Work Project Template
Work Project Template
Please download the Deliverable Description mentioned above for additional instructions and
guidance on how to use this template.
Project Title
UNDAF Outcome(s):
Expected CP Outcome(s):
(Those linked to the project and extracted from the
CPAP)
Expected Output(s):
(Those that will result from the project and extracted
from the CPAP)
Implementing Partner:
Responsible Parties:
Brief Description
For projects within a CPAP, the narrative section is limited to this box as it is assumed that more
detailed information shall be found in the approved CPAP. However, additional sections can be inserted
as required within the template.
Key Result Area (Strategic Plan): ______________ Total resources required _________
Total allocated resources: _________
Atlas Award ID: ______________
Regular _________
Other:
Start date: ______________
o Donor _________
End Date ______________
o Donor _________
PAC Meeting Date ______________ o Donor _________
o Government _________
Management Arrangements ______________ Unfunded budget: _________
Agreed by (Implementing
In-kind Contributions
Partner):
Agreed by UNDP:
2
I. ANNUAL WORK PLAN
Year:
Explain the roles and responsibilities of the parties involved in managing the project.
Please refer to the Project Document – Deliverable Description to complete this component of the template.
Use the diagram below for the composition of the Project Board.
Project Board
Project Board
Senior Beneficiary Executive Senior Supplier
Senior Beneficiary Executive Senior Supplier
Project Assurance
Project Assurance
(by Board members or
(by Board
delegated members
to other or
individuals)
delegated to other individuals)
Project Manager Project Support
Project Manager Project Support
Please refer to the Project Document – Deliverable Description to complete this component of the template.
Suggested text to be adapted to project context
In accordance with the programming policies and procedures outlined in the UNDP User Guide, the project will be monitored through
the following:
Annually
Annual Review Report. An Annual Review Report shall be prepared by the Project Manager and shared with the Project
Board and the Outcome Board. As minimum requirement, the Annual Review Report shall consist of the Atlas standard
format for the QPR covering the whole year with updated information for each above element of the QPR as well as a
summary of results achieved against pre-defined annual targets at the output level.
Annual Project Review. Based on the above report, an annual project review shall be conducted during the fourth quarter of
the year or soon after, to assess the performance of the project and appraise the Annual Work Plan (AWP) for the following
year. In the last year, this review will be a final assessment. This review is driven by the Project Board and may involve other
stakeholders as required. It shall focus on the extent to which progress is being made towards outputs, and that these remain
aligned to appropriate outcomes.
In case a project evaluation is required, please indicate the justification and proposed timing for the evaluation. A project evaluation is
required only when mandated by partnership protocols such as GEF. However, a project evaluation may be required due to the
complexity or innovative aspects of the project.
5
Quality Management for Project Activity Results
Replicate the table for each activity result of the AWP to provide information on monitoring actions based on quality criteria. To be
completed during the process “Defining a Project” if the information is available. This table shall be further refined during the process
“Initiating a Project”.
OUTPUT 1:
Activity Result 1 Short title to be used for Atlas Activity ID Start Date:
(Atlas Activity ID) End Date:
Purpose What is the purpose of the activity?
ANNEXES
Risk Analysis: An assessment of risks that may affect the project should be conducted during the formulation. Please refer to the
section “Defining a Project”.
Use the standard Risk Log template
Please refer to the Deliverable Description of the Risk Log for instructions
Agreements: Any additional agreements, such as cost sharing agreements, project cooperation agreements signed with NGOs 1
(where the NGO is designated as the “executing entity”) should be attached.
Terms of Reference: TOR for key project personnel should be developed and attached
Capacity Assessment: Results of capacity assessments of Implementing Partner (including HACT Micro Assessment)
For GEF projects, the agreement with any NGO pre-selected to be the main contractor should
include the rationale for having pre-selected that NGO.
6
7
Project Document Format for non-CPAP Countries or Projects outside a CPAP
Project Title
UNDAF Outcome(s):
Expected CP Outcome(s):
(Those linked to the project and extracted from the CP)
Expected Output(s):
(Those that will result from the project)
Executing Entity:
Implementing Agencies:
Brief Description
Agreed by (Government)
Management Arrangements ______________ In-kind Contributions _________
Agreed by (Executing Entity):
Agreed by (UNDP):
V. SITUATION ANALYSIS
8
VI. STRATEGY
9
VII. RESULTS AND RESOURCES FRAMEWORK
Intended Outcome as stated in the Country Programme Results and Resource Framework:
Assign a number to each outcome in the country programme (1, 2,...).
Outcome indicators as stated in the Country Programme Results and Resources Framework, including baseline and targets:
Specify each output that is planned to help Use this column for more complex List activity results and associated actions needed to Specify parties that have Specify the nature and total
achieve the outcome. projects where an output takes more produce each output or annual output targets. been engaged by the costs of the UNDP inputs
For each output, include a baseline with than one year to produce. Each activity result shall ultimately become an executing entity to carry out needed to produce each output.
associated indicators and targets to facilitate Activity ID in Atlas. these activities
monitoring of change over time. Targets (year 1)
Each output shall ultimately become a -
Project ID in Atlas.
1 Activity Result
- Action
Targets (year 2) Action
Output 1
-
Baseline:
-
Indicators: 2 Activity Result
Action
Action
Output 2 Targets (year 1) 1 Activity Result
Baseline: - Action
Indicators: - Action
Targets (year 2)
-
2 Activity Result
-
Action
Action
VIII. ANNUAL WORK PLAN
Year:
Output 3
Baseline:
Indicators:
Targets:
Related CP outcome:
TOTAL
11
IX. MANAGEMENT ARRANGEMENTS
Explain the roles and responsibilities of the parties involved in managing the project.
Please refer to the Deliverable Description to complete this component of the template.
Use the diagram below for the composition of the Board.
Project Board
Project Board
Senior Beneficiary Executive Senior Supplier
Senior Beneficiary Executive Senior Supplier
Project Assurance
Project Assurance
(by Board members or
(by Board
delegated members
to other or
individuals)
delegated to other individuals)
Project Manager Project Support
Project Manager Project Support
Please refer to the Deliverable Description to complete this component of the template.
Suggested text to be adapted to project context
In accordance with the programming policies and procedures outlined in the UNDP User Guide,
the project will be monitored through the following:
a project Lesson-learned log shall be activated and regularly updated to ensure on-
going learning and adaptation within the organization, and to facilitate the preparation
of the Lessons-learned Report at the end of the project
a Monitoring Schedule Plan shall be activated in Atlas and updated to track key
management actions/events
Annually
Annual Review Report. An Annual Review Report shall be prepared by the Project
Manager and shared with the Project Board and the Outcome Board. As minimum
requirement, the Annual Review Report shall consist of the Atlas standard format for
the QPR covering the whole year with updated information for each above element of
the QPR as well as a summary of results achieved against pre-defined annual targets
at the output level.
Annual Project Review. Based on the above report, an annual project review shall
be conducted during the fourth quarter of the year or soon after, to assess the
performance of the project and appraise the Annual Work Plan (AWP) for the
following year. In the last year, this review will be a final assessment. This review is
driven by the Project Board and may involve other stakeholders as required. It shall
focus on the extent to which progress is being made towards outputs, and that these
remain aligned to appropriate outcomes.
In case a project evaluation is required, please indicate the justification and proposed timing for
the evaluation. A project evaluation is required only when mandated by partnership protocols
such as GEF. However, a project evaluation may be required due to the complexity or
innovative aspects of the project.
13
Quality Management for Project Activity Results
Replicate the table for each activity result of the AWP to provide information on monitoring
actions based on quality criteria. To be completed during the process “Defining a Project” if the
information is available. This table shall be further refined during the process “Initiating a
Project”.
OUTPUT 1:
Activity Result 1 Short title to be used for Atlas Activity ID Start Date:
(Atlas Activity ID) End Date:
Purpose What is the purpose of the activity?
14
XI. LEGAL CONTEXT
XII. ANNEXES
Risk Analysis. Use the standard Risk Log template. Please refer to the Deliverable Description
of the Risk Log for instructions
Agreements. Any additional agreements, such as cost sharing agreements, project cooperation
agreements signed with NGOs2 (where the NGO is designated as the “executing entity”) should
be attached.
Terms of Reference: TOR for key project personnel should be developed and attached
Special Clauses. In case of government cost-sharing through the project which is not within the
CPAP, the following clauses should be included:
9. Ownership of equipment, supplies and other properties financed from the contribution
shall vest in UNDP. Matters relating to the transfer of ownership by UNDP shall be determined in
accordance with the relevant policies and procedures of UNDP.
15
10. The contribution shall be subject exclusively to the internal and external auditing
procedures provided for in the financial regulations, rules and directives of UNDP.”
16