Presentation To White Flint Advisory Group: August 28, 2008
Presentation To White Flint Advisory Group: August 28, 2008
M-NCPPC
Vision: North Bethesda’s Urban Center
Pedestrian Scale Street
Grid
Mobility Options
Urban Form
Green
Public Amenities
Infrastructure Staging
Issues
Schools
Transportation
Overall Development
Staging
Program
Schools
High School-
Walter Johnson High School
Middle Schools-
North Bethesda Middle
Tilden Middle
Elementary Schools-
Ashburton
Farmland
Garrett Park
Kensington-Parkwood
Luxmanor
Wyngate
WJ School Cluster
Schools
Potential locations:
The Gables
Site Options
Schools
Site Options
Mobility
Walkable blocks
Hierarchy of forms
Roadway Network
Mobility
Bikeway Network
Mobility
Feasibility
Costs
MARC Locations
Mobility
Flexibility for:
- Public / private coordination
- Implementation and staging
Transit Services
Mobility
Land use /transportation balance
Management of expectations
Regional connections
Regional connections
Regional connections
Regional connections
Regional connections
Regional connections
Residential
Square Feet 2.7M 2.6 M 11.7 M* 17 M
Housing and
Agricultural Benefits
Public Benefits
Level of Development
1992 Plan Proposed
White Flint Existing Likely August
Built-Out Recommendation
Mid-Pike Plaza
Maple Avenue
Metro West
Metro East
NRC
White Flint Crossing
White Flint Mall
Nebel Corridor
Nicholson Court
Development Framework
July 22, 2008 Presentation
300’
250’
150’
65’
35’
Heights
Design Guidelines
Parts of a Building:
Typical Height per
Story:
Tower
Retail: 14-20 feet
Office: 12 feet
Heights
Design Guidelines
Comparison of Heights
Nuclear Regulatory Commission
240 Feet
Height Examples
Rockwall Office Building
97 Feet
12’
12’
12’
12’
12’
12’
12’
12’
Height Examples
The Grand
228 Feet
Height Examples
Bethesda North Conference Center and Hotel
120–130 Feet
9’
9’
9’
9’
9’
9’
9’
9’
9’
9’
9’
20’
Height Examples
Bethesda Row
65 Feet
12’
12’
12’
12’
17’
Height Examples
Silver Spring-Cameron Hills
27- 35 Feet
4.5’
9’
9’
4.5
Height Examples
Design Guidelines
Tower
Steps
Cube
FAR 4 =
Paved or Planted
Private Development
Public Realm
hierarchy
M
civic green
M
green and business streets
Net
Gross
10% 20%
Standard Optional
The Lot Dedication Public Use Space
M
M
Today Concept
Example
Conference Center Area
240’
Building Height,
Step Backs and
Setbacks M
M
M
M
300’
250’
150’
Conference Center Area
M M
M M
Intensity
3 4 Perviousness
Open Space
Underground
Parking Envelope
8/26/2008
Perviousness OK Better Best
Compare
No Assembly Scenario
Summary
Promenade
Great Grid
Connected
Sustainability
Use a diversity of native vegetation to establish community character and
sense of place
Tree Canopy
Sustainability
Provide a connected multi-functional green space system. Each space
should be purposed with at least two of the following:
Recreation: Active or Transportation: Attractive
Passive and safe walking and biking
lanes
Environmental:
Stormwater infiltration Cultural: Public art or
Historic reference
Pervious surface
Sustainability
Green buildings should emphasize:
Bicycle storage Efficient energy
and systems and
shower facilities renewable
energy sources
Green roofs,
green walls, and
water
Recycled
conservation
materials from
existing
building
deconstruction
Carbon Emissions
Public Facilities
Urban Parks and Open Spaces
Civic Green
Express/Urban Library
Police Sub-station
Farmer’s Market
Elementary School
Proposed
Implementation
Pre-Requisites for Stage 1
Staging of Development
Implementation
Stage 1
Metro West and Mid-Pike Districts
Level of Development
3,200 residential dwelling units
1.77 million sq.ft of non-residential
Requirements
Fund the realignment of Executive Blvd
and Old Georgetown Road
Fund the east-west Main Street
Establish a bus circulator system
Fund the acquisition/dedication/
building of Civic Green
TMD goal of 30% non-automotive drive share
Public-private partnership to redevelop Wall Park
Locate an express/urban library
Pre-planning for Rockville Boulevard with SHA
Staging of Development
Implementation
Stage 2
Metro East, Maple Avenue and NRC Districts
Level of Development
2,600 residential dwelling units
1.6 million sq.ft of non-residential
Requirements
Increase non-automotive drive share to 35%
MCPS to evaluate the status of an
elementary school
Fund the second entrance to the Metro Station
Staging of Development
Implementation
Stage 3
Nebel, Nicholson, White Flint Mall and
White Flint Crossing Districts
Level of Development
4,000 residential dwelling units
2.30 million sq.ft of non-residential
Requirements
Increase non-automotive drive share to 39%
Implement MARC station
Complete all streetscape improvements
Construct an elementary school, if needed
Reconstruction of Rockville Pike
Staging of Development
Implementation
Transit Mixed Use Zone
A Euclidean zone
Minimum density: .25-FAR. 5 FAR (standard method)
Maximum Density: 4 FAR (optional method)
Zoning
Next Steps
Schedule