0% found this document useful (0 votes)
894 views2 pages

Nandiphas Projects: Daily Hand Tool Checklist

The document is a daily hand tool checklist used by Nandiphas Projects to inspect tools. It contains a table to record serial numbers and inspection details of tools over multiple dates. The checklist ensures tools are inspected for bluntness, mushrooming, correct handles, safety issues, and wear and tear. Any deviations found during inspections must be recorded on the reverse side with corrective actions.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
894 views2 pages

Nandiphas Projects: Daily Hand Tool Checklist

The document is a daily hand tool checklist used by Nandiphas Projects to inspect tools. It contains a table to record serial numbers and inspection details of tools over multiple dates. The checklist ensures tools are inspected for bluntness, mushrooming, correct handles, safety issues, and wear and tear. Any deviations found during inspections must be recorded on the reverse side with corrective actions.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Document

HTC
Revision Number
DAILY HAND TOOL CHECKLIST 00

NANDIPHAS PROJECTS
Date

HAND TOOL REGISTER NANDIPHAS PROJECTS

Serial
Description Mon Tue Wed Thu Fri Sat Mon Tue Wed Thu Fri Sat Checklist
Number

1. Blunting?
2. Mushrooming heads?
3. Handles correct?
4. Right tool for the job?
5. Correct PPE?
6. Wear and tear?

Note:
Don’t just tick, please write OK or
use the code

Date inspected
Person inspecting initial
Supervisor
I certify that the above have been inspected in accordance with Section 8 of the OHS Act 85, of 1993 and those indicating defects
have been withdrawn from service for repair or replacement.

NB!! ALL DEVIATIONS ARE TO BE RECORDED ON THE REVERSE SIDE.

HANDTOOL REGISTER (RECORD OF DEVIATIONS)


Document
HTC
Revision Number
DAILY HAND TOOL CHECKLIST 00

NANDIPHAS PROJECTS
Date

Description of deviations Complete


Date Actioned by whom Target date
noted Yes No

You might also like