Dokumen Prioritas yang akan segera dikirimkan setelah Kick of Meeting :

- General
 Project Design Basis
 Project Execution Plan
 Site Visit Report
 Project Schedule
 Project Coordination and Comunication Procedure
 Document, Equipmet & Piping Numbering Procedure
 Review & Approval Procedure
 Reporting Project Procedure
 Document Control Procedure
 Progress Calculation & Reporting Procedure
 Master Document and Item List Index
 Project Quality Procedure

- Process
 Process Operating, Maintenance, Control & Shutdown Philosophy
 Process & Utility description
 Overpressure Protection, Depressuring, Relief Disposal and Drain Philosophy
 Isolation Philosophy
 Process Simulation Report
 Hydraulic Simulation Report
 Material Selection Report
 Dynamics Simulation Report
 Flare and Vent Sizing
 Depressurize and blowdown study
 Calculation for PSV
 Calculation for Line Sizing
 Calculation for Closed Drain Drum BRA-V-5501
 Calculation for Flare KO Drum BRA-KOD-5601
 Calculation for Production Separator BRA-V-1001
 Calculation for Test Separator BRA-V-1003
 Calculation for Inlet Scrubber BRA-V-2000
 Calculation for HP Gas Scrubber BRA-V-2004
 Calculation for Sales Gas Scrubber BRA-V-4001
 Calculation for Fuel Gas Scrubber BRA-V-5101
 Calculation for for UA/IA Consumption, UA Receiver (BRA-TS-5201) and IA Receiver
(BRA-TS-5202)
 Calculation for Water Well Pump BRA-P-5301A/B
 Calculation for Fire Water Pump
 Calculation for Diesel Distribution Pump BRA-P-5001 A/B
 Calculation for Closed Drain Sump Pump BRA-P-5502
 Calculation for Product Liquid Transfer Pump BRA-P-1001A/B
 Calculation for KO Drum Sump Pump (BRA-P-5602)
 Calculation for Test Liquid Transfer Pump
 Calculation for Raw Water Tank BRA-T-5301
 Calculation for Diesel Storage Tank BRA-T-5001
 Calculation for Production Tank BRA-T-1001A/B
 Calculation for Test Tank BRA-T-1002
 Calculation for Utility Water Pump BRA-P-5302A/B
 Calculation for Fire Water Demand & Water Pond
 Calculation for TEG Dehydration Calculation (include TEG & Glycol Calculation).
 Calculation for Jockey Pump
 Calculation for Closed Drain Pump BRA-P-5501A/B
 Calculation for Flare KO Drum Pumps (BRA-P-5601A/B)
 Calculation for Oily Water Pump BRA-P-5701
 Calculation for Effluent Water Pump BRA-P-5702
 Calculation for Chemical Consumption
 Calculation for Fuel Gas Demand
 Calculation for Utility Consumption (Utility Air, Instrument, Diesel, Service water).
 Heat & Material Ballance
 PFD Separation and Liquid Handling System
 PFD Compression System
 PFD Dehydration and Sales Gas Delivery System
 UFD Diesel Fuel System
 UFD-Fuel Gas and Main Power Generation System
 UFD Utility Plant & Instrument Air System
 UFD Utility Water Treatment System
 UFD Fire Water System
 UFD Flare System
 UFD Close and Open Drain System
 PFD Overall Facility SP Beringin A
 PFD Wellhead SP Beringin A
 Drawing Index
 P&ID - Legend & Symbol Standard
 P&ID - Legend & Symbol Standard
 P&ID - Legend and Symbol Instrument
 P&ID Legend and Symbol Instrument
 P&ID - Legend and Symbol Instrument
 P&ID Production Well #BRG-01, #BRG-34, #BRG-35
 P&ID Production Well #BRG-38, #BRG-10
 P&ID - Production Well #BRG-A5, #BRG-A6, #BRG-H1
 P&ID Production and Test Manifold
 P&ID Production Separator
 P&ID Test Separator
 P&ID Inlet Scrubber
 P&ID HP Gas Scrubber
 P&ID Gas Dehydration System
 P&ID TEG Regeration Package
 P&ID Dehydration System - Sump Drum, TEG Drum and Sump Pump
 P&ID Gas Pig Launcher
 P&ID Gas Pig Receiver at Beringin D
 P&ID Sales Gas Scrubber
 P&ID Production Tank A
 P&ID Production Tank B
 P&ID Test Tank
 P&ID Condensate Loading Pump
 P&ID Pig Launcher
 P&ID Pig Receiver at Beringin D
 P&ID Pipeline SP Beringin C - SP Beringin D
 P&ID Metering Assembly
 P&ID Diesel System
 P&ID Fuel Gas System - Fuel Gas Scrubber
 P&ID Fuel Gas System - Fuel Gas Electric Heater
 P&ID Gas Engine Generator (GEG) Package
 P&ID Diesel Engine Generator (DEG) Package
 P&ID Air Compressor System and Plant Air Receiver
 P&ID Instrument Air Dryer System
 P&ID Instrument Air Receiver
 P&ID Instrument and Utility Air Distribution System
 P&ID Well Water Pump Package and Water Filter
 P&ID Raw Water Tank
 P&ID Service Water System
 P&ID Fire Water System
 P&ID Fire Water Ring Main
 P&ID Foam System
 P&ID Closed Drain System
 P&ID Flare KO Drum
 P&ID Flare Tip
 P&ID Open Drain Header
 P&ID Open Drain System
 P&ID Chemical - Corrosion Injection Pump
 Shutdown Hierarchy
 Line List
- Process Safety
 Safety & Fire Fighting Equipment Specification
 Fire water foam & spray system specification
 HAZOP Study Procedure
 HAZID Study Procedure
 Safety Integrity Level (SIL) Classification & Verification Study Procedure

- Mekanikal
 Centrifugal Pump Specification
 Fire Water Pump Specification
 Flare System Package
 Gas Dehydration Unit Specification
 Diesel Engine Generator Specification
 Gas Engine Generator Specification
 Electric Heater
 RFQ for API Pumps
 RFQ for Non API Pumps
 RFQ For Fire Water Pumps and Jockey pumps
 RFQ for Main Power Generator (Gas Engine Generator)
 RFQ for Emergency Power Generator (Diesel Engine Generator)
 RFQ for TEG Dehydration Package
 RFQ for Gas Fuel Gas System Package (BRA-SPX-5101)
 RFQ Flare System Package

- Piping
 Piping General Design Specification
 Piping Material Specification
 Wall thickness calculation
 Special Item Datasheet
 TBE For Specialy Item
 Plot Plan Drawing SP Beringin A
 Plot Plan SP Beringin D
 Piping GA Keyplan SP beringin A
 Piping Key Plan SP Beringin D
 Piping Tie-in List
 Special Item List
 MTO - Manual Valve and piping bulk material
 Tie In Procedure

- Civil
 Specification for survey topography ( IFC )
 Specification for soil investigation & geoelectricity ( IFC )
 Specification for site preparation & grading ( IFA )
 Survey Topography Procedure ( IFC )
 Soil Investigation & geoelectricity procedure ( IFC )
 Site preparation & Grading procedure (IFA )
 Construction specificationfor site piling works
 Piling work procedure

- Elektrikal
 Load Flow Study
 Short Circuit Study
 Motor Starting Study
 Protection Coordination Study
 Electrical Drawing Index
 Legend & symbol
 Overall one line Diagram
 One line Diagram for UPS
 Electrical Load List Main Equipment Sizing

- Instrument
 Instrument I/O List
 Instrument Power Consumption List
 Instrument Index
 Specification for Actuated On-Off Valve
 Instrument Fire & Gas System Specification
 Telecommunication (in plant) Specification
 Pressure Regulator Specification
 Specification for General Instrument
 Instrument Requirement for Package Equipment Specification
 Specification for Safety Relief Valve
 Specification for Control Valve
 Specification for ICSS
 Specification for Instrument and Telecommunication Cable
 Specification For Instrument Installation
 Specification for Building Fire Alarm System
 Specification for Fire Supression System
 Pressure Regulator Calculation
 Control Valve Calculation
 PSV, Gauge Hatch & PVSV Calculation
 Restriction Orifice & Flow Element Calculation
 Calculation for Thermowell
 Pressure Regulator
 Shutdown Valve (SDV)
 PVSV
 Control Valve
 Pressure Safety Valve
 Fire Suppression System Datasheet
 Restriction Orifice Datasheet
 Alarm Speaker And Strobe Light Datasheet
 Addressable Fire Detection System Datahseet
 Flare Gas Flowmeter (USM) Datasheet
 Fire And Gas Detector Datasheet
 Pressure And Differential Pressure Gauge Datasheet
 Temperature Gauge With Thermowell Datasheet
 Level Gauge Datasheet
 Pressure And Differential Pressure Transmitter Datasheet
 Temperature Transmitter With Thermowell Datasheet
 Displacer Level Transmitter & Switch Datasheet
 Turbine Meter Datasheet
 Orifice Plate And Flange Datasheet
 Rotameter Datasheet
 Radar Type Level Transmitter Datasheet
 Positive Displacement Flowmeter Datasheet
 Water Content (Moisture) Datasheet
 PCS and ESD Cause & Effect Diagram (make separate sheet)
 Fire & Gas Cause and Effect Diagram
 Control & Telecommunication Interface (Split of Scope)
 Overall Cable Block Diagram
 Control and Safety System Architectural Diagram
 Overall Telecommunication Block Diagram
 Typical Instrument Process Hook Up & Installation
 Control Room Layout
 Typical Installation Detail
 Fire And Gas Detector Layout
 Indoor Cable Routing Control MCC Building
 PAGA Layout
 CCTV Layout
 Instrument Main Cable Tray and Cable Way Outdoor
 Instrument Main Cable Layout
 Instrument Loop Drawing
 JB Wiring/Interconnection Drawing
 Building Fire Alarm and Suppression System Block Diagram
 Instrument Location Plan
 Instrument Nozzle Arrangement Drawing
 Instrument Wiring Layout
 Layout of Chanel Base Support in Control Room SP Beringin-A
 Fire Detector and Device Wiring Layout