0% found this document useful (0 votes)
89 views3 pages

External Document Master List

This document lists various external documents received and categorized into the following sections: 1) Industrial Standards, 2) Manuals and Equipment Brochures, 3) Material Safety Data Sheets, 4) Client Drawings and Specifications, and 5) Client Procedures. It provides details such as document name, revision, manufacturer, and receipt date for tracking purposes.

Uploaded by

Tessy Yanti
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
89 views3 pages

External Document Master List

This document lists various external documents received and categorized into the following sections: 1) Industrial Standards, 2) Manuals and Equipment Brochures, 3) Material Safety Data Sheets, 4) Client Drawings and Specifications, and 5) Client Procedures. It provides details such as document name, revision, manufacturer, and receipt date for tracking purposes.

Uploaded by

Tessy Yanti
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

EXTERNAL DOCUMENT MASTER LIST

I. Category : Industrial Standard

Doc. Received
No. Document Name Revision Remarks
Code Date
EXT-IS-
1. API 6A; Annex M 20
001
01
EXT-IS-
2. ANSI/API Specification 6A 19 February
002
2005
Copied on
EXT-IS-
3. ASME B31.3 (for Piping) Th 2004 30 April
003
2012
Kept on
EXT-IS- soft copy
4 AWS D1.1 Th 2006
004 by
Amrinsyah
Copied on
EXT-IS- ASME B31.3 Section 7
5 Th 2007 30 April
005 (for Turbular)
2012
International Standard Quality
EXT-IS- ISO 02 August
6 Management Systems
006 9001:2008 2012
Requirements

II. Category : Manual Book Equipment & Product Brochure

No. Equipment Name Document Name Manufacture Name


SONDPROOF DIESEL
1 Power Generator DENYO
GENERATING SETS
Model : F-100/F-200/F-300 ITO KOKI
2 F Rizer
(INSTRUCTION MANUAL)
3 Temperature Calibrator CA12E HANDY CAL YOKOGAWA
INSTRUCTION MANUAL STORK
THERMOCOUPLE
FOR THE
4 ATTACHMENT UNIT
THERMOCOUPLE
(TAU)
ATTACHMENT UNIT
INSTRUCTIONS EH
SERIES ( DOTTING TYPE CHINO
5 Temperature Recorder
RECORDERS /
RECORDING ALARMS
OPERATIONAL MANUAL JEMIX CO.,LTD.
DIGITAL PROGRAM
6 OF DIGITAL PROGRAM
SETTER
SETTER Model C-7002
7 PORTABLE POWER OPERATOR’S MANUAL JEMIX HEAT TREATMENT
REGULATOR JEMISTAR Model: C4142-E (S) PTE LTD
[ Portable Type PWHT
Page 1 of 3
EXTERNAL DOCUMENT MASTER LIST
Equipment ]

III. Category : Material Safety Data Sheet (MSDS)

Received
No. Chemical Name Trade Name Supplier / Vendor
Date
CSK Insulation
1 ISOWOOL Blanket Isowool 1260 Blanket 23 April 2012
Engineering
Liquide Petroleum Liquide Petroleum Gas Batama Indah
2 January 2011
Gas (LPG) Gemilang
CSK Insulation
3 Kaowool SC Bulk 1260 16 May 2012
Engineering
Never-Seez Regular Regular Grade Anti-
Barelang Prima
4 Grade Compound Seize & Lubricating 10 July 2012
Sukses
Series Compound

IV. Category : Client Drawing & Specification

Received
No. Document Name Company name Remarks
Date
1 Drawing localize PWHT PT.Dwi Sumber Arca Waja 2-May-2012

2 Drawing the new PT.Profab Indonesia 9-May-2012


contingency stinger
segment#1
3 PWHT Specification PT.Profab Indonesia 9-May-2012
4 Drawing PT.Profab Indonesia 9-May-2012
Thermocouples
Location MAP
5 Drawing Hai Thach STL PT.Profab Indonesia 10-May-2012
6 Welding Procedure PT.Profab Indonesia 21-May-2012
Specification
7 Drawing Weld and NDE PT.Profab Indonesia 21-May-2012
MAP
8 Drawing Outer Column PT.Citra Tubindo Engineering 23-May-2012
Construction Details
9 Drawing Collumn PT.Cladtek 25-May-2012
Assembly-Fixed
10 Heat Treatment PT.Transalindo Eka Persada 19-June-2012
Instructions
11 Drawing Ado PT.Transalindo Eka Persada 19-June-2012
northindication and
change support plate
orientation

Page 2 of 3
EXTERNAL DOCUMENT MASTER LIST
12 Specification Post Weld PT.Synco Synergy 11-May-2012
Heat Treatment
13 Specification PQR test PT.Synco Synergy 11-May-2012
piece for PWHT
Purpose
14 Specification PWHT PT.Cameron 18-May-2012
Procedure
15 Specification Collect PT.Cameron 29-May-2012
below parts for PWHT
16 Specification below are PT.Cameron 4-June-2012
WO’s number
17 Specification collect 2 PT.Cameron 6-June-2012
pallet part to be PWHT
18 Specification local PT.Cameron 12-June-2012
PWHT for below WO’s
19 Specification Collect PT.Cameron 14-June-2012
below matls
20 Specification Post Weld PT.Cameron 15-June-2012
Heat Treatment
21 Drawing Mat GRYPHON ENERGY 21-June-2012
modification in way of
leg

V. Category : Client Procedure

Received
No. Document Name Company name Remarks
Date
1 Heat Treatment PT.Profab Indonesia 10-May-2012
Procedure(furnace)-swivel
pad eye(55mm plate)
2 Preheat and Interpass PT.Profab Indonesia 21-May-2012
Temperature Procedure
3 Equipment Calibration PT.Best Standards 21-May-2012
Traceability Technologi
4 Stress Relieve Heat PT.Citra Tubindo 23-May-2012
Treatment for Pin Hole Engineering

Page 3 of 3