necessary welding fittings, pipe insulation. Items 0

D Ducting for the above AHU units in rigid ducts including


installation and necessary jointing and fixing accessories
Items 0

E Drainage conenction for the above AC machines including


necessary pipe insulation no 0

F Plenum boxes and VCD's for the above mentioned AC system


as per the AC Layout No 0

G 600x600 Square ceiling supply & return air grilles & diffusers,
No 0
powder coated as per approved paint finish.
H Supply and return powder coated Linear diffusers to be hanged
on ceiling Lm 0

I Control Panels for AHU No 0


J Valve Package for each AHU Unit 0
K Supply and installation of acoustic liner for each equipment
Unit 0 INCLUDED

L BTU Meter Item 0

M Supply and installation of PICV for 5 AHU, FAHU and HRU


Item LS

N Welding works for Main Chilled water pipe No 0


O Third party hydrotest report No 0
P Testing and Commissioning including air balancing, chilled
water pressure testing and flushing No 0

Carried To Collection SAR 0

529997276.xlsx MEP WORKS/22


BILL OF QUANTITY_x000D_MEP WORK_x000D_BOSPORUS RESTAURANT - KSA

Unit Amount
Item Description Qty Unit
Rate UAE Dhs

ELECTRICAL INSTALLATIONS GENERALLY


Electrical Panel Board
A Sub-Main DB dressing, glanding, installation and final
connection. Item 0
B Electrical Distribution Board (2 in GF and 1 in FF) no 0
C SPB Switch Panel Board no 0
D Supply and installation of Armoured Cable Item 0 INCLUDED
E Supply and installation Cable Tray Item 0 INCLUDED
F Supply and installation Trunking Item 0 INCLUDED

Lighting Outlet
G Light provision for spot light with fitting no 0
H Light provision for downlight with fitting no 0
I Light provision for pendant light excluding fitting no 0
J LED Strip Light Lm 0
K Linear LED light with acrylic & aluminum profile for Dummy
Column Lm 0

L 60*60 panel lights for Kitchen with Fittings no 0


M Outlet provision for signage. no 0
N Electrical outlet for Hoodlights. no 0
O Lighting points for emergency and exit lights. no 0
Sockets
P Socket 13A with fitting no 0
Q Double Socket 13A with fitting no 0
R Socket 15A, weatherproof with fitting no 0
S Socket 20A, Triphase with fitting no 0
T Socket 20A, weatherproof for kitchen with fitting no 0
U Power provision for CCTV no 0
V Isolating switch for Water Heater no 0
W Isolator for FCU, FAHU,ESP no 0
X Thermostat outlet with fitting no 0
Y Special power outlet for insect for insect killer, FACP, Gas
alarm panel etc… no 0

Z Supply and installation of cabling for the above power points


Item INCLUDED

AA Supply and installation of PVC containment Item INCLUDED


AB Cable pulling for the above works Item INCLUDED
AC Testing and Commissioning including live and cold test.
no 0

AD Supply and installation of Decorative Pendant Lighting


Nos

SAR
529997276.xlsx MEP WORKS/23
BILL OF QUANTITY_x000D_MEP WORK_x000D_BOSPORUS RESTAURANT - KSA

Unit Amount
Item Description Qty Unit
Rate UAE Dhs
Carried To Collection SAR 0

529997276.xlsx MEP WORKS/24


BILL OF QUANTITY_x000D_MEP WORK_x000D_BOSPORUS RESTAURANT - KSA

Unit Amount
Item Description Qty Unit
Rate UAE Dhs

FIRE DETECTION AND ALARM SYSTEM

Supply and installation of smoke detectors complete with


necessary wiring, conduit and termination and must comply
with the existing fire alarm system

A Four zones fire alarm control panel item 0


B Smoke detector item 0
C Heat detector item 0
D Break glass unit item 0
F Fire Sounder item 0

Dual interfacing modules for Kitchen Hood, Gas Panel, ZCV,


E item 0
FACP

G Control Relay Module AC, Music System, Gas Panel item 0

H Emergency light non-maintained surface type item 0


I Exit light maintained item 0
J DCD 24/7 application and interfacing. item 0
K DCD application for lay-out and installation approval. item 0
L
FP200 cables and accessories, including coordination fees item 0

M Testing and Commissioning including programming of


new devices item 0

N Reprograming of base build FACP panel item 0

SUNDRIES GENRALLY

N Provide all necessary builders work INCLUDED

O Provide and handover a complete set of spare parts for one


year period INCLUDED

P Provide shop drawings and as-built drawings INCLUDED

Q Provide operation and maintenance manuals INCLUDED

Carried To Collection SAR 0

529997276.xlsx MEP WORKS/25


BILL OF QUANTITY_x000D_MEP WORK_x000D_BOSPORUS RESTAURANT - KSA

Unit Amount
Item Description Qty Unit
Rate
SAR UAE Dhs

529997276.xlsx MEP WORKS/26


BILL OF QUANTITY_x000D_MEP WORK_x000D_BOSPORUS RESTAURANT - KSA

Unit Amount
Item Description Qty Unit
Rate UAE Dhs

GAS NETWORK

Gas network with supply points as assumed from the provided


kitchen equipment layout
A Supply and Instalaltion of 1-1/2" CS Sch 40 pipe with required
Item
fittings & supports
B Supply and Instalaltion of 3" ERW sleeve pipe with required
fittings & supports Item
C Supply and Instalaltion of 1-1/2" isolation valves Nos.
D Supply and Instalaltion of 1-1/2" isolation valves for gas
Nos.
points
E Pressure testing of new pipeline with nitrogen Item
Supply and installation of Tocsin 640 gas control panel
F Nos.
L.S.
Supply and installation of Tocsin31A weather proof gas
G detector Nos.

H Supply and installation of emergency shut off switch Nos.


I Supply and installation of 24 VDC Sounder Flusher
Ls

J 04 core and 02 core x 1.5sqmm firetek cable with 25mm GI


conduit with fittings Ls
K Testing & Commissioning of gas detection system Ls
L Civil Defense approval for new LPG system installed Ls

Carried To Collection SAR 0

529997276.xlsx MEP WORKS/27


BILL OF QUANTITY_x000D_MEP WORK_x000D_BOSPORUS RESTAURANT - KSA

Unit Amount
Item Description Qty Unit
Rate UAE Dhs

COLLECTION PAGE

PLUMBING 1 0

FIRE FIGHTING SYSTEM WORKS 2 0

HVAC WORKS 3 0

ELECTRICAL WORKS 4 0

FIRE ALARM SYSTEM WORKS 5 0

GAS WORKS 6 0

Carried To Main Summary UAE Dhs 0

529997276.xlsx MEP WORKS/28


BILL OF QUANTITY_x000D_MECHANICAL SPECIALITY_x000D_BOSPORUS RESTAURANT - KSA

Unit Amount
Item Description Qty Unit
Rate UAE Dhs

KITCHEN VENTILATION SYSTEM WITH HOODS

All works and specification are as per Landlord calculations


specs, air management technique and specification of
equipments. Works are executed as per approved drawings.
Prices are based on suppliers quote and includes OHP,
installation and coordination charges

Supply & Installation HALTON Normal Hood Size XXX


A Normal Cooking Hood. Set
Model: KVF
LS
Supply & Installation HALTON Water Mist Hood XXX
B Barbecue & Shawarma Set
Model: CMW-MUAP-CJ

EXTRACTION FAN
Supply & Instalaltion of make centrifugial Kitchen
D extract Fan Set 0

Supply and installation Variable Frequency Detection (VFD)


E Panel for controlling the fan speed Item 0

ESP FILTRATION SYSTEM

Kitchen Area
Supply & Installation ESP 72 (6956 CFM) (MADE IN
F UK) - Brand: Purified Air Item

G Supply & Installation Ecology Controller XX KW Item Ls


Supply & Installation Carbon Filtration System 6 stage -
H 6.0 Item

Carried To Collection SAR 0

529997276.xlsx MECHANICAL SPECIALTY/29


BILL OF QUANTITY_x000D_MECHANICAL SPECIALITY_x000D_BOSPORUS RESTAURANT - KSA

Unit Amount
Item Description Qty Unit
Rate UAE Dhs

FIRE SUPPRESSION SYSTEM FOR HOOD

Wet chemical fire suppression system. Low PH wet chemical


fire suppression system to relevant NFPA codes, UL 300
standards and KSA civil defense requirements.

A For Kitchen hood (capacity to be specified)


B XX Gallon Tank System Upper floor Item
LS
C XX Gallon Tank System Lower floor Item

Testing and Commissioning including certification


D Item 0

KITCHEN VENTILATION (KITCHEN


MECHANICAL SPECIALITIES IN A SEPARATE
QUOTE)

FAHU machine as approved by Mall Managemen, with


centrifugal belt driven fan, bag filter and aluminum filter,
E INCLUDING INSTALLATION AND CONTROL PANEL Item

0
Supply and installation of Fresh Air Handling Unit with
F Heat Recovery Wheel for energy recovery frim exhaust air. Item
XX CFM

G CHW Piping including valve packages Item 0

BLACK STEEL 2 MM ducting for kitchen extract system


H Item 0
(Fire Rated, if required)

Supply and installation of Fresh air ducting for hood


I including plenum boxes and connection with FAHU and Item 0
hoods

Flow switch for FAHU, Interfacing of FAHU,Exhaust


J fan,ESP,UVC,Water mist hood system. Item 0

K Flushing, Air and chilled water balancing. Item 0

L Control panel for FAHU Item 0

M Testing and commissioning. 1 Item 0

Carried To Collection SAR 0

529997276.xlsx MECHANICAL SPECIALTY/30


BILL OF QUANTITY_x000D_MECHANICAL SPECIALITY_x000D_BOSPORUS RESTAURANT - KSA

Unit Amount
Item Description Qty Unit
Rate UAE Dhs

COMMUNICATION SYSTEMS GENERALLY

Supply and installation of Telephone and Data outlet,


complete with approved wiring and conduit, excluding
A Item 0
termination.

IT Rack, patch panel, servers, patching and termination


including all necessary termination for all required IT
B Item 0
systems

SECURITY SYSTEMS GENERALLY

Supply and installation of CCTV camera, complete with


approved wiring and conduit, terminating and complying
C with existing security system in the building
Item 0

D Testing and Commissioning

Carried To Collection SAR 0

529997276.xlsx MECHANICAL SPECIALTY/31


BILL OF QUANTITY_x000D_MECHANICAL SPECIALITY_x000D_BOSPORUS RESTAURANT - KSA

Unit Amount
Item Description Qty Unit
Rate UAE Dhs

COLLECTION

HOOD, ESP 0

FIRE SUPPRESSION. FAHU 0

COMMUNICATION SYSTEM 0

Carried To Main Summary SAR 0

529997276.xlsx MECHANICAL SPECIALTY/32


180915 BOQ Bosporus KSA-Awan Gallery

BOSPORUS RESTURANT

KSA- DAMAM
AWAN Gallery

GENERAL SUMMARY OF FIT-OUT WORKS

Amount
MAIN SUMMARY Page No.
SAR

GENERAL REQUIREMENTS FOR THE WHOLE OF GENERAL


I- REQUIREMENTS/4
0
THE WORKS

CIVIL &
II- DECORATION WORKS DECORATION/14
0

III- M.E.P. WORKS MEP WORKS/4 0

MECHANICAL
IV- MECHANICAL WORKS SPECIALTY/4
0

LIFT
V 1No - Service Lift LUMPSUM
1No - Passenger Panoramic Lift

TOTAL SAR 0

Notes :
1 All Wooden works to be firerated as per KSA Civil defense law and regulation.
2 All Glazed works to be timber double glazed fire rated.
3 All Samples to be submited for Client Approval.

4 MEP is only a draft sample proposal, proper calculations and details to be done as per kitchen equipment
MEP and site conditions.
5 Steel Structure works and calculations to be done by Structure specialist.
6 Fire Fighting and fire suppression
7 BOQ to be finialized as per actual site dimensions.