Calculation Purpose

The document summarizes the design steps for treating waste streams from multiple plants in a pyrolysis and combustion chamber (PCC). Solid waste of 300 kg/hr with a calorific value of 1500 kcal/kg and aqueous waste of 108 kg/hr with a calorific value of 5190 kcal/kg will be fed into the PCC. The total heat required is 0.441765405 megakcal/hr which can be met by the heat released from combustion of the wastes. Air requirements for solid waste is 821 kg/hr and for aqueous waste is 1080 kg/hr.

Uploaded by

nps1966
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views31 pages

Calculation Purpose

The document summarizes the design steps for treating waste streams from multiple plants in a pyrolysis and combustion chamber (PCC). Solid waste of 300 kg/hr with a calorific value of 1500 kcal/kg and aqueous waste of 108 kg/hr with a calorific value of 5190 kcal/kg will be fed into the PCC. The total heat required is 0.441765405 megakcal/hr which can be met by the heat released from combustion of the wastes. Air requirements for solid waste is 821 kg/hr and for aqueous waste is 1080 kg/hr.

Uploaded by

nps1966
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 31

Waste Stream Composition Quantity

Plant Source Mol. Molecul Composi


Formula Name ar tion (wt Kg/hr.
Weight %)
C2HF5 R125 120 50% 13
R-134a Vent-1 C2H3F3 R 143a 84 30% 7.8
C2H2F4 R 134a 102 20% 5.2
CHF3 R23 70 13% 2.5
R-32 Vent-1 CH3Cl Methyl Ch 50.5 8% 1.5
CH2F2 R 32 52 79% 15
C2HF4Cl R124 136.5 64% 25
Vent-1 C2F4Cl2 R114 171 22% 8.5
R-125 C2H2F3Cl R133a 118.5 14% 6
C2ClF5 R-115 154.5 100% 5
Vent-2
C2HF5 R-125 120 Traces
CHF3 R23 70 99% 20.6
CH2F2 R 32 52 0.3% 0.07
R-22 Vent-1
C2H3F3 R 143a 84 0.3% 0.07
CHClF2 R-22 86.5 0.3% 0.07
CHF3 R23 70 10.0% 4.1
Fpone Vent-1 CH2F2 R 32 52 25.0% 10.3
CO Carbon M 28 65.0% 26.8
P-3613a Vent-1 CF3CCl3 187.5 100% 150

Total 301.528
Quantity
Total
Kg/hr

26

19

39.5

20.8

41.2

150

302
Waste Stream Compostion Quantity
Sourc Molecul Composi
Plant Comp.
e Mol. Formula Name ar tion (wt Kg/hr.
Weight %)
Residue-
1 124 100% 2.1
C4H6F2O2
P6 C3H4F2O2 110 70% 2.3
Residue- C4H6F2O2 124 25% 0.8
2
HF 20 5% 0.2
P7 Residue-1 C4H5F3O2 142 100% 1.5
 C8H5F3O 174 13% 3.4
Residue-  C8H4F3ClO 209 11% 2.9
1
P28 C8H3F3Cl2O  243 76% 20.0
Residue- C8H5F3O  174 20% 0.9
2  C16H8F6O3 362 80% 3.7
C6H7F3O2 168 50% 3.1
Residue-1
C10H8F6O3 290 50% 3.1
P34
C13H16F3O4N1 307 50% 21.4
Residue-2
C8H10 106 50% 21.4
C7H3F4Br 243 30% 3.8

SS-02 Residue- C7H4F4 164 5% 0.6


1 C7H3F4Br 243 5% 0.6
C7H2F4Br2 322 60% 7.5
C4H6N2S3 178 6% 0.6
SS-41 Residue- C4H3F3N2S2 200 42% 3.8
1
C3H4N2S3 164 52% 4.7

Total 108.3
Quantity
Total
Kg/hr

2.1

3.3

1.5

26.3

4.6

6.1

42.8

12.5

9.1

108
Carbon Hydrogen Fluorine Oxygen

1 SUB MERGED GASEOUS 55.19662 2.225122 129.493 15.30286

2 SUB MERGED LIQUID WASTE 54.68826 4.447315 21.2391 9.736916

109.885 6.67244 150.732 25.0398


A 18.30734 0.738017 42.94959 5.075575

B 50.49701 4.106477 19.61136 8.990689

Analysis

Carbon 18.30734 %
Hydrogen 0.738017 %
Nitrogen 0.00 %
Sulphur 0 %
Oxygen 5.075575 % 24.12
%
%

HCV= [35000*C+143000*(H-O/8)+9160*S]/100
LCV= HCV-9*H/100*2460

HCV = 6556 1566 Kcal/kg


NCV = 6392 1527 Kcal/kg
Chlorine Bromine Sulphur Nitrogen

99.28238 0 0 0 301.5 301.5

6.332688 5.163484 4.287463 2.404766 108.3 108.3

105.615 5.16348 4.28746 2.40477


32.92948 0 0 0 100

5.847358 4.76776 3.958876 2.220467 100

Analysis

Carbon 50.49701 %
Hydrogen 4.106477 %
Nitrogen 2.22 %
Sulphur 3.958876 %
Oxygen 8.990689 % 69.77
%
%

HCV= [35000*C+143000*(H-O/8)+9160*S]/100
LCV= HCV-9*H/100*2460

HCV = 22302 5326 Kcal/kg


NCV = 21393 5109 Kcal/kg
Date: 5/11/2019
DESIGN STEPS

TOTAL TYPES OF WASTES :

P.C.C

VENT GAS

Mass to be fed in to the PCC = 300 kg/hr

Calorific value :

HCV= [35000*C+143000*(H-O/8)+9160*S]/100
LCV= HCV-9*H/100*2460

Waste composition : % Kg/hr


Organic 100 300
Moisture 0 0
Inorganics 0 0
300

Calorific Value 1500 kcal/kg

temperature T2 1100 °C

T1 30 °C

A/W Ratio 2.03 1.35


Consider (37% excess air) 2.74

Combustion air reqiured 821 kg/hr


D.G 805 kg/hr
Moist (Say 2 %) 16 kg/hr

Heat required for waste =


1 by organics m*0.6*(T2-T1)
195810.00 kcal/hr

2 by inorganics m*0.3*(T2-T1)
0.00 kcal/hr

3 by moisture m*{70+540+0.5(T2-100)}
0.00 kcal/hr

4 heat by Combustible air = Air * 0.28 *(T2-T1)


245955.41 kcal/hr

TOTAL HEAT REQUIRED = 1+2+3+4= 441765 kcal/hr


0.441765405 MKcal/hr

Heat Released by Organics = 450000 kcal/hr

AQUEOUS WASTE :

Total Mass flowrate = 108 Kg/hr

Mass flowrate to PCC = 108 Kg/hr

Waste composition : % Kg/hr


Organic 100 108
Moisture 0 0
Inorganics 0 0
108

Calorific Value = 5190 kcal/kg

A/W (50% extra) 7.01 10.00 1.43


Air Required = 1080 kg/hr 0
D.G.= 1058 kg/hr
Moist.= 22 kg/hr

Temperature T1 30 °C

T2 1100 °C
Heat and Mass Balance :
Heat absorbed by Aqueous waste =
1 by organics m*[0.6*(150-T1)+160+0.3(T2-150)]
55836 kcal/hr

2 by inorganics m*0.3*(T2-T1)
0 kcal/hr

3 by moisture m*{70+540+0.5*(T2-100)}
0 kcal/hr

4 heat by Combustible Air *0.28*(T2-T1)


air 323568 kcal/hr

Heat absorded by Aqueous waste = 379404 kcal/hr

Heat released by Aqueous waste = 560520 kcal/hr


Assume 0 kcal/hr

Total Heat absorbed in PCC = 821169 Kcal/Hr

Total Heat absorbed = 821169 Kcal/hr

Total Heat released in PCC = 1010520 Kcal/hr

Total Heat released (5% Radiation loss) = 959994 Kcal/hr

Net heat Available (Released - Absorbed) = 138825 kcal/hr

Fuel Required (F.O.) = CV = 9650 -30.47 Kg /hr , A/F = 13.04


-30 kg/hr 17.00
1.30
Combustion Air Required = -518 kg/hr
D.G. -508 kg/hr
Moist -10 kg/hr

Cooling Air Required = 463 kg/hr 17.00


#DIV/0!
Cooling Air Required = 463 kg/hr
D.G. 454 kg/hr
Moist 9 kg/hr

Cooling Water Required = 125 kg/kr

Mass out With Cooling Air = 2753 D.G = 2725


Moist = 28

Thermal capacity of Chamber = 0.8836 Mkcal/hr 0.9084


Mkcal/hr

Mass out With Water Cooling =

Mass out = 2424 D.G = 2271


Moist = 153

Thermal capacity of Chamber = 0.7780 Mkcal/hr 0.7998


Mkcal/hr

Volume in chamber

Inlet Temp 1100 C


D.G. 2271 kg/hr
141 kg/kr
Moist 0 kg/hr

406.4
EVAPORATIVE COOLER

Total Gas = 2424 kg/hr


Dry gas 2271 kg/hr
moisture 153 kg/hr ENTHALPY in kcal/kg
TEMP air MOIST
inlet temp 1100 °C 75 17.73 626.8
outlet temp 30 °C 100 23.765 640.228
200 48.14 692.9
Enthalpy @ t1 900 °C 250 60.525 719.34
D.G 290.02 Kcal/hr 300 73.048 746.11
MOIST 1153.17 Kcal/hr 400 98.4268 800.9361
600 151.4507 916.5375
Enthalpy @ t2 30 °C 700 178.6064 960.0029
D.G 54.33 Kcal/hr 800 206.0226 991.2487
MOIST 706.12 Kcal/hr 900 233.7183 1022.492
1000 261.7603 1086.95
Amount of Water Evaporated 893 Kg/hr 1100 290.0246 1153.168
10% Total Dissloved Salts 89 Kg/hr 1150 304.5091 1187.163
1200 318.9124 1221.185
1155 982
VENTURI SCRUBBER 115 HUMIDITY
1039
Total = 3463 kg/hr TEMP HUMIDITY kgmoist/kg gas
Dry gas 2271 kg/hr 15 0.0106
moisture 1192 kg/hr 70 0.2782
75 0.3851
inlet temp T1 30 C 80 0.5511
outlet temp T2 75 C 85 0.8352
90 1.414
enthalpy @ t1 30 C 95 3.173
D.G 54.33 Kcal/hr 99 18.73
MOIST 706.12 Kcal/hr 30 0.0273
60 0.153
enthalpy @ t2 75 C 65 0.2051
D.G 17.73 Kcal/hr
MOIST 626.8 Kcal/hr

Water Evaporated 298 kg/hr


-90
@ venturi outlet

average mol. Wt. 23.35 kg


-128.71
density of gas@ 0.818 kg/m³
outlet temp 0.0510 lb/ft³

Vol flow rate 4600 m³/hr 1.27764 m³/sec


162412 ft³/hr

Velocity of gas @ throat 70 m/s assumed


229.66 ft/s

c/s area of throat 0.0183 m² For v = 65 Dia = 355


0.1965 ft² for v = 75 Dia = 330

diameter 0.1524 m
length 0.4572 m

Pr. Drop 250 mm WC assume


9.843 inch WC

L 9.4474 gal/1000ft³gas

Water circulated 1534.37 gal/hr


5.808 M³/hr Extra 20% = 7.0 M³/hr
26 m3/hr
@ venturi Outlet 3761 kg/hr
Dry gas 2271 kg/hr 23.3481
moisture 1490 kg/hr 0.8176 4599.50

Moisture Holding Capacity @ 75 C 875 kg/Kg of moist, as the humidity @ 75°C 0.3851
For the Dry Air kg moist/Kg DG

Amount of water being condensed = 615 kg/hr

NO CONDENSATION OCCURS

Mass out 3145 kg/hr


Dry gas out 2271 kg/hr 72.20%
moisture out 875 kg/hr 27.80%

I D FAN

Inlet Temp 75 C
D.G. 2271 kg/hr
Moist 875 kg/hr
Total 3145 kg/hr

Mol Wt 24.79 kg

Density 0.868 kg/m³

Vol Flow 3624 m³/hr

30% Extra 4711 m³/hr


4711 m³/hr
Power Required for this System

Assume Pr.drop = 1200 mm of water column; Efficiency 0.65

Power = 32.21 HP OR 24 KW

Taking 20% loss = 39 HP 29 KW


kgmoist/kg gas

mm
mm
kg moist/Kg DG
Total mass = 2424 Kg/hr @ 1100 deg C
Dry gas = 2271 Kg/hr
Moist = 153 Kg/hr

Avg Mole wt.= 27.92 kg

Gas Density.= 0.2478 kg/m3

Vol.flow rate.= 9779 m3/hr

Thermal capacity of MCC = = 0.7998 Mkcal/hr.


799806.12 kcal/hr

FOR CIRCULAR CHAMBER

Assume: Thermal intensity of Combustion chamber = 100000 kcal/hrm3

Volume of chamber = Thermal capacity/Thermal intensity

= 8.00 m3 = ∏* r2 * h

Dimension: Radius = 0.683 m

Diameter = 1.365 m 2850 mm

Length (L/ D) = 4 5.462 m Actual volume =

And the above dimensiones are can be corss checked for the sufficient
residence time (Minimum 2 sec) in the chamber

Residence time Rt = 2.94 (ok,as the Rt more than 2 sec.)

Fuel: ( F.O.) 3.5 % sulphur

Fuel Reqirement for startup ( to rise to 850 deg C) the MCC

Fuel is needed per m2 of chamber to raise to 850 deg C = 1.5

RK inside surface area = 26.36 m2

Therefore, fuel needed = 39.54 Litre


Dimension: Radius = 0.750 m

Diameter = 1.500 m 2850

7.993 m³ Length (L/ D) = 3 4.500 m Actual volume =

And the above dimensiones are can be corss checked for the sufficient
residence time (Minimum 2 sec) in the chamber

Residence time Rt = 2.93 (ok,as the Rt more than 2 sec.)

lpm2
mm

Actual volume = 7.948 m³


73.55 Kpa
61.29 kpa

9.8 kpa
49.03 kpa

H + Cl ---------->
1 35.5

HCl + NaOH ---------->


36.5 40

1 1.096

Feed Rate = 0

Cl generated after decomposition =

Therefore, HCl generated = 108.59

CAUSTIC SCRUBBING FOR HBr

H + Br ---------->
1 79.9

HCl + NaOH ---------->


79.9 40

1 0.501

Feed Rate = 0

Br generated after decomposition =

Therefore, HBr generated = 5.23

CAUSTIC SCRUBBING FOR HF

H + F ---------->
1 19

HF + NaOH ---------->
20 40

1 2.000
Feed Rate = 0

F generated after decomposition =

Therefore, HF generated = 158.67

HCl 108.59
HBr 5.23
HF 158.67
HCl
36.5

NaCl + H2O
58.5 18

1.603 0.493

Kg/Hr

105.62 Kg/Hr

kg/hr

HBr
80.9

NaBr + H2O
102.9 18

1.288 0.225

Kg/Hr

5.16 Kg/Hr

kg/hr

HF
20

NaF + H2O
43 18

2.150 0.900
Kg/Hr

150.73 Kg/Hr

kg/hr
BLOWER :1

0.25 barg 2600 Nm^3/hr

BLOWER :2

0.98 barg 1.25 barg 2600 Nm^3/hr


ACID SCRUBBING

Fuel consumed for start up 157.61 lit/hr

Fuel Consumed kg/hr (max either of fuel used for start up Or Continuous)

Sulphur (assumed) = 3.5 % 40 FROM FLUE

Therefore total Sulphur content = 45.52 kg/hr max Sulphur is considered.

S + O2 ------------> SO2
32 32 64 kg/hr

SO2 generated == 91.03 kg/hr

O2 required == 45.52 kg/hr

Air required == 216.74 kg/hr

CAUSTIC SCRUBBING FOR SO2

SO2 + 0.5 O2 + 2NaOH ----------> Na2SO4 +


64 80 142

NaOH required 113.79 kg/hr

Salt formation 227.58 kg/hr

CAUSTIC SCRUBBING FOR HCl

CH3Cl + 1.5 O2 ----------> CO2 + H2O + Cl


50.5 48 44 18 35.5

1 0.950 0.871 0.356 0.703

H + Cl ----------> HCl
1 35.5 36.5

HCl + NaOH ----------> NaCl + H2O


36.5 40 58.5 18

1 1.096 1.603 0.493

Feed Rate = 0 Kg/Hr

Cl generated after decomposition = 504.00 Kg/Hr

Therefore, HCl generated = 97.73 kg/hr


NaOH required 107.10 kg/hr

Salt formation 156.64 kg/hr

CAUSTIC SCRUBBING FOR HBr

H + Br ----------> HBr
1 79.9 80.9

HCl + NaOH ----------> NaBr + H2O


79.9 40 102.9 18

1 0.501 1.288 0.225

Feed Rate = 0 Kg/Hr

Br generated after decomposition = 40.00 Kg/Hr

Therefore, HBr generated = 4.71 kg/hr

NaOH required 2.36 kg/hr

Salt formation 6.06 kg/hr

CAUSTIC SCRUBBING FOR HF

H + F ----------> HF
1 19 20

HF + NaOH ----------> NaF + H2O


20 40 43 18

1 2.000 2.150 0.900

Feed Rate = 40 Kg/Hr

F generated after decomposition = 40.00 Kg/Hr

Therefore, HF generated = 14.28 kg/hr

NaOH required 28.56 kg/hr

Salt formation 30.70 kg/hr

Total NaOH req 251.81 kg/hr Caustic lye


Total Salt formation 420.98 kg/hr

To maintain a TDS level ( 10 % )

10% = 4209.81 kg/hr

Water is to be recirculated = 28561 kg/hr 27


(for Packed Bed)

Total mass to be circulated = 29191 kg/hr


(Caustic + Water)

So the Conc of caustic in RC Tank = 1.44218 % per hr

Conc of caustic in RC Tank = 28.844 % 20 hrs per day

Bleed off of RC Tank = 0.693 Days


p Or Continuous)

FROM FLUE

max Sulphur is considered.

H2O
18
629.52 40%
kg/hr
m3/hr

20 hrs per day

You might also like