Curriculum Vitae: Mobile: 09623002143 & 07020818149

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 5

SASMITA MALLICK Objective:

 To be a Professional as per Knowledge & Ability, to work in a challeng


Contact Information environment where Professional growth is possible as well as to contrib
to the growth & development of the organization.
Mobile: 09623002143 &
07020818149
Academic Qualification:

 Pursuing B. TECH 4th year in Electronics & Communication Engineer


from BPUT University, Odisha.
EMAIL Id :-  1st Class with 64% Marks in Diploma Electronics & Telecommunicatio
[email protected]
2008. From WOMENS POLYTECHNIC Bhubaneswar under S.C.T & V
Odisha Board.
Present Address
C/o: Parag Pandhari  1st Class with 68% Marks in H.S.C Board of Secondary Education in 2
Chandankhede From G.S.T.S. High school, Berhampur, Dist-Ganjam (Odisha).
AT/PO: BLD-C1,Sarathi
Sinclair Homes,Flat Add. Qualification:
No.401,Sr.No.35/2,near
Ganpati matha,Warje Malwadi  Completed SAP MM Module from Global InfoTech enterprise solut
Pune 411052
pune.

Permanent Address Work Experience:

D/O:Basanta kumar mallick  Currently working as a Junior Shop Manager –Instrumentation w


AT:P & T Colony CUMMINS TECHNOLOGIES INDIA PVT LTD, Pune in R &
Block No:11,QR No:86 (Engine Testing & Lab operations) Department Since 20th March 2017
Berhampur till date.
Dist: Ganjam  I have joined I DESIGN ENGG. SOLUTION LTD in R & D Departm
Pin No: 760010 on 15th of Sept.2014 to 14th of March.2017 as an Instrumenta
State:Odisha Engineer. I-DESIGN is the R&D wing of RSB group.
. (0680) 2290110  I have joined JOHNDEERE INDIA PVT LTD in R & D Department
9th of JULY 2012 as an Instrumentation Engineer to 31st MARCH 2014.
 I have joined BEHR INDIA in Production Département on 24th of F
Personal Data: 2010 as an operating engineer, in AC HVAC ASSLY AND TESTI
LINE in Production Department.
Sex : Female
 Total Experience: 24th Feb 2010 to 24th Dec 2011 in Behr India.
Nationality : Indian
Marital Status : Single  10 months experience as a faculty of Electronics at Apex +2 Scie
Languages : College & Lab assistant post of Electronics’ lab at Apex institute
Known English Technology & management.
Hindi, Odiya
Achievement:
 Awarded 1st Prize in district level school science examination.
 Winner of the best Growth file award for the month of February & April
2011.
 Development and implementation on the skill development& evaluation
methodology for operating engineer.
 Reduction of internal defects level from 2% TO 0.06% PPM by forming
guiding the team using 7QC tools, why why analysis.
 Participate in kaizen workshops to reduce the setup change cycle time fr
60mins to 15 mins.
 Reduction in rejection through the 7QC tools problem solving technique
 Increase the productivity by applying the MTM study & line balancing.
 Reduced the defects by providing POKA YOKE.

Curriculum Vitae
Current Job Profile:

 Test cell calibration activities in Asset /Cyflex and PUMA test cells.
 Implemented and maintained the calibration program for the
Instrumentation, including scheduling and performing all in-house
calibrations, equipment / instrument repair & troubleshooting.
 Calibrated physical, mechanical, and electronic test equipment within
extremely close tolerances in temperature controlled environments.
 Resolve Engine & Software related Troubleshooting.
 Experience of onsite Calibration Of transducers like Pressure,
Temperature, Dynamometer, AVL Fuel System (735s & 734s), Humidity
meter, LC scale, Smoke meter etc. using master calibrator like Wika,
Druck calibrator & Temperature bath. Connect with external calibration
agency for Air flowmeter & water flowmeter calibration. Also for Master
equipment’s calibration from NABL accreditation organization or OEM.
 Accurately collected, complied, measured, recorded and summarized data
during calibration processes, identified out of tolerance conditions and
performed corrective actions via adjustments or component replacement.
 Performed uncertainty evaluation and analysis for measurement standards
and associated measurement processes.
 Evaluated and made recommendations regarding new calibration standards,
methods, processes, practices and procedures.
 Also doing push tube, PCB & Injector link calibration using AVL indicom.
 Preventive maintenance of AVL fuel conditioning unit & Coolant
conditioning unit.
 Observe and understand the process of Test cycles in test cells. Understand
the test plans, accordingly we can provide the calibrated equipment’s.
 Working with device communication software’s, this is called CUTY-
Calterm. Resolve troubleshooting’s related CUTY-Calterm software or
hardware site of PUMA and Cyflex test cells. Also provided support
external agencies related CUTY-Calterm issues. This is the Cummins own
developed software using for Engine calibration purposes.
 Also working with ECM & High-speed data acquisition in test cells.
 100% Calibration of all measuring & Master equipment’s.
 Calibration execution for COP test cells, For Stage V & EPA certification.
Also, leading for certification test cell Engine certification.
 Very good practical understanding of engine-test cell instrumentation, data
acquisition tools and regulatory emissions.
 Responsible for in- house & Onsite Calibration of test cell all measuring
instruments.
 Performing in-house calibration of Emission AVL SPC 472 controller &
Filter panel pressure transducers & Temperature sensors calibration using
Wika pressure calibrator & Fluke Temp.bath as per ISO 17025, NABL
documents.
 Performing PID tuning of valves using AVL PUMA software.
DOCUMENTATION:
 Maintaining the All measuring equipment’s with master calibrator
calibration track sheets.
 Doing all procurement, Quality management system & ISO standards
documentations.
 Doing Logistic works using Cummins applications(Oracle) for sending
equipment’s calibration purposes.
 Preparing Calibration certificates for inhouse calibration equipment’s.
 Develop the procedures for the calibration & testing activities in reference
with international standards & NABL documents.
 Preparation of internal audit plans & Certification plan & perform it with
the proper documentation.
 Preparing SOP’s for in-house calibration procedure of all measuring
equipment’s as per quality management system or database.
 Maintaining Quality measures of calibration Lab as KPI’s, CAPA etc.

Training Attended:

 Achieved Certified Internal Auditor certificate for successfully completing


the Quality management system internal auditor Training ISO 9001:2015.
 On job training of hands on experience of AVL PUMA software &
parameter configuration, PID tuning, data analysis & new channel
configuration etc.
 In house training on Emission devices of AVL Smart sampler, FTIR,
Opacity meter, CVS & basics of After-treatment technology.
 NABL training.
 FTA and 7 step problems solving.
 Data quality, boundary condition & online data review basics & Test
Engineering standards awareness.
 Engine performance fundamentals & Dynamometer awareness.
 KAIZEN, SWM & Visual management awareness.

Previous Job Profile:

 Design & Integration of Electronic control system for test rigs & handled
many clients based project.
 Programming on various brands of PLCs. (Allen Bradley, RS Logixs 5000
etc.) & Also Programming on NI Lab VIEW for latest versions 8.6 , 2012,
2013, report generation toolkit, PID toolkit, Application building.
 Data acquisition hardware includes NI compact field point, compact RIO,
PCI 6221, and USB 9215 from National Instruments.
 Field test & data acquisition using SOMAT edaq Lite & Worked with ABB
VFDS.
Project Work:

1. Plasma melting furnace-Duration 4 month.


2. Electron Beam Melting Furnace-Duration 1 year.
Company: Nuclear Fuel Complex, Hyderabad (NFC)
My Roll: Project leader: management & technical coordination for electrical
and Instrumentation.
Project Summary:

 Melting of metals in a vacuum furnace (1×10-5 mbar) by two electron gun


(150KW each) with vacuum level of (1×10-7 mbar).
 Molten ingot is prepared in a rotating, water cooled retraction unit.
The whole system has two transformers of 40KV DC output, two High
Voltage control panels and one Vacuum control panel.
Process is controlled in Maintenance or Semi-auto or Fully Auto mode
through PLC & SCADA/HMI.
3. Robotics Welding (Manipulator) -Duration 1 month.

Previous Job Responsibilities:

 Handle all Documentations Part of Instrumentation & data Acquisition


Dept.
 Lab Data Acquisition Using SOMAT CLASSIC, SOMAT eDAQ LITE,
HBM signal Cond., GRANT DATA LOGGER.
 Noise and Vibration Measurement using LMS SCADA RECODER,
IMC, WAVE ANALYSES.
 Tractor Reaction: PROTABLE AXEL WEIGHING SYSTEM.
 Maintaining Calibrated Instruments.
 In house Customized sensor, Strain Gauging & Calibration.
 Sensors to measure FORCE, DISPLACEMENT, FLOW,
TEMPRETURE, ACCELERATION, NOISE, PRESSURE, ANGLE &
Torque.
 Instruments’ Handling or Mounting. Connections to Indicator or Data
logger.
 Lab Documentations like Raising Purchase requisition, Preparing Indent,
Raising Purchase order, GRN entry, Instruments Machining hour sheet
record etc, through SAP software.
 Knowledge of Track Testing (CTT, Mud track, Gradient track) and Engine
& PTO Testing.
 Strain Gauging and making transducer for testing purpose.
Project Work:

 STICKMAN( CAB) ( 1 Month )


 W70 HARVESTOR ( 3 Month )
 AIR CIRCULATION (1 Month )
 CTT VIBRATION ( 1 Month )
 TPL FORCE MEASUREMENT ( 2 Month )
 YANMAR ENGINE START TEST ( 1 Month )
 CHASSIS TORSION & CLUTCH POP TEST
Previous Job Profile:
Works in Behr India Ltd, Chakan as an Operating Engineer in production
assembly line.
Job Responsibility:
 Working as a 5’S member, Suggestion review committee member.
 BEMIS Board Up-dation Responsibilities.
 Participation in new product developments.
 Look after the daily production problems & updating the daily production
& materials.
 Implementing quality practices on the machine floor.
 Reduce internal defects &Scrap rate.
 Set up time and Cycle time reduction.
 Rejection and Rework control through the Projects.
Project Done:
 Productivity improvements (MTM VALIDATION)
 5’S implementation throughout the plant.
 BEMIS LAUNCH AND IMPLIMENTATION.
 KAIZEN programs on air conditioner group lines to improve productivity
& Lay out change.
 5’S for exiting tools.
Training Attended:

 Awareness on TS-16949 (Basic), ISO-14001, TPM.


 7QC Tools.
 V MAP Level 01, 02 and 03, Kaizen.
 Kanban, 5’S & POKA YOKA.
 Training on APS, BPS, and Q-STOP & BEMIS.
 SAFETY Training.
Computer Knowledge:

 Multimedia &Graphic Designer (Photoshop, Corel Draw, Web Designing,


Java, Html, Page Maker, etc.)
 Efficiently Handle the Internet.
 MS OFFICE & AutoCAD.

Self-Strengths:
 Good Communication Skills & Ability to deal with people diplomatically.
 Meticulous, Punctual, Honest.
 Willing is facing any challenges.
 Believing in continuous self-development.
 Good listener & quick learner.
 Potential to work independent & also coordinate with team members to
attain the goal.
 Managing time efficiently & effectively through scheduling & prioritizing
the works.

Hobbies:
 Making new friends, Painting, Watching TV.
 Listening to music, playing Badminton and Internet surfing.

Declaration:

I, Sasmita Mallick, do hereby confirm that the information given en above


is true to the best of my knowledge and belief. If I am given a chance to join your
Organization, I promise you that I will use my expertise and contribute to the best
of my ability.

Place: PUNE
Date : Sasmita Mallick

You might also like