I. IDENTIFYING INFORMATION
Location: Barangay A
SEMINAR ON WEAVING,
Target Period: From May 28 until 30 (Flexible depending upon the readiness of all proponent)
Amount Requested: Any amount justifiably sufficient and reasonably given generously.
II. RATIONALE
Adhering to the fact that waste management must always be strictly followed, every Barangay, to
preserve the ecology, must undertake every possible step to accomplish this mandate. The constraint on
budgetary allowances must not always be the primordial reason for us to watch the degradation of our
environment; sitting along and doing nothing is a stifling dagger that thwarts leadership ideology.
The problem of garbage has never been given a solution since leadership will always require
immediate action and sensitivity to community relations. Even though the position greatly demands time,
countless effort, and enormous willpower: We move to conserve and provide a better future to our
children for the first time in history.
Garbage is a universal problem. Giving a solution, we must discipline the community first by
providing them information, making them a partner, imposing stiffer responsibilities, regulating the
amount and frequency of usage for plastic, never over- commercializing, and provide an alternative. To
attain this end, we must first educate them in a manner that will catch their attention. A project that is both
responsive and meaningful will stir their consciousness towards our environment in a way that should not
be too whimsical for them to ignore but too important for them to accomplish.
Although there was a Law on Waste Management, garbage segregation has still been an
impossible feat. Our idea of regulating plastic bags is to discourage the citizens from using more plastic
and become benefactors of handmade native products. Through these means, we can provide stable jobs
for our constituents within the Barangay and promote weaving as a natural practice of healing our
environment. Hence, to initiate this noble cause, adequate funding would be necessary.
1
III. PROJECT DESCRIPTION
Our Environmental Consciousness Project will commence on the first day of March until the first week of
May. The programs included in our project are the following:
IV. TIMETABLE
Programs Location
May 28 • Seminar and Workshop on Environmental Barangay Covered Court
Planning
•
May 30 • Public Hearing on proposed Ordinances of Barangay Covered Court
Barangay Poblacion Seminar on Waste
Mangement
V. PROJECT MANAGEMENT
• MANAGEMENT STRUCTURE
1. Class Adviser- the Class Adviser shall be in charge of all programs' overall management and
supervision throughout the whole duration of the Environment Consciousness Project.
2. NSTP 2 students- all students shall assist the teacher on initiating every program mentioned.
Prepared By:
2
NSTP 2 Student