The document provides step-by-step instructions for migrating personnel data from a legacy system into an SAP R/3 system using the Legacy System Migration Workbench (LSMW). It explains the 14 basic steps in LSMW, including [1] creating a project, subproject and object, [2] recording the transaction to migrate, [3] configuring and executing the basic steps like mapping fields and specifying the legacy data file. The instructions are illustrated with an example of uploading an employee's personnel infotype 0002.

Uploaded by

Srinivas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views13 pages

LSMW

The document provides step-by-step instructions for migrating personnel data from a legacy system into an SAP R/3 system using the Legacy System Migration Workbench (LSMW). It explains the 14 basic steps in LSMW, including [1] creating a project, subproject and object, [2] recording the transaction to migrate, [3] configuring and executing the basic steps like mapping fields and specifying the legacy data file. The instructions are illustrated with an example of uploading an employee's personnel infotype 0002.

Uploaded by

Srinivas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 13

Introduction

The Legacy System Migration Workbench (LSMW) is a instrument to transmit data from
legacy systems into an R/3 System. LSMW supports a step-by-step process; if one step
is executed and saved then next step automatically follows. Apart from formation of
project/ subproject/ object and recording, there are 14 basic steps included in LSMW.
This article explains clearly about each and every step.

Example, I am showing how to upload Personnel Data for an employee i.e. Infotype
0002 .

Creating Project/ Subproject and Object:

Go to LSMW

Give the name of the Project, Subproject and Object as desired

Recording:

In menu bar, Goto—->Recordings


Now, Select ‘Recordings’ and create —->Give recording name and description

Go to Transaction ‘PA30’

In Master data maintain screen, give Personnel No, infotype and subtype (if any), and
click on create
Select The fields in whioch you want to input the data.

Save the Entry . The following screen will appear.


Now, click on Default All and save and press back

We are clicking ‘Default all’ button, so that all the fields which we touched during
recording are included
Save and back to main Screen.

Processing basic steps in LSMW:

LSMW need to be configured 14 basic steps. Below you will find detailed step-by step
procedure.

Click On execute
Step 1: Maintain Object Attributes

Select this radio button and click on execute

Now, click on Display/ Change icon Here, we are telling system that what kind recording should take into
consideration while performing upload.

Select ‘Batch Input Recording’ and give name as shown below (Recording Name)
Save and Back.

Step 2: Maintain Source Structures

Source structures are helpful in building hierarchical relationships. While uploading the data system always
checks highest level structure first before going for subordinate structure.

Select source structure and create


First click on Change button and then click on create button.

Save and Back.

Step 3: Maintain Source Fields

Here we assign all the fields which need to upload to source structure.

Click on Object Overview—->select table


Click on Object Overview—->select table

Click on change and then select the source field and then Table.

Copy the fields and length in excel sheet (for temporary)

Note: exclude TABNAME and TCODE which are not required to maintain separately,
system will take these from recording we made.
Save and back.

Step 4: Maintain Structure Relations

Here we check whether structure relations between legacy and R/3 established or not.

In this step there is no need to change, just save and come back.
Save and Back.

Step 5: Display Field Mapping and Conversion

Here we establish the relationship between legacy and R/3 based on object fields.

In menu bar, go to ExtrasàAuto Field Mapping

After Execute go to Extra and then Auto Field Mapping.


Now accept proposal for all the fields which need to upload

Step 6: Maintain Fixed Values, Translations, User-Defined Routines

No need to maintain this step, unless and until if there exist any user defined routines, which helpful for
reusable.

Step 7: Specify Files

In this step, you specify the location of the legacy file.

Note: Generally we receive legacy file in excel format, so save this file as Text

Now, double click on ‘Legacy Data – On the PC (Front End)