Fort Collins Utilities’ Home Efficiency Program

Field Checklist for Certification Approval: Window Installation Specialist

Contractor Name Company Name

Date Initials* Skill


Window U-Value and SHGC

Windows meet ENERGY STAR standards for northern climate:


° U-factor of < 0.31 with any SHGC, or
° U-factor of 0.31 with SHGC of > 0.34, or
° U-factor of 0.32 with SHGC of > 0.39

Verify that the old windows meet the existing conditions criteria. Verified by mentor during mentoring, for
future Q/C will be verified by auditor. (Reference Chapter 15 and 16 AAMA Installation Master’s Guide)
Windows meet AAMA design standards for water and air infiltration (Reference Chapter 15 of the AAMA
Installation Master’s Guide)
Full-Frame Installation

Installation to be done in compliance with manufacturer’s warranty standards. MUST show field mentor
the standards from window manufacturer for credit on this item.

Must insulate and air seal the window to the opening with either
1) low-expansive foam or
2) backer-rod plus caulk
Must flash the exterior of the window, meeting AAMA Chapter 15 standards, with at least 3 ½ ” flashing
tape
Must insulate weight pockets: You can use one of two products:
Cellulose or Foam
“Insert” Installation

Must insulate and air seal between old window frame and the surrounding structural framing. (See
Program Installation Standards document for details).

Must insulate and air seal the new window to the old window frame with either
1) low-expansive foam or
2) backer-rod plus caulk
If masonry wall: best practice is to install metal or wood buck using threaded masonry fasteners to allow
for Full Frame Installations instead of Block-Frame installations. This is to be done unless the buck
prevents egress compliance
Wall Insulation

Confirm walls are insulated.

When wall needs insulation, communicate with the homeowner, insulation contractor and/or auditor about
having wall insulation installed prior to completion of window installation.
*Initials indicate the Mentor is verifying that the item has been acceptably done WITHOUT the contractor needing help from the Mentor.

Final Certification- Mentor Signature: _____________________________________ Date: ________________