0% found this document useful (0 votes)
106 views5 pages

HEAT STRESS CAMPAIGN PHOTOS-June - 2021

The document describes photos from a heat stress awareness campaign conducted at a construction site. Various measures were implemented such as displaying banners and posters, conducting toolbox talks and briefings, measuring the thermal work limit, providing cold drinking water and rest areas, installing chillers and ice machines, and conducting health checks for workers. The goal was to raise awareness of heat stress risks among workers and provide resources to prevent illnesses.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
106 views5 pages

HEAT STRESS CAMPAIGN PHOTOS-June - 2021

The document describes photos from a heat stress awareness campaign conducted at a construction site. Various measures were implemented such as displaying banners and posters, conducting toolbox talks and briefings, measuring the thermal work limit, providing cold drinking water and rest areas, installing chillers and ice machines, and conducting health checks for workers. The goal was to raise awareness of heat stress risks among workers and provide resources to prevent illnesses.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

SBD PHASE 5 - HEAT STRESS CAMPAIGN PHOTOS

Heat Stress Campaign Banners and Posters Heat Stress Campaign Mass Toolbox talks
displayed at prominent location at site conducted to raise awareness among operatives

Heat Stress Campaign Mass Toolbox talks Heat Stress Campaign briefing conducted for all
conducted to raise awareness among operatives supervisors

Heat Stress awareness campaign for workshop Heat Stress awarenss briefing for the workshop
team team
SBD PHASE 5 - HEAT STRESS CAMPAIGN PHOTOS
Onsite Heat Stress awareness session and ORS Onsite Heat Stresss briefing conducted for NDM
distribution to Storm water operative crew

Heat stress awarenss brieifing conducted for Heat stress awarenss brieifing conducted for
Precast and Steelfixing team Precast and Steelfixing team

Heat Stress Awareness Posters displayed at Heat Stress Awareness Posters displayed at
varios location at site – Rest area varios location at site – Workshop
SBD PHASE 5 - HEAT STRESS CAMPAIGN PHOTOS
Heat Stress Awareness Posters displayed at Heat Stress Awareness Posters displayed at
varios location at site – Zone 71 varios location at site – NDM Pit# MH76

Thermal Work Limit (TWL) measuring Thermal Work Limit (TWL) is being
devices available with HSE team monitored by HSE team periodically

Thermal Work Limit (TWL) is being Flag system implemented and flag post are
monitored and communicated to all installed at various location of the project
employees by HSE team periodically
SBD PHASE 5 - HEAT STRESS CAMPAIGN PHOTOS
Chiller installed for the distribution of cold water Ice machines installed for ice making
to operatives

Cold drninking waterdistributed and replinished Driniking water station installed at rest area Zone
by using deidcated full time pickup 71

ORS provided to all foremen on daily basis and it Personal drinking water bottles (1 liter) has been
has been distributed to all operatives provided to all employees
SBD PHASE 5 - HEAT STRESS CAMPAIGN PHOTOS
Rest area provided for Supervisors, Operators, Cold recovery room provided for employee at
Drivers and Subcon employees to stay during site
mid-day break, remaining all transported to camp

Cold recovery room provided for employee at Temporary rest shelter provided with water
site theromos at various location at site

First aid clinic with full time male nurse available Summer health survilliance checks conducted
at site to respond to any heat related illnesses for high risk groups

You might also like