General Project Data Report

General Data
Project Title: Project File Name: SPRINKLER CALC...fiw
Designed By: Date: 11-1-2017
Code Reference: Approving Agency:
Client Name: Phone:
Address: City, State Zip Code:
Company Name: Representative:
Company Address: City And State:
Phone:
Building Name: Building Owner:
Contact at Building: Phone at Building:
Address Of Building: City, State Zip Code:

Project Data
Description Of Hazard: Light Hazard Sprinkler System Type: Wet
Design Area Of Water Application: 1500 ft² Maximum Area Per Sprinkler: 130 ft²
Default Sprinkler K-Factor: 5.60 K Default Pipe Material: SCHED 40 WET STEEL
Inside Hose Stream Allowance: 100.00 gpm Outside Hose Stream Allowance: 0.00 gpm
In Rack Sprinkler Allowance: 0.00 gpm

Sprinkler Specifications
Make: Model:
Size: 0.5 Temperature Rating: 154 F

Water Supply Test Data


Source Of Information:
Test Hydrant ID: Date Of Test:

Hydrant Elevation: 0 ft Static Pressure: 0.00 psi


Test Flow Rate: 0.00 gpm Test Residual Pressure: 0.00 psi
Calculated System Flow Rate: 274.70 gpm Calculated Inflow Residual Pressure: 48.05 psi

Calculation Project Data


Calculation Mode: Demand
HMD Minimum Residual Pressure: 7.00 psi Minimum Desired Flow Density: 0.10 gpm/ft²
Maximum Water Velocity: 20.00 ft/s Maximum Frictional Loss / 100 feet: 0.00 psi
Number Of Active Nodes: 24
Number Of Active Pipes: 23 Number Of Inactive Pipes: 0
Number Of Active Sprinklers: 10 Number Of Inactive Sprinklers: 0

E:\ECG\my first course\last presentation\TEST\fire\TEST1\answer\total work\SPRINKLER CALC...fiw


Wednesday, January 11, 2017, 3:07 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
pReJkEr
Hell Page 3

Fire Sprinkler Input Data

Node Input Data


Sprinkler Pressure Node Elev (ft) Non-Sprinkler
Area Group
Node Node Description KFactor (K) Estimate (psi) Branch Non- Flow (gpm)
Branch Dia.
No. Branch Description Branch Len. Branch Stnd Stnd Fittings Branch Sprk
(in)
(ft) Fittings (ft) KFactor (K)

No Discharge ---- N/A 48.05 0.00 0.00


1
---- 0.000 0.0 ---- 0.0 0.00

Non-Sprinkler ---- N/A 47.96 0.00 100.00


2
---- 0.000 0.0 ---- 0.0 0.00

No Discharge ---- N/A 45.04 6.56 0.00


3
---- 0.000 0.0 ---- 0.0 0.00

No Discharge ---- N/A 44.93 6.56 0.00


4
---- 0.000 0.0 ---- 0.0 0.00

No Discharge ---- N/A 44.56 6.56 0.00


5
---- 0.000 0.0 ---- 0.0 0.00

No Discharge ---- N/A 37.77 21.65 0.00


6
---- 0.000 0.0 ---- 0.0 0.00

No Discharge ---- N/A 33.60 21.65 0.00


7
---- 0.000 0.0 ---- 0.0 0.00

No Discharge ---- N/A 27.91 33.14 0.00


8
---- 0.000 0.0 ---- 0.0 0.00

No Discharge ---- N/A 27.12 33.14 0.00


9
---- 0.000 0.0 ---- 0.0 0.00

No Discharge ---- N/A 19.29 33.14 0.00


10
---- 0.000 0.0 ---- 0.0 0.00

Sprinkler ---- 5.60 13.85 33.14 0.00


11
---- 0.000 0.0 ---- 0.0 0.00

Sprinkler ---- 5.60 11.78 33.14 0.00


12
---- 0.000 0.0 ---- 0.0 0.00

No Discharge ---- N/A 16.06 33.14 0.00


13
---- 0.000 0.0 ---- 0.0 0.00

No Discharge ---- N/A 11.50 33.14 0.00


14
---- 0.000 0.0 ---- 0.0 0.00

Sprinkler ---- 5.60 10.40 33.14 0.00


15
---- 0.000 0.0 ---- 0.0 0.00

Sprinkler ---- 5.60 10.73 33.14 0.00


16
---- 0.000 0.0 ---- 0.0 0.00

E:\ECG\my first course\last presentation\TEST\fire\TEST1\answer\total work\SPRINKLER CALC...fiw


Wednesday, January 11, 2017, 3:07 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
pReJkEr
Hell Page 4

Fire Sprinkler Input Data

Node Input Data (cont'd)


Sprinkler Pressure Node Elev (ft) Non-Sprinkler
Area Group
Node Node Description KFactor (K) Estimate (psi) Branch Non- Flow (gpm)
Branch Dia.
No. Branch Description Branch Len. Branch Stnd Stnd Fittings Branch Sprk
(in)
(ft) Fittings (ft) KFactor (K)
No Discharge ---- N/A 14.55 33.14 0.00
17
---- 0.000 0.0 ---- 0.0 0.00

Sprinkler ---- 5.60 10.39 33.14 0.00


18
---- 0.000 0.0 ---- 0.0 0.00

Sprinkler ---- 5.60 8.81 33.14 0.00


19
---- 0.000 0.0 ---- 0.0 0.00

No Discharge ---- N/A 11.65 33.14 0.00


20
---- 0.000 0.0 ---- 0.0 0.00

Sprinkler ---- 5.60 8.28 33.14 0.00


21
---- 0.000 0.0 ---- 0.0 0.00

Sprinkler ---- 5.60 7.00 33.14 0.00


22
---- 0.000 0.0 ---- 0.0 0.00

Sprinkler ---- 5.60 9.22 33.14 0.00


23
---- 0.000 0.0 ---- 0.0 0.00

Sprinkler ---- 5.60 7.80 33.14 0.00


24
---- 0.000 0.0 ---- 0.0 0.00

E:\ECG\my first course\last presentation\TEST\fire\TEST1\answer\total work\SPRINKLER CALC...fiw


Wednesday, January 11, 2017, 3:07 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
pReJkEr
Hell Page 5

Fire Sprinkler Input Data

Pipe Input Data


Nominal Nominal Fitting Total CFactor
Beg. End. Type Fitting
Pipe Description Diameter Length Length Length (gpm/inc
Node Node Group Data
(inch) (feet) (feet) (feet) h-psi)

1 2 SCHED 40 WET STEEL 6.000 0 E 13.12 14.00 27.12 120

2 3 SCHED 40 WET STEEL 6.000 0 EGC 6.56 49.00 55.56 120

3 4 PVC, CLASS 200 6.000 0 2E 65.62 42.20 107.82 150

4 5 PVC, CLASS 200 4.000 0 E 42.65 15.10 57.75 150

5 6 SCHED 40 WET STEEL 4.000 0 E 14.76 10.00 24.76 120

5E2TG
6 7 SCHED 40 WET STEEL 3.000 0 26.25 82.00 108.25 120
C

7 8 SCHED 40 WET STEEL 3.000 0 E 11.48 7.00 18.48 120

8 9 SCHED 40 WET STEEL 3.000 0 2E 6.56 14.00 20.56 120

9 10 SCHED 40 WET STEEL 2.500 0 ET 52.49 18.00 70.49 120

10 11 SCHED 40 WET STEEL 1.000 0 T 6.56 5.00 11.56 120

11 12 SCHED 40 WET STEEL 1.000 0 E 15.09 2.00 17.09 120

10 13 SCHED 40 WET STEEL 2.000 0 T 9.84 10.00 19.84 120

13 14 SCHED 40 WET STEEL 1.000 0 T 6.56 5.00 11.56 120

14 15 SCHED 40 WET STEEL 1.000 0 E 8.20 2.00 10.20 120

14 16 SCHED 40 WET STEEL 1.000 0 E 4.92 2.00 6.92 120

13 17 SCHED 40 WET STEEL 2.000 0 T 6.56 10.00 16.56 120

17 18 SCHED 40 WET STEEL 1.000 0 T 6.56 5.00 11.56 120

18 19 SCHED 40 WET STEEL 1.000 0 E 15.09 2.00 17.09 120

17 20 SCHED 40 WET STEEL 1.500 0 T 13.12 8.00 21.12 120

20 21 SCHED 40 WET STEEL 1.000 0 T 6.56 5.00 11.56 120

21 22 SCHED 40 WET STEEL 1.000 0 E 15.09 2.00 17.09 120

20 23 SCHED 40 WET STEEL 1.250 0 ET 19.69 9.00 28.68 120

23 24 SCHED 40 WET STEEL 1.000 0 E 15.09 2.00 17.09 120

E:\ECG\my first course\last presentation\TEST\fire\TEST1\answer\total work\SPRINKLER CALC...fiw


Wednesday, January 11, 2017, 3:07 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
pReJkEr
Hell Page 6

Fire Sprinkler Output Data

Overall Node Groupings Output Data


Pipe Segment Pipe Pipe Sprinkler Flow Non-Sprinkler Flow Beg. Node Imbalance
Beg. End. Type Flow Rate At Beg. Node Out (+) In (-) Residual Flow At Beg.
Node Node Group (gpm) (gpm) (gpm) (gpm) Pressure (psi) Node (gpm)

1 2 0 0.00 0.00 0.00 0.00 48.05

2 1 0 0.00 0.00 100.00 0.00 47.96 100.00000


2 3 0 0.00

3 2 0 0.00 0.00 0.00 0.00 45.04


3 4 0 0.00

4 3 0 0.00 0.00 0.00 0.00 44.93


4 5 0 0.00

5 4 0 0.00 0.00 0.00 0.00 44.56


5 6 0 0.00

6 5 0 0.00 0.00 0.00 0.00 37.77


6 7 0 0.00

7 6 0 0.00 0.00 0.00 0.00 33.60


7 8 0 0.00

8 7 0 0.00 0.00 0.00 0.00 27.91


8 9 0 0.00

9 8 0 0.00 0.00 0.00 0.00 27.12


9 10 0 0.00

10 9 0 0.00 0.00 0.00 0.00 19.29


10 11 0 0.00
10 13 0 0.00

11 10 0 0.00 20.84 0.00 0.00 13.85 0.00061


11 12 0 0.00

12 11 0 0.00 19.22 0.00 0.00 11.78 0.00018

13 10 0 0.00 0.00 0.00 0.00 16.06


13 14 0 0.00
13 17 0 0.00

14 13 0 0.00 0.00 0.00 0.00 11.50


14 15 0 0.00
14 16 0 0.00

15 14 0 0.00 18.06 0.00 0.00 10.40 0.00023

16 14 0 0.00 18.34 0.00 0.00 10.73 0.00029

17 13 0 0.00 0.00 0.00 0.00 14.55


17 18 0 0.00
17 20 0 0.00

E:\ECG\my first course\last presentation\TEST\fire\TEST1\answer\total work\SPRINKLER CALC...fiw


Wednesday, January 11, 2017, 3:07 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
pReJkEr
Hell Page 7

Fire Sprinkler Output Data

Overall Node Groupings Output Data (cont'd)


Pipe Segment Pipe Pipe Sprinkler Flow Non-Sprinkler Flow Beg. Node Imbalance
Beg. End. Type Flow Rate At Beg. Node Out (+) In (-) Residual Flow At Beg.
Node Node Group (gpm) (gpm) (gpm) (gpm) Pressure (psi) Node (gpm)

18 17 0 0.00 18.05 0.00 0.00 10.39 0.00038


18 19 0 0.00

19 18 0 0.00 16.62 0.00 0.00 8.81 0.00009

20 17 0 0.00 0.00 0.00 0.00 11.65


20 21 0 0.00
20 23 0 0.00

21 20 0 0.00 16.11 0.00 0.00 8.28 0.00029


21 22 0 0.00

22 21 0 0.00 14.82 0.00 0.00 7.00 0.00000

23 20 0 0.00 17.00 0.00 0.00 9.22 0.00031


23 24 0 0.00

24 23 0 0.00 15.64 0.00 0.00 7.80 0.00007

E:\ECG\my first course\last presentation\TEST\fire\TEST1\answer\total work\SPRINKLER CALC...fiw


Wednesday, January 11, 2017, 3:07 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
pReJkEr
Hell Page 8

Fire Sprinkler Output Data

Overall Pipe Output Data


q (gpm) F. L./ft Pipe-Len.
Beg. Nodal Spk/Hose Residual Nom. Dia. PF-(psi)
Elevation Q (gpm) (psi/ft) Fit-Len.
End. KFactor Discharge Pressure Inside Dia. PE-(psi)
(feet) Velocity Fittings Tot-Len.
Node (K) (gpm) (psi) C-Value PT-(psi)
(fps) Type-Grp (ft)

1 0.00 0.00 0.00 48.05 6.00 0.00 0.00322 13.12 0.087


2 0.00 0.00 100.00 47.96 6.065 274.70 E 14.00 0.000
SCHED 40 WET STEEL 120 3.05 0 27.12 0.087

2 0.00 0.00 100.00 47.96 6.00 0.00 0.00140 6.56 0.078


3 0.00 6.56 0.00 45.04 6.065 174.70 EGC 49.00 2.841
SCHED 40 WET STEEL 120 1.94 0 55.56 2.919

3 0.00 6.56 0.00 45.04 6.00 0.00 0.00098 65.62 0.106


4 0.00 6.56 0.00 44.93 5.993 174.70 2E 42.20 0.000
PVC, CLASS 200 150 1.99 0 107.82 0.106

4 0.00 6.56 0.00 44.93 4.00 0.00 0.00643 42.65 0.371


5 0.00 6.56 0.00 44.56 4.072 174.70 E 15.10 0.000
PVC, CLASS 200 150 4.30 0 57.75 0.371

5 0.00 6.56 0.00 44.56 4.00 0.00 0.01027 14.76 0.254


6 0.00 21.65 0.00 37.77 4.026 174.70 E 10.00 6.535
SCHED 40 WET STEEL 120 4.40 0 24.76 6.789

6 0.00 21.65 0.00 37.77 3.00 0.00 0.03857 26.25 4.175


7 0.00 21.65 0.00 33.60 3.068 174.70 5E2TGC 82.00 0.000
SCHED 40 WET STEEL 120 7.58 0 108.25 4.175

7 0.00 21.65 0.00 33.60 3.00 0.00 0.03857 11.48 0.713


8 0.00 33.14 0.00 27.91 3.068 174.70 E 7.00 4.972
SCHED 40 WET STEEL 120 7.58 0 18.48 5.685

8 0.00 33.14 0.00 27.91 3.00 0.00 0.03857 6.56 0.793


9 0.00 33.14 0.00 27.12 3.068 174.70 2E 14.00 0.000
SCHED 40 WET STEEL 120 7.58 0 20.56 0.793

9 0.00 33.14 0.00 27.12 2.50 0.00 0.11108 52.49 7.830


10 0.00 33.14 0.00 19.29 2.469 174.70 ET 18.00 0.000
SCHED 40 WET STEEL 120 11.71 0 70.49 7.830

10 0.00 33.14 0.00 19.29 1.00 0.00 0.47068 6.56 5.442


11 5.60 33.14 20.84 13.85 1.049 40.06 T 5.00 0.000
SCHED 40 WET STEEL 120 14.87 0 11.56 5.442

10 0.00 33.14 0.00 19.29 2.00 0.00 0.16301 9.84 3.235


13 0.00 33.14 0.00 16.06 2.067 134.64 T 10.00 0.000
SCHED 40 WET STEEL 120 12.87 0 19.84 3.235

11 5.60 33.14 20.84 13.85 1.00 0.00 0.12096 15.09 2.067


12 5.60 33.14 19.22 11.78 1.049 19.22 E 2.00 0.000
SCHED 40 WET STEEL 120 7.14 0 17.09 2.067

E:\ECG\my first course\last presentation\TEST\fire\TEST1\answer\total work\SPRINKLER CALC...fiw


Wednesday, January 11, 2017, 3:07 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
pReJkEr
Hell Page 9

Fire Sprinkler Output Data

Overall Pipe Output Data (cont'd)


q (gpm) F. L./ft Pipe-Len.
Beg. Nodal Spk/Hose Residual Nom. Dia. PF-(psi)
Elevation Q (gpm) (psi/ft) Fit-Len.
End. KFactor Discharge Pressure Inside Dia. PE-(psi)
(feet) Velocity Fittings Tot-Len.
Node (K) (gpm) (psi) C-Value PT-(psi)
(fps) Type-Grp (ft)

13 0.00 33.14 0.00 16.06 1.00 0.00 0.39425 6.56 4.558


14 0.00 33.14 0.00 11.50 1.049 36.40 T 5.00 0.000
SCHED 40 WET STEEL 120 13.51 0 11.56 4.558

13 0.00 33.14 0.00 16.06 2.00 0.00 0.09098 6.56 1.507


17 0.00 33.14 0.00 14.55 2.067 98.24 T 10.00 0.000
SCHED 40 WET STEEL 120 9.39 0 16.56 1.507

14 0.00 33.14 0.00 11.50 1.00 0.00 0.10777 8.20 1.099


15 5.60 33.14 18.06 10.40 1.049 18.06 E 2.00 0.000
SCHED 40 WET STEEL 120 6.70 0 10.20 1.099

14 0.00 33.14 0.00 11.50 1.00 0.00 0.11094 4.92 0.768


16 5.60 33.14 18.34 10.73 1.049 18.34 E 2.00 0.000
SCHED 40 WET STEEL 120 6.81 0 6.92 0.768

17 0.00 33.14 0.00 14.55 1.00 0.00 0.36014 6.56 4.164


18 5.60 33.14 18.05 10.39 1.049 34.66 T 5.00 0.000
SCHED 40 WET STEEL 120 12.87 0 11.56 4.164

17 0.00 33.14 0.00 14.55 1.50 0.00 0.13732 13.12 2.901


20 0.00 33.14 0.00 11.65 1.610 63.57 T 8.00 0.000
SCHED 40 WET STEEL 120 10.02 0 21.12 2.901

18 5.60 33.14 18.05 10.39 1.00 0.00 0.09241 15.09 1.579


19 5.60 33.14 16.62 8.81 1.049 16.62 E 2.00 0.000
SCHED 40 WET STEEL 120 6.17 0 17.09 1.579

20 0.00 33.14 0.00 11.65 1.00 0.00 0.29162 6.56 3.372


21 5.60 33.14 16.11 8.28 1.049 30.93 T 5.00 0.000
SCHED 40 WET STEEL 120 11.48 0 11.56 3.372

20 0.00 33.14 0.00 11.65 1.25 0.00 0.08477 19.69 2.432


23 5.60 33.14 17.00 9.22 1.380 32.65 ET 9.00 0.000
SCHED 40 WET STEEL 120 7.00 0 28.68 2.432

21 5.60 33.14 16.11 8.28 1.00 0.00 0.07473 15.09 1.277


22 5.60 33.14 14.82 7.00 1.049 14.82 E 2.00 0.000
SCHED 40 WET STEEL 120 5.50 0 17.09 1.277

23 5.60 33.14 17.00 9.22 1.00 0.00 0.08265 15.09 1.413


24 5.60 33.14 15.64 7.80 1.049 15.64 E 2.00 0.000
SCHED 40 WET STEEL 120 5.81 0 17.09 1.413

E:\ECG\my first course\last presentation\TEST\fire\TEST1\answer\total work\SPRINKLER CALC...fiw


Wednesday, January 11, 2017, 3:07 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
pReJkEr
Hell Page 10

Fire Sprinkler Output Data

Overall Sprinkler Output Data


Flowing Sprinkler Residual Flowing Sprinkler
Area Group Sprinkler Flowing
Sprinkler Elevation Pressure Density Discharge
Code KFactor (K) Area (ft²)
Node No. (feet) (psi) (gpm/ft²) (gpm)

11 5.60 33.14 13.85 130.00 0.160 20.84


Sub Totals For Non-Group 130.00 0.160 20.84

12 5.60 33.14 11.78 130.00 0.148 19.22


Sub Totals For Non-Group 130.00 0.148 19.22

15 5.60 33.14 10.40 130.00 0.139 18.06


Sub Totals For Non-Group 130.00 0.139 18.06

16 5.60 33.14 10.73 130.00 0.141 18.34


Sub Totals For Non-Group 130.00 0.141 18.34

18 5.60 33.14 10.39 130.00 0.139 18.05


Sub Totals For Non-Group 130.00 0.139 18.05

19 5.60 33.14 8.81 130.00 0.128 16.62


Sub Totals For Non-Group 130.00 0.128 16.62

21 5.60 33.14 8.28 130.00 0.124 16.11


Sub Totals For Non-Group 130.00 0.124 16.11

22 5.60 33.14 7.00 130.00 0.114 14.82


Sub Totals For Non-Group 130.00 0.114 14.82

23 5.60 33.14 9.22 130.00 0.131 17.00


Sub Totals For Non-Group 130.00 0.131 17.00

24 5.60 33.14 7.80 130.00 0.120 15.64


Sub Totals For Non-Group 130.00 0.120 15.64

Totals For All Groups 1300.00 0.134 174.70

E:\ECG\my first course\last presentation\TEST\fire\TEST1\answer\total work\SPRINKLER CALC...fiw


Wednesday, January 11, 2017, 3:07 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
pReJkEr
Hell Page 11

Fire Sprinkler Output Summary

Hydraulically Most Demanding Sprinkler Node


HMD Sprinkler Node Number: 22
HMD Actual Residual Pressure: 7.00 psi
HMD Actual GPM: 14.82 gpm

Sprinkler Summary
Sprinkler System Type: Wet
Specified Area Of Application: 1500.00 ft²
Minimum Desired Density: 0.100 gpm/ft²
Application Average Density: 0.116 gpm/ft²
Application Average Area Per Sprinkler: 150.00 ft²
Sprinkler Flow: 174.70 gpm
Average Sprinkler Flow: 17.47 gpm

Flow Velocity And Imbalance Summary


Maximum Flow Velocity ( In Pipe 0 - 0 ) 0.00 ft/sec
Maximum Velocity Pressure ( In Pipe 0 - 0 ) 0.00 psi

Allowable Maximum Nodal Pressure Imbalance: 0.0100 psi


Actual Maximum Nodal Pressure Imbalance: 0.0072 psi
Actual Average Nodal Pressure Imbalance: 0.0029 psi
Actual Maximum Nodal Flow Imbalance: 100.0000 gpm
Actual Average Nodal Flow Imbalance: 4.1668 gpm

Overall Network Summary


Number Of Unique Pipe Sections: 23
Number Of Flowing Sprinklers: 10

Pipe System Water Volume: 204.63 gal

Sprinkler Flow: 174.70 gpm


Non-Sprinkler Flow: 100.00 gpm

Minimum Required Residual Pressure At System Inflow


48.05 psi
Node:
Demand Flow At System Inflow Node: 274.70 gpm

E:\ECG\my first course\last presentation\TEST\fire\TEST1\answer\total work\SPRINKLER CALC...fiw


Wednesday, January 11, 2017, 3:07 AM
Fire - Fire Sprinkler Hydraulics Calculation Program Elite Software Development, Inc.
pReJkEr
Hell Page 12

Fire Sprinkler Output Data

Hydraulic Supply/Demand Graph

50 48

45

40

35
Pressure psi

30

25

20

15

10

0
1 2 3 4 5 6 7 8 9 10
Flowrate(x100) gpm

Demand Curve Data


Calculated Residual Pressure: 48.05 psi
Calculated Flow Rate: 274.70 gpm
Pressure Required For First Sprinkler Downstream From Inflow Node To Flow: 14.35 psi