Virendra Rai: Contact No: 7000144479
Virendra Rai: Contact No: 7000144479
Virendra Rai: Contact No: 7000144479
E-mail: [email protected]
A professional with 17 years of national project execution experience, seeks an assignment, preferably in
Indian Infrastructure, Commercial Construction Sector.
Career Enhancement
Joined M/s HCC, India as supervisor and progressively managed position of higher responsibilities,
through sheer hard work and dedication of Section In-Charge/Deputy Project Manager, Project
Manager.
Managed large infrastructure project with outlays of 400 Cr
Professional Experience
PRESENT Employment-
Working with M/S Krishnanand Infra , Nagpur as Dy PM From 2019 till date.
Up- gradation of NandedKinwat– Mahur – Arni Road Section from SarsamBudruk to Kothari
(Design Ch 33.000 Km To Ch. 90.000 Km) (Length = 57.00 Kms) to Two Lanes With Paved Shoulder
of NH 161 A (Starting From NH 548 C Aakot And Terminate At Junction Of NH 161 Near
WazarAurada) in the State of Maharashtra on EPC Mode. Project Cost 308 Cr
.
From-FROM MARCH 2017 to Feb 2019
Worked With M/S SHREE HARI ASSOCIATES , Aurangabad
Responsibilities:
Execution of Earth work, GSB, DLC, PQC as per plan and profile.
Making DPR and informing Head office for day today activity and resource and construction material
requirement as per schedule program to achieve target.
2-construction of two lane with paved shoulder under PWD from karad- Patan-koyan
including cross drainage work under Maharashtra PWD.
3- Routine maintenance and pot hole feeling with 40 mm BC Under NHAI, PIU Shivpuri.
From Devas to Shivpuri.
2
1- construction 0f six lane project under NHAI from KM – 720 t0 760 NH-4.
2- Mobilization of Project construction of camp, Construction of stationary plant like
Concrete batching plant, 250 TPH Crusher, Appolo Bathmix hot mix Plant.
3- Construction of piling foundation, open foundation, sub structure, prestressed super
structure.
2-construction of Foundation work for Rail cum Road Bridge over River Ganga at Munger
Bihar.
3- Construction of Allahabad bye pass road Project Nh-2 with Rigid pavement and flexible
pavement.
Active participation in co- ordination with Authority, NHAI HQ’S , IE smooth resolutions of issues
periodical review & active involvement ensuring the expenses within planned A
Managing the work progress with team .
Actively involved in implementation of ISO implementation system procedures and External certification
Audit.
Effective Laisoning with revenue / forest and other department for resolution of project hindrance issues
and availing the work fronts for completion of the project within planned schedule.
Effective planning of traffic worthiness of highway during the monsoon despite of resource constraints
Developed project management teams, site infrastructure, utilized material resources, machinery and
trained and competent project construction manpower, reviewed and executed project within targeted
cost and time frame.
mitigation measure; client billing, certification of Sub-Contractor’s bills; site meeting and instruction;
Liaisonning with consultant, client and related Government department.
Guide, supervise, coordinate and monitor work of the experts in his team as well as those of the
Contractor, establishment of site office.
Ensure execution of work at site as per specification and standards, undertake site visits and report on
financial and technical aspects of the project.
Monitoring and execution of works as per planning with quality assurance. Planning, scheduling,
supervision and execution of all types of activities in Highway projects coordinating and monitoring with
Independent consultants.
Participated in the management meeting with Consultant and client to review the work progress.
Providing material resources, required machinery, training, competent project construction manpower
and ensure there availability on the site.
Developing infrastructure at the project si.
.
Personal Information