GOVERNMENT OF INDIA
रे ल म ं त्र ालय
MINISTRY OF RAILWAYS
Indian Railways
Unified Standard Schedule Of Rates
(Formation Works, Bridge Works and P.Way Works)
दर अन ु स ू च ी
Schedule Of Rates
इज
ं ीननर्र ं ग नवभाग
Engineering Department
2019
General and Operating Instructions
1. General Instructions:
1.1. These instructions & guidelines are applicable for all items included in all Chapters
for Railway Formation Works, Bridge Works and P. Way Works.
1.2. The IRUSSOR-2019 has been prepared, duly incorporating the representative rates
of different components required to confirm consistency in ‘Analysis of Rates
(AOR)’.
1.3. Cost of cement is not included in any item except where specifically mentioned in
the item.
1.4. Cost of carriage of materials up to the site of work is included in the input cost of
basic items.
1.5. In Rate Analysis, misc. expenditure has been taken care of under the heading
‘Sundries’ (indicated by Item Code 9901 in the Basic Rates Sheet). Rate for
‘Sundries’ has been taken as 1.00 and will remain constant for all Zonal
Railways. This shall be increased @ 5% per annum, i.e. rate after one year shall
be changed from 1.00 to 1.05.
1.6. Design Mix Cement Concrete of all grades from M-15 to M-40 will be paid at
same rate irrespective of grade mentioned in the item. Grade mentioned is for
guidance purpose. However, grade of RCC to be used at site shall be mentioned
in the BOQ.
1.7. Automatic digital weigh Batching, mixing and placing, preferably mobile RMC
plant shall be used for design mix concrete. Concrete mixer shall be used for
small quantity for nominal mix only with the permission of Engineer-in charge.
Placement of concrete shall be done by concrete pump in general.
1.8. Cost of Admixture (plasticiser / super-plasticiser) is included in the item of design
mix concrete.
1.9. Payment for cement shall be made extra wherever mentioned in the item for the
quantity as per approved design mix subjected to minimum and maximum limit
as prescribed in IS 456 and for nominal mix and other misc. items, it shall be as
per standard consumption enclosed separately with this USSOR.
1.10. Cost of shuttering, wherever required, shall be paid separately and is not included
in the rate of item except where specifically mentioned otherwise. Shuttering
shall be paid only for the shuttering area coming in contact with the concrete
surface.
1.11. Rates include all freight charges, lead and lift upto the site of the work for all
materials used in the work unless specified otherwise.
2. Operating Instructions
1 Earth Work
2 Bridge Works Substructure
3 Bridge Works Super structure
4 Bridge Works Super structure- Steel
5 Bridge Works- Misc.
6 Rails, Sleepers, Fittings and Renewals
7 Turnouts and Renewals
8 Manual/Mechanised Screening and Ballast Related Activities
9 Welding Activities
10 Reconditioning of Points & Crossings
11 Formation & Rehabilitation
12 Activities at Construction Sites
13 Maintenance Activities
14 Testing of Rails & Other Components
15 Heavy Track Machines
16 Small Track Machines
17 Handling of Materials
18 Level Crossings
19 Bridge Related Activities
20 Supply Items
21 Miscellaneous Items
IR's Unified Standard Schedule of Rates 2019
011011 In all conditions and classifications of soil except rock Cum 137.57
011012 Soft rock not requiring blasting in all conditions Cum 308.07
011013 In hard rock requiring blasting with explosives and blasting/drilling Cum 488.48
equipment Including all incidental work in all conditions. Rate includes
cost of all explosive material.
011014 In rock and very hard rock with hammer / chisel / pavement breaker etc. Cum 1069.01
where blasting is not permitted due to special circumstances and if
specifically ordered in writing including drilling and all incidental work in
all conditions
011015 In any other type of soil not covered above where classification is not Cum 137.57
possible
011016 Extra for leading of Cut spoil every one km beyond original lead of 2 km Cum 6.24
over item no. 011010
012010 Earthwork in filling in embankment , guide bunds, around buried type Cum 275.11
abutments, bridge gaps, trolley refuges, rain bunds, if provided,
platforms etc. with earth, suitable for embankment as per RDSO latest
Specifications and guidelines GE: G-14 of Soil Quality Class SQ1,
excavated from outside railway boundary entirely arranged by the
contractor at his own cost including all leads, lifts, ascents, descents,
crossing of nallahs or any other obstructions. The item shall include
demarcation and setting out of profile, site clearance, removing of
shrubs, roots of vegetations growth, heavy grass, benching of existing
slope of old bank, all handling/re-handling, spreading in layers with
motor grader, bringing the moisture content to OMC, mechanical
compaction to specified density and dressing of bank to final profile as
a complete job. The payment shall be made as per finished profile and
the rate shall include all costs including taxes, octroi, royalty etc. except
for mechanical compaction which shall be paid extra under relevant
item. Cut trees shall be property of railways and to be deposited in the
railway godown unless specified otherwise in the Special Conditions of
Contract.
Page 1 of 106
IR's Unified Standard Schedule of Rates 2019
012030 Earthwork in filling in embankment, guide bunds, around buried type Cum 310.84
abutments, bridge gaps, trolley refuges, rain bunds, if provided,
platforms etc. with earth, suitable for embankment as per RDSO latest
Specifications and guidelines GE: G-14 of Soil Quality Class SQ3,
excavated from outside railway boundary entirely arranged by the
contractor at his own cost including all leads, lifts, ascents, descents,
crossing of nallahs or any other obstructions. The item shall include
demarcation and setting out of profile, site clearance, removing of
shrubs, roots of vegetations growth, heavy grass, benching of existing
slope of old bank, all handling/re-handling, spreading in layers with
motor grader, bringing the moisture content to OMC, mechanical
compaction to specified density and dressing of bank to final profile as
a complete job. The payment shall be made as per finished profile and
the rate shall include all costs including taxes, octroi, royalty etc. except
for mechanical compaction which shall be paid extra under relevant
item. Cut trees shall be property of railways and to be deposited in the
railway godown unless specified otherwise in the Special Conditions of
Contract.
Note: Payment under this item shall be made only upto the thickness
as approved by Engineer-in-Charge. Any additional thickness
executed shall be paid under the item of Earthwork in filling in
embankment for Soil Quality Class SQ1.
012040 Extra for mechanical compaction of soil in embankment with Cum 18.12
contractor’s rollers of suitable capacity, type and size to achieve
specified density as per specification, testing as per IS codes including
cost of water, T&P, consumable and all labour as a complete job. The
work is to be executed as per Latest edition of "Guidelines for
Earthwork in Railway Projects" issued by RDSO, Lucknow.
Page 2 of 106
IR's Unified Standard Schedule of Rates 2019
013050 Turfing / planting, including all lead & lift and watering as required until
properly rooted with. Note - Initially payment of only 40% will be made.
Balance 60% will be paid only after 3 months of maintenance period, if
the turfing is properly rooted.
Page 3 of 106
IR's Unified Standard Schedule of Rates 2019
013101 With provision of one 50mm wide retro-reflective tape in horizontal Metre 205.31
direction, duly secured/tight with vertical posts
013102 With provision of painting verticals & horizontals with red luminous Metre 96.51
paints / strips of 30cm each with a gap of 30 cm
013110 Supplying, driving and erecting in all types of soils hard wood pile 5m to Metre 185.22
7m long without joint, 125mm average dia. for protection of bank slope
including two coats of coal tar paint complete, as directed
{Note - Payment will be made as per actual driven length of pile}
013120 Driving rails 90R/52 Kg section below average ground level within the Metre 98.74
slope/toe of embankment including making of nose with contractor’s
own arrangement complete in all respect
{Note - Payment will be made as per actual driven length of rail which
will be supplied free by Railways at site of work}
013130 Driving 'Z' section MS sheet piles side by side in all kinds of soil Sqm 809.91
mechanically or manually as per approved drawing with contractor’s
own arrangement complete in all respects and removal of sheet piles
after completion of the work as directed by engineer in-charge
{Note - Payment will be made as per actual driven length of pile}
013140 Supplying and fixing bitumen drum sheet by nailing to wooden piles 125 Sqm 399.91
mm dia., supplied and driven by contractor complete with nails/hooks to
prevent earth against slippage, as per approved drawing & as directed.
Page 4 of 106
IR's Unified Standard Schedule of Rates 2019
014011 On top of subgrade or prepared subgrade before laying blanketing layer Sqm 151.25
with minimum strengths in Grab test, Trapezoidal Tear test and
Puncture test of 700N, 250 N and 1800 N respectively.
014012 Below the ballast and above blanket layer with minimum strengths in Sqm 268.99
Grab test, Trapezoidal Tear test and Puncture test of 1750N, 800 N
and 5800 N respectively.
014020 Supplying & laying of drainage composite for use behind abutments, Sqm 681.07
wing walls, return walls and Retaingin walls Geocomposite drain
(Vertical) as per RDSO Specification No. RDSO/2018/GE:IRS-0006
latest version with all material, labour, equipment, tools and plants, lead,
lift etc. complete in all respects as per the direction of Enginner-in-
Charge.
Page 5 of 106
IR's Unified Standard Schedule of Rates 2019
Page 6 of 106
IR's Unified Standard Schedule of Rates 2019
Page 7 of 106
IR's Unified Standard Schedule of Rates 2019
022050 Providing and laying in position machine batched, machine mixed and
machine vibrated Design Mix Cement Concrete of specified grade (Cast
in-Situ) using 20mm graded crushed stone aggregate and coarse sand
of approved quality for the following Reinforced cement concrete
structural elements up to height of 10 m from foundation top level,
including finishing, using Admixtures in approved proportions (as per
IS:9103), to modify workability & other properties without impairing
strength and durability complete as per specifications and direction of
the Engineer in charge. Payment for cement, reinforcement,
shuttering shall be paid extra.
022051 Abutment & Pier Cum 2719.55
022052 Wing wall and Return wall Cum 2719.55
022053 Abutment cap, Pier Cap, Inspection Platform & Pedestal over Pier cap, Cum 2843.17
Fender wall, Diaphragm wall etc.
Page 8 of 106
IR's Unified Standard Schedule of Rates 2019
022055 Extra for every increase of 1m or part thereof in the height above 10 m Cum 78.65
022060 Providing and laying Plain Cement Concrete 1:3:6 with graded stone Cum 2455.77
aggregate of 40mm nominal size, in foundation and floors, retaining
walls of bridges including mechanical mixing, vibrating, pumping and
bailing out water where ever required with all materials and labour
complete but excluding the cost of cement and shuttering as per
drawings and technical specifications as directed by Engineer
022070 Providing and fixing Weep Holes in Abutments, Wing walls and Return Metre 231.65
walls etc.,of new bridges with 110mm dia UPVC pipe Type A ISI
marked with all contractor's men, material, transportation, all taxes as
per specifications and as directed by Engineer-in-Charge.
022080 Providing, Boring and installing Bored cast in-situ Reinforced Cement
Concrete piles of specified diameter and length below pile cap of
specified grade with Design Mix Cement Concrete, using 20mm graded
crushed stone aggregate and coarse sand of approved quality, to carry
a safe working load not less than specified, excluding the cost of steel
Reinforcement, permanent casing pipe and length of pile to be
embedded in pile cap etc. complete, concreting by machine batching,
machine mixing, scaffolding, using Admixture in approved proportion
(as per IS:9103), placing with tremie pipe, chipping off of pile top to
remove laitance concrete above cut off level etc., pumping and bailing
out water with all labour material complete by percussion drilling
using Direct Mud Circulation (DMC) or Bailor and Chisel
technique by tripod and mechanical Winch machine including
crossing of tracks if required, as per approved drawing, specification
and direction of the Engineer in charge. Length of the pile for payment
shall be measured upto the bottom of RCC pile cap. Payment for
cement, permanent casing pipe (if any ) & reinforcement shall be paid
extra.
Page 9 of 106
IR's Unified Standard Schedule of Rates 2019
022131 Piles with lateral load capacity of upto 50 Tonne Each 20537.34
022132 Piles with lateral load capacity of above 50 Tonne Each 32297.82
022140 Pulse Echo Test (PET) for integrity testing of piles with contractor’s Each 3037.12
men, materials and machines. The rate includes cost of Inspection of
site, preparation of pile head and any other unforeseen cost required for
the test, submission of reports in triplicate as per satisfaction of the
Engineer in Charge at site.
WELL FOUNDATION
023010 Earth work in OPEN excavation in foundation of bridges, for placing of Cum 261.87
well curbs of all shapes and designs in all kinds of soil including taking
out the excavated soil, levelling, ramming of bottom of excavation and
trimming of sides, returning the soil in layers, consolidation, disposal of
surplus soil within a lead of 300m, including all lift, dewatering, shoring
and strutting complete as per technical specification and as directed by
Engineer in charge. (compaction of surplus soil when led to the bank
will be paid as per relevant item separately)
023011 In Ordinary rock Cum 397.97
023012 Hard rock (blasting prohibited ) Cum 1098.04
023020 Providing and constructing Temporary Earthen Island / coffer dam for
construction of well foundations of dia. upto 10m (longest dimension) ,
including bailing and pumping out of water, provision of sand bags,
wooden ballies, sheet piling, earth, sand or any other suitable material,
as required with all labour and material complete job.
023021 For water depth upto 1.00m Each 66217.75
023022 Extra for every 1.00m additional depth and part thereof over item Each 95770.11
023021 upto water depth of 4.00m.
023023 Providing and constructing one span service road to reach island Running 4877.20
location from one pier location to another pier location. Metre
Page 10 of 106
IR's Unified Standard Schedule of Rates 2019
Page 11 of 106
IR's Unified Standard Schedule of Rates 2019
024020 Providing and laying in position machine batched, machine mixed and Cum 2472.32
machine vibrated Design Mix Cement Concrete of specified grade (cast
in-situ) using 20mm graded crushed stone aggregate and coarse sand
of approved quality in Drop and curtain wall and alike structures below
bed level, including centering, shuttering and finishing complete as per
drawings and technical specifications as directed by Engineer. Payment
for cement, reinforcement and shuttering shall be made extra.
Page 12 of 106
IR's Unified Standard Schedule of Rates 2019
Page 13 of 106
IR's Unified Standard Schedule of Rates 2019
MISCELLANEOUS
025010 Deduct if 40mm graded stone aggregate is used in place of 20mm Cum 133.79
graded stone aggregate in any grade of concrete. (deduction to be
made for quantity of concrete)
025020 Providing and applying two coats of coal tar or bitumen confirming to sqm 163.63
IS:3117– latest version on the top and sides of RCC box/slabs @ 1.70
kg/sqm after cleaning the surface with all labour and materials complete
job as directed by the Engineer
025030 centering and shuttering including strutting, propping etc. and removal
of form for :
025031 All types of bridge sub-structures, e.g. pier, abutment, wing wall, sqm 602.78
retaining wall, RCC box type foundations, Abutment cap, Pier Cap,
Inspection Platform & Pedestal over Pier cap, Fender wall, Diaphragm
wall etc. upto 5m above ground level
025032 All types of bridge super-structures, e.g. slabs, I-girders, T-girders, Box Sqm 783.89
girders etc. upto 5m above ground level
025033 Extra for additional height over item no. 025031 & 025032 wherever Sqm 97.26
required with adequate bracing, propping etc. over initial height of 5
metres for every additional height of 1 metre or part thereof
025040 Providing and laying in position machine batched, machine mixed and Cum 4263.87
machine vibrated Design Mix Cement Concrete of specified grade (Cast
in-Situ) using 20mm graded crushed stone aggregate and coarse sand
of approved quality in jacketing of piers and abutments from bottom of
foundation upto a height of 10m including finishing for designed
thickness of jacketing. Payment for reinforcement, cement, wire mesh,
shuttering, drilling of holes and insertion of rods will be made extra.
025041 Extra for drilling 32mm dia. holes for jacketing / anchoring metre 146.80
025042 Extra for inserting of dowel bars of specified dia. (cost of rods to be paid metre 12.90
extra)
Page 14 of 106
IR's Unified Standard Schedule of Rates 2019
Page 15 of 106
IR's Unified Standard Schedule of Rates 2019
031011 With Soffit level upto 9m above Bed level Cum 2550.96
031012 With Soffit level From 9m above Bed Level to12m above Bed Level Cum 2786.90
031013 With Soffit level From 12m above Bed Level to 15m above Bed Level Cum 2865.55
031014 Extra over USSOR Item no. 031013 for Soffit level beyond 15m above Cum 120.18
Bed Level for every 1m or part thereof
031015 Deduct for casting of Slab in place of Girders (for any heights) Cum 39.32
031020 Providing and laying in position machine batched, machine mixed and Cum 2472.32
machine vibrated Design Mix Cement Concrete of specified grade using
20mm graded crushed stone aggregate and coarse sand of approved
quality for the Precast Prestressed (Post tensioned) concrete girder/Box
(spans upto 30.5m) in contactor’s casting yard, including finishing, using
Admixtures in approved proportions (as per IS:9103), to modify
workability & other properties without impairing strength and durability,
complete as per specifications and direction of the Engineer. Payment
for Shuttering, Cement, reinforcement, HTS cables, anchorage cones,
stressing of cables and grouting of the ducts will be done extra.
Launching of girder/slab in position is not included in this item.
031021 Deduct from 0310220 for casting of Slab in place of Girder/Box Cum 39.32
031030 Providing and laying in position machine batched, machine mixed and Cum 2472.32
machine vibrated Design Mix Cement Concrete of specified grade using
20mm graded crushed stone aggregate and coarse sand of approved
quality for the Precast Prestressed (Pre tensioned) concrete girder
(spans upto 9.1m) in contractor’s casting yard, including finishing, using
Admixtures in approved proportions (as per IS:9103), to modify
workability & other properties without impairing strength and durability,
complete as per specifications and direction of the Engineer. Payment
for Shuttering, Cement, reinforcement, HTS cables, sheathing,
anchorage cones, stressing of cables and grouting of the ducts will be
done extra. Launching of girder/slab in position is not included in this
item and shall be paid extra under relevant item.
031031 Deduct from 031030 for casting of Slab in place of Girder Cum 39.32
Page 16 of 106
IR's Unified Standard Schedule of Rates 2019
031050 Providing, fabricating & fixing in position to exact design profiles, MT 114073.84
prestressing H.T.S. cables of all classification made from Low
Relaxation strands conforming to IS:14268– latest version in
Pretensioned Prestressed Concrete girders/slabs etc. including
supplying, cutting, making into cables with necessary spacers, colour
coding, protecting with water soluble oil at all time, placing, bending,
routing, fixing, stressing including all lead and lift with contractor’s own
materials, labour, equipments etc. complete as per drawings &
specifications. Payment shall be made in terms of weight of HTS cables
as per drawing.
031060 Extra for using HDPE sheathing in place of CRCA sheathing MT 147.17
031070 Making suitable designed staging for cast in-situ PSC girders/slabs Cum 1962.01
upto 10.5m height from bed level upto soffit of girder/slab with all
contractors materials, machinery, tools and plants, transportation
complete in all respects required for casting and removal of the same
after completing the work and restoring the site to original. The payment
for staging shall be made on the cubical quantity of main
Girders/slabs.
031080 Supplying and laying in position specified grade precast prestressed Cum 2472.32
cement concrete ballast retainers of size, as directed by Engineer In-
charge. Payment for Shuttering, Cement, reinforcement, HTS cables,
anchorage cones, stressing of cables and grouting of the ducts will be
done extra.
031090 Design, manufacturing, supplying and fixing in position elastomeric Cu Cm 1.47
bearing true to line and level conforming to IS:3400, IS:226, BS-5400
under prestressed concrete girders/ Steel Girders, for Pre-cast as well
as cast-in-situ girders as per approved drawing. The rate shall include
cost of load test of one no. bearing from Railway approved firms and all
fixing materials, equipments, machineries, labour, taxes, loading,
unloading, leading, lifting etc. complete. Rates include getting the
drawing approved from Railway and cost of inspection during
manufacturing from railway approved organization. (Note : 1. The rate
is for finished item complete and paid only after fixing in position below
the girder. 2. The volume shall be given in the drawing and no
deduction shall be made for inserted steel plates etc.)
Page 17 of 106
IR's Unified Standard Schedule of Rates 2019
Page 18 of 106
IR's Unified Standard Schedule of Rates 2019
Page 19 of 106
IR's Unified Standard Schedule of Rates 2019
Page 20 of 106
IR's Unified Standard Schedule of Rates 2019
Page 21 of 106
IR's Unified Standard Schedule of Rates 2019
041101 Extra over item 041100 for working under running traffic/ traffic block MT 10%
041110 Supplying, fitting and fixing in position true to line and level forged steel MT 689.30
roller bearing of different load bearing capacity conforming to IS :7666,
IS:9565, IS:1030, IS:919, IS:3073 and IRS Bridge Code including all
accessories as per drawing and Technical Specifications with all
material, labour, T&P as a complete job. The payment shall be made for
the load bearing capacity in Metric Tonne as per approved drawing.
041111 Extra over item 041110 for working under running traffic/ traffic block MT 10%
041120 Supplying, fitting and fixing in position true to line and level sliding plate MT 1776.52
bearing of different load bearing capacity with PTFE Surface sliding on
stainless steel as per BS:3784, BS 5400, complete including all
accessories as per Drawing and Technical Specifications with all
material, labour, T&P as a complete job.The payment shall be made for
the load bearing capacity in Metric Tonne as per approved drawing.
Page 22 of 106
IR's Unified Standard Schedule of Rates 2019
Page 23 of 106
IR's Unified Standard Schedule of Rates 2019
Page 24 of 106
IR's Unified Standard Schedule of Rates 2019
041230 Surface preparation of steel work of bridge triangulated girders by Sqm 67.84
cleaning with scrappers and/or wire brushes to remove all rust and
loose or perished paint to prepare perfectly clean & dry bare metal
surface free from all dirt/foreign material & ready for initial coat of paint.
Rate includes cost of labour, consumables, brushes, misc. tools and
plants, ladders, scaffoldings, jhoola, hanging scaffolding, staging etc.
041240 Surface preparation for painting of bridge plate/composite girders and Sqm 22.27
other steel structures where the finishing coat shows signs of
deterioration; but primer coat of paint is sufficiently in good condition
and there are no signs of rusting etc. Surface shall be cleaned free from
oil grease, scaling and other foreign matters without disturbing the
primer coat {Rate includes cost of labour, consumables, tools & plants,
scaffolding, jhoola, ladder etc.}
041250 Surface preparation for painting of bridge Triangulated girders where Sqm 33.40
the finishing coat shows signs of deterioration; but primer coat of paint
is sufficiently in good condition and there are no signs of rusting etc.
Surface shall be cleaned free from oil grease, scaling and other foreign
matters without disturbing the primer coat {Rate includes cost of labour,
consumables, tools & plants, scaffolding, jhoola, ladder etc.}
041260 Painting cleaned bridge plate/composite girders including all
scaffolding, shuttering and strutting along with provision of Jhoola /
hanging scaffolding ladders etc. where required
041261 With one coat ready mix Zinc Chromate conforming to IS:104 with DFT Sqm 86.37
of 25-30 Microns followed by one coat of Zinc Chromate red oxide
conforming to IS:2074 DFT of 25 Microns
041262 With two cover coats of ready-mixed paint conforming to IS:13607 with Sqm 115.46
colour/shades, as decided by Engineer-incharge
Note: DFT of each coat shall be 20-25 microns
041263 With two coats Aluminium paints in dual containers conforming to Sqm 99.71
IS:2339 with DFT of 12 - 14 Microns for each coat.
Page 25 of 106
IR's Unified Standard Schedule of Rates 2019
041291 Film Thickness Coating of 80 micron for Rural & Arid environment Sqm 2252.28
041292 Extra over Item no. 041291 for Film Thickness Coating of 120 micron Sqm 804.94
for Medium Industrial & Marine environement
041293 Extra over Item no. 041291 for Film Thickness Coating of 200 micron Sqm 2424.56
for Severe Industrial & Marine enviroment
041294 Extra for working under traffic conditions over item numbers 041291 to Sqm 10%
041293
041300 Supply, fabrication and erection of bed plate of approved sizes in exact
position over bed block on pier/abutments by giving full and even
bearing, setting them on the layer of free flow nonshrinkable grouting
compound, scrapping or chipping of bed block, if required, fabrication
and fixing of HD bolts of suitable sizes alongwith nuts, washers etc.,
drilling holes of required size, grouting of holes by epoxy mortar after
fixing HD bolts. Total work to be done during traffic block.
041301 Upto 12.2m clear span Kg 241.02
041302 More than 12.2m, but upto 18.3m clear span Kg 253.07
041303 More than 18.3m, but upto 30.5m clear span Kg 265.12
041310 Assembling and erecting pre-fabricated structures, such as columns, MT 7176.03
beams, girders, other members of FOBs and sheds; including leading
all structural elements within 1 Km lead, bolting, riveting or welding as
per approved drawing or as directed by Engineer In-charge. Rate shall
include cost of labour, materials, tools & plants and only pre-fabricated
structural elements shall be given by Railway. (Work not requiring traffic
or power block)
Page 26 of 106
IR's Unified Standard Schedule of Rates 2019
'041380 Fabricating ,supplying and fixing of helical compression spring 630mm Each 15732.14
long and 100mm mean dia of helix with 28 numbers fo spring coils
,conforming to IS 7906(PART-1) -1997 made of 20mm dia spring rod of
spring steel conforming to grade 2 of IS .4454 (part-1)-2001 and
suitable rubber washers on either side to suit the horizontal beam of
height gauges for heavy traffic ,shown in the SCR drawign No.
GM(W)/SC/BR/2729/2010(ALT-2) at any location specified by railway
with all contractors materials ,consumables ,tools ,men ,machinery
,cranes,including all lead and lift ,transportation etc and as directed by
the Engineer in charage at site.This includes arrangements for
protection of road traffic and including night working if required -Note
one height gauge consists of Two Springs
'041390 Supplying fabricating and erecting welded and/or bolted and/or riveted MT 76366.68
steel work in built up sections, trusses and framed work, staging, racks
etc.for Steel Structures other than bridge girders, using RSJ, tees,
angles and channels/flats, plates, gussets, round or square bars, cleats,
bolts etc., with contractors own steel including cutting, bending,
straightening, drilling, riveting, hoisting, fixing, erecting, welding, bolting
etc., with Providing stiffeners wherever required as per approved
drawing including applying a priming coat of a approved steel primer
with all contractor’s materials, labour, tools & plants, lead & lift including
crossing of tracks if required etc., complete as per specification and as
directed by Engineer-in-charge.
Page 28 of 106
IR's Unified Standard Schedule of Rates 2019
Page 29 of 106
IR's Unified Standard Schedule of Rates 2019
Page 30 of 106
IR's Unified Standard Schedule of Rates 2019
052120 Providing & applying epoxy with pot life not less than 60-90 minutes for Sqm 761.22
bonding of new concrete with old concrete @ 0.80 kg/sqm and as per
specifications including cleaning the surfaces complete as per approved
procedure
052130 Providing & fixing 12 mm rabbit wire mesh at the junction of RCC where Sqm 130.25
specifically ordered or as shown in the drawing
052140 Providing / fixing / grouting various size HTS holding down bolt in Kg 195.69
concrete column or in other structural steel member using epoxy
concrete including drilling holes of required size, bolts threaded at both
ends shall be fixed with proper size nuts bolts, plates, washers
complete including all labour and material
052150 Providing weep holes by making suitable opening or drilling in existing Metre 530.86
Brick Masonry / Plain / Reinforced Concrete abutment, wing wall/return
wall with 110 mm dia UPVC pipe (working pressure 4kg/sqcm)
extending through the full width of the structure complete and repairing
the same with cement mortar 1:2 (1 cement : 2 coarse sand). Rate
includes cost of cement.
052160 Providing and fixing of Drainage Spouts of 110mm UPVC Type A ISI Metre 335.83
marked (Working pressure 4 kg/sqcm) using suitable clamps and
adhesive etc., complete.
052170 Providing and laying of filter media consisting of granular materials of Cum 2535.92
GW, GP, SW groups as per IS:1498 (latest) in required profile behind
boulder filling of abutments, wing walls / return walls etc. above bed
level with all labour and material complete job as per drawing and
technical specification of RDSO Guidelines.
052180 Removing all loose concrete, cleaning rust with dusting compound &
water jet, drying, replacing worn out reinforcements by welding new
reinforcement for making up lost steel section, applying approved anti-
corrosive polymer coating over the damaged area to proper profile,
providing polymer mortar (upto 20mm thickness) or polymer concrete
(more than 20mm thickness) consisting of cement, sand, 6mm down
chips where required and polymer as per manufacturers' specification.
The rate includes curing for 14 days, all materials, consumables,
labours, tools and plants, scaffolding/staging with all lead and lift. Cost
of cement & inforcement to be paid separately.
052181 20mm thick polymer mortar Sqm 1698.89
052182 20mm-50mm thick polymer concrete Sqm 1259.08
Page 31 of 106
IR's Unified Standard Schedule of Rates 2019
Page 32 of 106
IR's Unified Standard Schedule of Rates 2019
052290 Supplying & fixing Galvanised Steel Wire Ropenet, made of 9mm dia. Sqm 1212.31
steel wire rope having aperture size of 45cm x 60cm with 6m long
hangs for top anchoring and 5m wide alongwith chain-link mesh-netting
of 80mm x 80mm mesh size made from 2.4mm dia galvanised wire,
joining of chain-link mesh & steel wire ropenet and joining of adjacent
nets with galvanised spiral lock springs of steel wire dia 2.2mm; inner
dia. of springs 18mm; total length 50mm ± 0.5mm; pitch 4mm & open
end length 60mm including cutting of tree/shrub etc. in rope-netting
location and also, excavation / filling-back of trenches in all types of soil
after anchoring ropenet with RCC pre-cast beam of size 15cm x 15cm x
2m of M-15 concrete & 30cm thick M-10 PCC. This work also includes
supply of 200mm x 200mm x 6mm epoxy coated washer plates with
12.5mm / 18mm dia. hole at centre and supplying & fixing of anchor
bolts/fastners of 10mm dia. including drilling of holes upto a depth of
110mm in rock; cleaning of holes; fixing of fastners with nut & epoxy
coated washer plates; applying torque 65 to 70 N/mm for fixing of
ropenet for intermediate anchoring on the surface of cutting, bottom
anchoring upto 1m depth by using 16mm dia. HYSD steel bolts,
052300 Supplying & placing of Mechanically Woven Double Twisted Hexagonal Cum 3159.30
Shaped Wire Mesh Gabion Boxes of required sizes, Mesh Type 10cm x
12cm, Zn and PVC coated Mesh Wire dia. 2.7/3.7mm (ID/OD), edges of
meshes mechanically edged / selvedged with heavy coating of
galvanization as per EN 10223-3/ASTM A 975 with partitions at every
1m interval and properly packed with approx. 150mm size boulders
including transportation and placing at indicated places as per direction
of engineer-in-charge including contractor's tools, plants, labour, royalty
charges etc. complete in all respect and stitching with lacing wire of dia.
2.2/3.2mm (ID/OD) @ 5% by weight of Gabion boxes, carrying the
material by head lead from nearest approach with all safety precautions
and all leads and lifts.
052310 Supplying & placing partly or fully underwater of Polypropylene Tarred Cum 3029.41
Rope Gabion, fabricated from 9mm dia. rope, 100mm x 100mm Mesh
with partitions at every 1m interval and properly packed with
approximately 150mm size boulders including transportation and
placing at indicated places as per direction of engineer-in-charge with
contractor's tools, plants, labour etc. including royalty charges complete
in all respect and stitching with polypropylene lacing rope of minimum
dia. 4mm; carrying the material by head lead from nearest approach
with all safety precautions and all leads and lifts.
Page 33 of 106
IR's Unified Standard Schedule of Rates 2019
053030 Surface protection of Bridge Deck by cleaning and preparing the Sqm 713.90
surface by acid etching; treating the surface with a two-layer plaster;
first layer of 5mm thick with cement (OPC or slag), admixed with an
octadecanoic acid based cementitious waterproofing compound (bulk
density not greater than 0.5 gm/cc) in the weight ratio of 50:3 for
cement and waterproofing compound, further enriched with specially
fabricated deformed galvanized steel fibre @ 150 gm/sqm of treated
surface and second layer of 12mm thick cement-sand (1:2.5) plaster,
enriched with polyester fibre (to be paid separately) and curing the
plastered surface. Treatment shall be impermeable under a water head
of 20m complete as per specifications.
053040 Shotcreting in two layers (each layer of 38mm thickness) with cement Sqm 1839.10
concrete mortar 1:1:2 (1 cement : 1 coarse sand : 2 coarse aggregate)
mixing epoxy & fixing welded wire mesh 50mm x 50mm x 3mm in
between two layers including cost and conveyance of all materials,
labour charges, leads, lifts, centering, scaffolding, machine mixing,
laying concrete with shotcrete machine etc. complete as per
specification and as directed by Engineer in-charge
053050 Designing and developing Detailed structural and working Drawings for
following items for ROB/RUB/Bridge based on Railway's approved
GADs, duly collecting necessary data from Railways and R&B
authorities, duly designing members and submission of check plot duly
getting proof-checked by Railway approved institutes, submitting for
Railway's verification and approval, making corrections duly
incorporating suggestions in drawings/designs, further submission of
original in transparent film paper and soft copy (CD) for Railways
approval etc. with contractor's technical expertise and instruments,
labour, consumables, repeatedly attending till final approval etc.,
complete as directed by Engineer in-charge.
Page 34 of 106
IR's Unified Standard Schedule of Rates 2019
Page 35 of 106
IR's Unified Standard Schedule of Rates 2019
Page 36 of 106
IR's Unified Standard Schedule of Rates 2019
Page 37 of 106
IR's Unified Standard Schedule of Rates 2019
Page 38 of 106
IR's Unified Standard Schedule of Rates 2019
Page 39 of 106
IR's Unified Standard Schedule of Rates 2019
Page 40 of 106
IR's Unified Standard Schedule of Rates 2019
Page 41 of 106
IR's Unified Standard Schedule of Rates 2019
Page 42 of 106
IR's Unified Standard Schedule of Rates 2019
Page 43 of 106
IR's Unified Standard Schedule of Rates 2019
Page 44 of 106
IR's Unified Standard Schedule of Rates 2019
Page 45 of 106
IR's Unified Standard Schedule of Rates 2019
Page 46 of 106
IR's Unified Standard Schedule of Rates 2019
081100 Boxing of ballast as per profile mentioned in IR's LWR Manual including
cess dressing on both sides of track. The work will include removing
excess ballast from track and putting the same in crib and shoulder by Track
26.08
leading to a maximum of 50m including crossing of track, deweeding on Metre
ballast section etc and as directed by Engineer-In charge
Page 47 of 106
IR's Unified Standard Schedule of Rates 2019
Page 48 of 106
IR's Unified Standard Schedule of Rates 2019
Page 49 of 106
IR's Unified Standard Schedule of Rates 2019
Page 50 of 106
IR's Unified Standard Schedule of Rates 2019
091055 For 90R Rail, 2-piece Mould and Air Petrol heating technique (Without
Each 2872.28
Weld Trimmer)
091060 25mm gap Cess Welding and finishing of rail joints as per IR's AT
Welding Manual with Railway’s welding portion under Railway’s
supervision by contractor's competent welder and other skilled labour
including consumables, tools & equipments. Item includes trimming &
grinding by machines. Only welding portion and related consumables,
e.g. Single shot crucible/conventional crucible as per method of welding
,pre-fabricated dry mould, mould shoes, luting sand, closing pin,
asbestos powder, igniter, thimble and magnesite powder will be
supplied by Railways. All other tools, equipments etc. including fuel for
pre-heating will be arranged by contractor. Item also includes anti
corrosive painting to weld & marking of welded joint, as directed by
engineer in-charge :
091061 For 60 Kg Rail, Single shot crucible fitted with Automatic Tapping
Thimble Technology, 3 pieces Mould (Zircon washed) and Compressed Each 1432.03
Air Petrol heating technique
091062 For 52 Kg - 90 UTS Rail, Single shot crucible fitted with Automatic
Tapping Thimble Technology, 3 pieces Mould (Zircon washed) and Each 1352.70
Compressed Air Petrol heating technique
091063 For 52 Kg - 72 UTS Rail, Single shot crucible fitted with Automatic
Tapping Thimble Technology, 3 pieces Mould (Zircon washed) and Each 1324.11
Compressed Air Petrol heating technique
091064 For 52 Kg - 72 UTS Rail, 2-piece Mould and Air Petrol heating Each 1220.90
091065 For 90R Rail, 2-piece Mould and Air Petrol heating technique (Without
Each 1062.36
Weld Trimmer)
091070 75mm gap 'in-situ' welding and finishing of rail joints as per IR's AT
Welding Manual with latest correction slips, RDSO approved welding
portion and competent welder, labour, tools, equipments complete
during traffic block.
{Item includes use of weld trimming machine and grinding of finished
weld to meet the weld tolerances and also anti corrosive painting to
weld & marking of welded joint, as directed by Engineer in charge} -
091071 52 Kg 90 UTS rail Each 9782.97
091072 60 Kg 90 UTS rail Each 10601.25
091080 Welding and finishing of rail joints connecting rail sections of 60kg on
one end and 52kg on other end as per IR's AT Welding Manual by
50mm wide gap with contractor’s RDSO approved welding portion and
competent welder, labour, tools, equipments and all materials
(Note : Item also includes grinding of weld finished to meet the weld
tolerances and also anti corrosive painting & marking of welded joint,
as directed by engineer in-charge)
091081 On Cess condition Each 6720.64
091082 In-situ condition under traffic block Each 8255.14
2. Flash Butt Welding Works :
091090 Flash Butt Welding of 90 UTS rails, conforming to IR’s Manual for Flash
Butt Welding of Rail, using contractor’s self-propelled rail cum road /
Mobile FBW Plants, tools, equipments and consumables. Item also
includes painting and marking of welded joints, pre-straightening & post-
straightening of panels and USFD testing of finished weld as directed by
engineer in-charge for -
091091 52 Kg on Cess Each 3242.53
091092 60 Kg on Cess Each 3705.74
091093 52 Kg 'in-situ' under traffic block Each 4348.38
091094 60 Kg 'in-situ' under traffic block Each 5219.23
Page 51 of 106
IR's Unified Standard Schedule of Rates 2019
Page 52 of 106
IR's Unified Standard Schedule of Rates 2019
Page 53 of 106
IR's Unified Standard Schedule of Rates 2019
Page 54 of 106
IR's Unified Standard Schedule of Rates 2019
Page 55 of 106
IR's Unified Standard Schedule of Rates 2019
Page 56 of 106
IR's Unified Standard Schedule of Rates 2019
121050 Removing, screening and salvaging ballast from track, duly digging /
scarifying ballast by beaters / wire brushes, leveling formation after
salvaging ballast, separating muck by screening the salvaged ballast
with contractor's 20mm size sieve, stacking of sieved ballast for Cum 444.66
measurement on or outside the formation along track, disposing off
muck at specified locations under non-traffic conditions with all ascents,
descents, as directed by Engineer in-charge
121060 Dismantling existing sand humps in yards including brick / stone
masonry on either sides of track, removing sand and earth to the
required level including clearing site and stacking released materials
clear of infringement, complete and as directed for -
121061 Broad Gauge Each 12872.30
121062 Metre Gauge Each 10469.36
2. Barricading Works :
121070 Provision of barricading with contractor's bamboos / balli vertical post of
75 to 100mm dia. planted at every 2m interval, projecting at least 1.5m
above ground level and driven firmly (minimum 0.5m) inside ground and
including painting verticals & horizontals with red luminous paints / strips
at alternative bay on barricade. Barricades shall be completely removed
when no longer required by engineer in-charge. (60% payment shall be
made on provision of barricading at work-site)
121071 With 3 horizontal bamboo / balli members of minimum 50mm dia. Running
149.82
spaced equally Metre
121072 Joining with strong nylon rope in one cross and one horizontal pattern of Running
94.69
minimum 5mm dia. Metre
Page 57 of 106
IR's Unified Standard Schedule of Rates 2019
Page 58 of 106
IR's Unified Standard Schedule of Rates 2019
Page 59 of 106
IR's Unified Standard Schedule of Rates 2019
Page 60 of 106
IR's Unified Standard Schedule of Rates 2019
Page 61 of 106
IR's Unified Standard Schedule of Rates 2019
Page 62 of 106
IR's Unified Standard Schedule of Rates 2019
Page 63 of 106
IR's Unified Standard Schedule of Rates 2019
Page 64 of 106
IR's Unified Standard Schedule of Rates 2019
131151 For Rails more than 13m and upto 40m length Running 33.80
Metre
131152 For Rails more than 40m length Running 42.63
Metre
131160 End cropping & pulling back of rails and adjustment of creep by making
joints square including cutting & drilling of rails duly providing suitable
rail closure and connecting with fish plates & bolts etc. as prescribed in
Indian Railways Permanent Way Manual.
{Note : (1) The work will be done under traffic block condition, (2)
Welding of rail joints, if required, shall be paid separately}
131161 For Broad Gauge track per joint Each 1542.60
131162 For Metre Gauge track per joint Each 1091.86
131170 Providing temporary Buffer Rails of fish plated joints of 3 pairs, Set 10674.10
measuring 6.5m each, duly removing rails of the existing track including
cutting & drilling of rails as required for isolating LWR/CWR on all types
of track structure. Work will be done under traffic block condition.
NOTE:
1.Each set comprises of 3 pairs of rails 6.5 m long only.
2.Only Rails fish plate and fish bolts will be supplied free by Railway
within free lead of 250m.
3.For providing additional pair of Buffer rails on Zones III&IV, 33% of
item 131160 to be paid extra
4. Re-Alignment of Curves :
131180 Slewing and realigning of curves on existing Broad Gauge track under
running traffic condition, as directed by Engineer in-charge with
contractor labour, tools & plants, as required with general lift upto 25mm
including one round of through packing, loosening/tightening of P.Way
fittings, if required and other incidental works :
[Note:- Payment will be made based on average slew calculated in
each 50m length of track by averaging absolute values of positive and
negative value of slews.]
Other than PSC Sleeper track -
131181 Maximum slew upto 50mm Track Metre 97.68
131182 Maximum slew more than 50mm and upto 100mm Track Metre 115.58
131183 Maximum slew more than 100mm and upto 150mm Track Metre 128.38
131184 Maximum slew more than 150mm Track Metre 143.33
PSC Sleeper track -
131185 Maximum slew upto 50mm Track Metre 117.86
131186 Maximum slew more than 50mm and upto 100mm Track Metre 144.78
131187 Maximum slew more than 100mm and upto 150mm Track Metre 166.90
131188 Maximum slew more than 150mm Track Metre 191.10
131190 Slewing and realigning of curves in existing Metre Gauge track under
running traffic conditions, as directed by Engineer in-charge with
contractor labour, tools and plants, as required with general lift upto
25mm including one round of through packing, loosening/tightening of
P.Way fittings, if required and other incidental works :
[Note:- Payment will be made based on average slew calculated in
each 50m length of track by averaging absolute values of positive and
negative value of slews.]
Other than PSC Sleeper track -
131191 Maximum slew upto 50mm Track Metre 69.93
131192 Maximum slew more than 50mm and upto 100mm Track Metre 80.01
131193 Maximum slew more than 100mm and upto 150mm Track Metre 85.81
131194 Maximum slew more than 150mm Track Metre 96.68
Page 65 of 106
IR's Unified Standard Schedule of Rates 2019
Page 66 of 106
IR's Unified Standard Schedule of Rates 2019
131350 Interchanging gauge face of rails of any section in running track Track Metre 106.60
including removal of fittings and re-fixing the same after changing of
gauge face, cutting of rails, joining the rails with fish plate & drilling
holes, if required as per lengths, as directed by engineer in-charge
{cutting of rail & drilling of holes shall be paid separately}
131360 Removing existing glued joints from running track under traffic Each 3178.27
condition, duly cutting rails, inserting transported cut rails / glued joints
of required length by providing gap for carrying out welding or joining
rails with fish plates, duly drilling holes in cut rail and approach rail, if
required as directed by engineer in-charge
NOTE: 1.Drilling holes & rail cutting will be paid separately)
(2) Rails, fish plates will be made available within free lead of 250m in
yard (3) One set consists of two numbers of two joints
131370 Fixing of wooden distance pieces for platforms with contractor's labour,
tools and plants of size Wooden Block (size : 1.0m x 0.3m x 0.15m)
131371 With Railway’s wooden block (by cutting Railway’s wooden sleepers into Each 181.15
blocks by sawing to size)
131372 With Contractor’s hard wood block Each 1135.01
131380 Casual renewal of tie bars of C.I. Plate sleepers including carrying Tie Each 83.51
Bars and stacking released ones including adjustment of gauge &
squaring of sleepers and fixing of new cotters after splitting the same
where necessary and packing of sleepers
131390 Conversion of square holes of M.S. bearing plates into round holes of Each 63.31
specified diameter with contractor’s tools & plants
Page 67 of 106
IR's Unified Standard Schedule of Rates 2019
Page 68 of 106
IR's Unified Standard Schedule of Rates 2019
Page 69 of 106
IR's Unified Standard Schedule of Rates 2019
Page 70 of 106
IR's Unified Standard Schedule of Rates 2019
Page 72 of 106
IR's Unified Standard Schedule of Rates 2019
151051 With Railway’s portal crane for PSC sleeper track Track 54.85
Metre
151052 With Railway’s portal crane for other than PSC sleeper track Track 29.61
Metre
151053 With contractor’s portal crane for PSC sleeper track Track 61.71
Metre
151054 With contractor’s portal crane for other than PSC sleeper track Track 34.76
Metre
151060 Mechanical / Manual loading of all types of rails on BFRs in PQRS
Depot, as directed by engineer in-charge :
Page 73 of 106
IR's Unified Standard Schedule of Rates 2019
Page 74 of 106
IR's Unified Standard Schedule of Rates 2019
Page 75 of 106
IR's Unified Standard Schedule of Rates 2019
151190 Removal of screened muck discharged by FRM / SBCM from cuttings, Running 18.08
drains, platform etc. (including muck around OHE mast, signal post Metre
etc.) and lifting it beyond 5m from edge of cutting which are upto 3m
deep or alternatively carting it upto 50m for disposing it off beyond
length of cutting / platform and making up cess wherever low, using
muck
151191 Extra to item nos. from 151180 and 151190 for disposal of muck at a Running 2.41
distance beyond 50m for every additional lead of 50 metres or part Metre
thereof upto 500 metres
151192 Extra to item nos. from 151180 and 151190 for disposal of muck for Running 5.02
additional lift of 1 metre or part thereof beyond 3 metre lift in case of Metre
disposal of muck from track in cutting
151200 Ballast equalisation & ballast profiling after completion of deep Track 32.09
screening work by BCM and/or unloading of ballast by DMT (Ballast Metre
Train), as directed by Site Engineer as per IRPWM including heaping of
ballast in tamping zone keeping rails & sleeper top free from ballast,
spacing and squaring of sleeper, gauging, cleaning of muck, proper
fixing of fastening, attention during each round of sleeper tamping in
relation to pre & post working
NOTE:[Payment shall be made only once in irrespective of numbers of
TTM packing round and after restoration of normal speed and
restoration of complete ballast profile and cess profile.]
151210 Making cess in deep screened track by using screened muck Track 51.67
discharged by BCM where cess is low or cutting cess to required depth Metre
upto 4m from centre of track, where cess is high and disposing off extra
muck beyond 5m from edge of cutting which are upto 3m deep or
alternatively carting it upto 50m for disposing it off beyond cutting or
platforms, so as to make cess as per standard profile including
providing proper slope
151220 Carrying out packing of sleepers behind BCM including filling ballast Track 77.49
when only lifting is carried out by BCM. Rate includes attending track Metre
parameters with required manual packing, so as to make track fit for 30
kmph speed
151230 Pulling the left over ballast to the shoulders and dumping excess ballast Track 28.18
in the cribs and shoulders including boxing/profiling as per IRPWM of Metre
track together with left over stretches at fixed structures/masts
immediately after FRM work, leveling the muck for making up cess and
side slopes including removing and re-fixing of traction bonds during
line block with all contractors labour, tools, plant, all lead, lift, crossing of
track etc. complete and as directed by the Engineer-in-charge
Ballast Cleaning Machine (BCM) :
151240 Carrying out various miscellaneous works for proper upkeep of crew Day 1811.57
rest van / rest room, as directed by machine in-charge by (BCM) :
(1) Bringing water from nearby source and cleaning machine with water
jet or any suitable means;
(2) Fuelling machine, duly bringing diesel / hydraulic oil from the stacked
drums;
(3) Bringing water to the staff rest van or staff rest room, cleaning the
rest van / rest room, cooking food for Track Machine staff or bringing
food from outside (cost of food shall be borne by the staff concerned)
Page 76 of 106
IR's Unified Standard Schedule of Rates 2019
Page 77 of 106
IR's Unified Standard Schedule of Rates 2019
Page 78 of 106
IR's Unified Standard Schedule of Rates 2019
Page 79 of 106
IR's Unified Standard Schedule of Rates 2019
Page 80 of 106
IR's Unified Standard Schedule of Rates 2019
Page 81 of 106
IR's Unified Standard Schedule of Rates 2019
Page 82 of 106
IR's Unified Standard Schedule of Rates 2019
Page 83 of 106
IR's Unified Standard Schedule of Rates 2019
161140 Breaking of brick work, asphalt and rocks by Concrete Sleeper Breaker
with contractor's tools & plants, equipments, consumable etc. with all
lead & lift complete, as directed by Engineer in-charge. Concrete Cum 1643.43
Sleeper Breaker shall be as per RDSO's Specification No. TM/SM/30,
dated 26.10.1995
161150 Drilling of holes (vertically) into concrete sleeper in-situ for fixing guard
rails and check rails on concrete sleeper track at specified locations by
concrete sleeper drilling machine with contractor's tools & plants,
equipment, consumable with all lead & lift etc. complete, as directed by
Engineer in-charge as per RDSO's Specification : {(i) Machine shall be
able to drill hole in concrete sleeper from 16 mm to 22 mm dia. (ii)
Action of machine shall be fast enough to drill hole in minimum time, i.e.
it shall not take more than 10 minute for drilling hole of dia. 22mm and
depth 150mm. (iii) Machine shall be able to drill hole of required size in-
Each 78.98
situ condition. (iv) In case of electrically operated machine, operating
voltage shall be 220-250 V to enable it to operate with domestic supply
of electricity, single phase, A.C., 50 Hz or with single phase light weight
portable generator commonly available in the market, (v) Weight of
machine shall not exceed 10 kg for electrically machine (without prime
mover) and 50 kg for Diesel/Petrol operated machine (including prime
mover) (vi) Machine shall be either non-infringing type or capable of
being removed within 30 seconds to the face of approaching train.}
3. Fittings :
161160 Measuring of Toe Load of ERC during service in field by Toe Load
Measuring Device (Mechanical) with contractor's tools & plants,
equipment, consumable with all lead & lift etc. complete, as directed by
Each 3.53
Engineer in-charge. Toe Load Measuring Device (Mechanical) will be as
per RDSO's Specification No. TM/SM/14 (Rev. 01 of 2005 with all
updation)
161170 Measuring of Toe Load of ERC during service in field by Electronic Toe
Load Measuring Device with contractor's tools & plants, equipment,
consumable with all lead & lift etc. complete, as directed by Engineer in-
Each 3.93
charge. Electronic Toe Load Measuring Device will be as per RDSO's
Specification No.TM/SM/ETLMD/218 (Rev. 01 of 2003 with all updation)
Page 84 of 106
IR's Unified Standard Schedule of Rates 2019
Page 85 of 106
IR's Unified Standard Schedule of Rates 2019
Page 86 of 106
IR's Unified Standard Schedule of Rates 2019
Page 87 of 106
IR's Unified Standard Schedule of Rates 2019
171221 Extra over item No 171220 for every additional Km or part there of over Km 9.63
2000 Km in a month
171230 Hiring and operating Multi-Utility vehicle of loading capacity one MT with Month 50353.28
sitting capacity of 4/6 persons, 4 strokes, 4 cylinders engine, factory-
built metal body, cargo box type or passenger cabin type or both (with
24 hours availability), including cost of fuel, lubricants, major/minor
repairs, salary of driver, toll tax, all other tax complete, operation and
maintenance including running upto 1200 km in a month. The vehicle
shall run on pucca, kutcha road and along the track. The contractor
shall arrange road permit for vehicles for all the States of operation, as
per instructions of engineer in-charge and vehicle shall not be more
than three years old.
NOTE: This item to be executed through Special tender.
171231 Extra over item No 171230 for every additional Km or part there of over Km 8.03
1200 Km in a month
Page 89 of 106
IR's Unified Standard Schedule of Rates 2019
181110 Fabrication (including cutting & bending) and fixing of check rails of all
sections as per Railway’s approved drawings & specifications for level
crossings / trolley paths, duly cutting rail flanges, wherever required to
Running
correct alignment and level with Railway’s rail, fittings & fastenings, 1072.41
Metre
drilling of holes in check rails with all fittings, e.g. rail screws / grip
expansion bolts, brackets, packing pieces, bolts, washers etc. and as
directed by the engineer in-charge
181120 Fabricating (cutting,drilling and machining) and fixing of check rails of all
sections as per drawing and directions of engineer in-charge with all
contractor’s labour, tools and materials complete. Rails shall be
supplied by Railways
181121 For rails of 90 UTS and above Running
1240.61
Metre
181122 For rails of 72 UTS Running
1072.56
Metre
181130 Cutting foot of rail by gas or any other approved method for check rails
Running
with contractor’s tools & plants. Payment shall be made for length of 209.59
Metre
cutting of foot.
181140 Manufacture & supply of stoppers & other accessories, such as grip
expansion bolts, brackets, packing pieces, bolts etc. as per standard Each 417.88
drawing for fixing check rail at level crossing
181150 Fixing check rails on level crossings with MS brackets, MS packing
plates, bolts & nuts, spring washers etc. as per approved drawing &
Each 4684.79
specifications, as directed. Rails, MS brackets, packing plates, bolts &
nuts, spring washers will be supplied by Railways
4. Painting Works :
181160 Painting of running rails and check rails with approved bituminous paint
Running
(RDSO's Specification no. M&C/PCN/120-2011), duly cleaning running 30.82
Metre
rail and check rail, as directed by Engineer incharge
181170 Providing 1:6 sand bituminous mix (Hot mix) on pre-cast slab joints duly
levelling edges of slab and packing / grouting as required on level Sqm 863.24
crossing portion with all labour and material by contractor.
181180 Painting speed breakers with paint of approved quality & colour over the
Bituminous surface near approaches to level crossing, as directed -
181181 With Normal paint (two coats) Sqm 141.62
181182 With Hot melt thermoplastic road marking paint Sqm 116.05
5. Fencing And Gate Boom Related Works :
181190 Dismantling existing rail hurdle fencing including removal of base
concrete and stacking released materials in a neat and countable
manner clear of infringements from the track, removing debris clear of Running
87.00
site alongwith disposing debris, as directed by engineer in-charge within Metre
free lead of 250 metre & lift upto 5 metre complete with all labour, tools
& plants by contractor
Page 91 of 106
IR's Unified Standard Schedule of Rates 2019
Page 92 of 106
IR's Unified Standard Schedule of Rates 2019
Page 93 of 106
IR's Unified Standard Schedule of Rates 2019
Page 94 of 106
IR's Unified Standard Schedule of Rates 2019
Page 95 of 106
IR's Unified Standard Schedule of Rates 2019
Page 96 of 106
IR's Unified Standard Schedule of Rates 2019
Page 98 of 106
IR's Unified Standard Schedule of Rates 2019
Page 99 of 106
IR's Unified Standard Schedule of Rates 2019
211120 Breaking the damaged PSC sleepers including dragging, if required duly Each 235.89
removing inserts and HTS wires safely and handing over to Railways at
Stores or Depot of SSE/P.Way, including disposing the broken concrete
pieces, as directed by Engineer in-charge
211121 Deduction to Item no. 211120 for taking away HTS wire (Steel) of one Each 120.00
PSC sleeper by contractor