Internal Test Report: Tests Conducted
Internal Test Report: Tests Conducted
Internal Test Report: Tests Conducted
Page 1 of 2
W.O. No. : C-2899 T.R. No : BD/QC/C-2899/2021
Date : 18.06.2021
Material Equipment Tested : 22 Kv. 17967A. IPB - MAIN RUN / 22kV. 935A. IPB – TAP-OFF RUN
Tests Conducted : (01) One Minute Dry Power Frequency Voltage Test Withstand At 60 kV (rms).
: (02) Insulation Resistance Measurement Test.
Test Results : (01) All elements Withstood at 60 kV. (rms) for one minute between phase and earth.
: (02) I.R value measured with 5000 V meggar before & after HV test, The value
found more than 250 G ohms.
QAFQC : 07
REV-00
INTERNAL INSPECTION REPORT
Page 2 of 2
Ref. : BD / QC / C-2899 / IPBD / IR 01 Date of Inspection : 18.06.2021
V PHASE
2.10 IPM8V 100% 3695+685 3695+685 A
W PHASE
2.19 IPM8W 100% 3695+685 3695+685 A
3.2 Paint Adhesion Test & Surface finish Random No peel off Found OK A