Sub: TR&B Dept-Railways-Assistance for DPR Preparation works for Chennai-

Mysore High Speed Rail corridor-Reg

Ref: From the Director/System, NHSRCL, letter No.NHSRCL-


CO/CM/CA/01/NHSR-CM/637/1/OHQ 2860, dt.12.03.2021

****
Please see the letter received from the Director/System, NHSRCL at
pages 1-2 cf

2) Submitted that Director/System, NHSRCL has stated that National High


Speed Rail Corporation Limited (NHSRCL) has been entrusted with the work of
DPR preparation for HSR corridor of Chennai-Bangalore-Mysore (CMHSR). The
total project length is 435 km of CMHSR, out of this approx.. 89 km falls in the
state of AP. He has further stated that it is proposed to traverse through one
district i.e., Chittoor. The CMHSR corridor planned is a high priority project and
monitored at highest level.

3) To start with the project implementation, NHSRCL has awarded the work to
Contrators/Consultants for conducting technical surveys, environment impact
assessment, social impact assessment and data collector related to revenue
maps/records etc. and teams of contractors/consultants are already mobilized on
ground.

4) In view of the above, the Director/System, NHSRCL has requested to


issue necessary directions from your good offices to the concern District
Magistrate/District Collectors to render necessary assistance to NHSRCL and
their representatives to complete the project work. In addition, nomination of a
coordinating officer at district level by the respective DCs would by highly
appreciated.

5) In view of the above, as per marginal orders of Prl.Secy, a draft D.O


Letter addressed to the Collector & District Magistrate, Chittoor is submitted for
approval.
D.O. Lr. No. TRB01-RDBS0RSCH/107/2021-ROADS-II, Dt.

Dear

Sub:- TR&B Dept-Railways-Assistance for DPR Preparation works for Chennai-


Mysore High Speed Rail corridor-Reg

Ref:- From the Director/System, NHSRCL, letter No.NHSRCL-


CO/CM/CA/01/NHSR-CM/637/1/OHQ 2860, dt.12.03.2021

***
Please find herewith enclosed a copy of the reference cited.

2. I am to inform that the National High Speed Rail Corporation Limited


(NHSRCL) has been entrusted with the work of DPR preparation for HSR corridor
of Chennai-Bangalore-Mysore (CMHSR). The total project length is 435 km of
CMHSR, out of this approximately 89 km falls in the state of AP. It is proposed
to traverse through one district i.e., Chittoor. The CMHSR corridor planned is a
high priority project and monitored at highest level. To start with the project
implementation, NHSRCL has awarded the work to Contrators/Consultants for
conducting technical surveys, environment impact assessment, social impact
assessment and data collector related to revenue maps/records etc. and teams
of contractors/consultants are already mobilized on ground.

3. I therefore request you to assist to NHSRCL and their representatives


for DPR preparation works for Chennai- Mysore High Speed Rail corridor and
nominate a coordinating officer at District level to complete the project work. as
soon as possible.

with

Yours sincerely,

To
Sri Hari Narayanan.M, IAS.,
Collector & District Magistrate,
Chittoor Dist., Chittoor (w.e).
D.O. Lr. No.RDBS0RSCH/107/2021-ROADS-II, Dt. 20.04.2021.

Dear

Sub:- TR&B Dept. - Railways - Assistance for DPR Preparation works for
Chennai-Mysore High Speed Rail corridor - Reg.

Ref:- From the Director/System, NHSRCL, New Delhi letter No.NHSRCL-


CO/CM/CA/01/NHSR-CM/637/1/OHQ 2860, dated 12.03.2021.

****
Please find herewith a copy of the reference cited.

2) I am to inform that the National High Speed Rail Corporation Limited


(NHSRCL) has been entrusted with the work of DPR preparation for HSR corridor
of Chennai-Bangalore-Mysore (CMHSR). The total project length is 435 km of
CMHSR, out of this approximately 89 km falls in the State of Andhra Pradesh. It
is proposed to traverse through one district i.e., Chittoor. The CMHSR corridor
planned is a high priority project and monitored at highest level. To start with
the project implementation, NHSRCL has awarded the work to contractors/
Consultants for conducting technical surveys, environment impact assessment,
social impact assessment and data collector related to revenue maps/records
etc. and teams of contractors/ consultants are already mobilized on ground.

3) I therefore request you to assist to NHSRCL and their representatives for


DPR preparation works for Chennai - Mysore High Speed Rail corridor and
nominate a coordinating officer at District level, so as to complete the project
work.

With

Yours sincerely,

(M.T.KRISHNA BABU)

To
Sri M. Hari Narayanan, IAS.,
Collector & District Magistrate,
Chittoor (w.e).