Project Design Basis
Project Execution Plan
Site Visit Report
Project Schedule
Project Coordination and Comunication Procedure
Document, Equipmet & Piping Numbering Procedure
Review & Approval Procedure
Reporting Project Procedure
Document Control Procedure
Progress Calculation & Reporting Procedure
Master Document and Item List Index
Project Quality Procedure
- Process
Process Operating, Maintenance, Control & Shutdown Philosophy
Process & Utility description
Overpressure Protection, Depressuring, Relief Disposal and Drain Philosophy
Isolation Philosophy
Process Simulation Report
Hydraulic Simulation Report
Material Selection Report
Dynamics Simulation Report
Flare and Vent Sizing
Depressurize and blowdown study
Calculation for PSV
Calculation for Line Sizing
Calculation for Closed Drain Drum BRA-V-5501
Calculation for Flare KO Drum BRA-KOD-5601
Calculation for Production Separator BRA-V-1001
Calculation for Test Separator BRA-V-1003
Calculation for Inlet Scrubber BRA-V-2000
Calculation for HP Gas Scrubber BRA-V-2004
Calculation for Sales Gas Scrubber BRA-V-4001
Calculation for Fuel Gas Scrubber BRA-V-5101
Calculation for for UA/IA Consumption, UA Receiver (BRA-TS-5201) and IA Receiver
(BRA-TS-5202)
Calculation for Water Well Pump BRA-P-5301A/B
Calculation for Fire Water Pump
Calculation for Diesel Distribution Pump BRA-P-5001 A/B
Calculation for Closed Drain Sump Pump BRA-P-5502
Calculation for Product Liquid Transfer Pump BRA-P-1001A/B
Calculation for KO Drum Sump Pump (BRA-P-5602)
Calculation for Test Liquid Transfer Pump
Calculation for Raw Water Tank BRA-T-5301
Calculation for Diesel Storage Tank BRA-T-5001
Calculation for Production Tank BRA-T-1001A/B
Calculation for Test Tank BRA-T-1002
Calculation for Utility Water Pump BRA-P-5302A/B
Calculation for Fire Water Demand & Water Pond
Calculation for TEG Dehydration Calculation (include TEG & Glycol Calculation).
Calculation for Jockey Pump
Calculation for Closed Drain Pump BRA-P-5501A/B
Calculation for Flare KO Drum Pumps (BRA-P-5601A/B)
Calculation for Oily Water Pump BRA-P-5701
Calculation for Effluent Water Pump BRA-P-5702
Calculation for Chemical Consumption
Calculation for Fuel Gas Demand
Calculation for Utility Consumption (Utility Air, Instrument, Diesel, Service water).
Heat & Material Ballance
PFD Separation and Liquid Handling System
PFD Compression System
PFD Dehydration and Sales Gas Delivery System
UFD Diesel Fuel System
UFD-Fuel Gas and Main Power Generation System
UFD Utility Plant & Instrument Air System
UFD Utility Water Treatment System
UFD Fire Water System
UFD Flare System
UFD Close and Open Drain System
PFD Overall Facility SP Beringin A
PFD Wellhead SP Beringin A
Drawing Index
P&ID - Legend & Symbol Standard
P&ID - Legend & Symbol Standard
P&ID - Legend and Symbol Instrument
P&ID Legend and Symbol Instrument
P&ID - Legend and Symbol Instrument
P&ID Production Well #BRG-01, #BRG-34, #BRG-35
P&ID Production Well #BRG-38, #BRG-10
P&ID - Production Well #BRG-A5, #BRG-A6, #BRG-H1
P&ID Production and Test Manifold
P&ID Production Separator
P&ID Test Separator
P&ID Inlet Scrubber
P&ID HP Gas Scrubber
P&ID Gas Dehydration System
P&ID TEG Regeration Package
P&ID Dehydration System - Sump Drum, TEG Drum and Sump Pump
P&ID Gas Pig Launcher
P&ID Gas Pig Receiver at Beringin D
P&ID Sales Gas Scrubber
P&ID Production Tank A
P&ID Production Tank B
P&ID Test Tank
P&ID Condensate Loading Pump
P&ID Pig Launcher
P&ID Pig Receiver at Beringin D
P&ID Pipeline SP Beringin C - SP Beringin D
P&ID Metering Assembly
P&ID Diesel System
P&ID Fuel Gas System - Fuel Gas Scrubber
P&ID Fuel Gas System - Fuel Gas Electric Heater
P&ID Gas Engine Generator (GEG) Package
P&ID Diesel Engine Generator (DEG) Package
P&ID Air Compressor System and Plant Air Receiver
P&ID Instrument Air Dryer System
P&ID Instrument Air Receiver
P&ID Instrument and Utility Air Distribution System
P&ID Well Water Pump Package and Water Filter
P&ID Raw Water Tank
P&ID Service Water System
P&ID Fire Water System
P&ID Fire Water Ring Main
P&ID Foam System
P&ID Closed Drain System
P&ID Flare KO Drum
P&ID Flare Tip
P&ID Open Drain Header
P&ID Open Drain System
P&ID Chemical - Corrosion Injection Pump
Shutdown Hierarchy
Line List
- Process Safety
Safety & Fire Fighting Equipment Specification
Fire water foam & spray system specification
HAZOP Study Procedure
HAZID Study Procedure
Safety Integrity Level (SIL) Classification & Verification Study Procedure
- Mekanikal
Centrifugal Pump Specification
Fire Water Pump Specification
Flare System Package
Gas Dehydration Unit Specification
Diesel Engine Generator Specification
Gas Engine Generator Specification
Electric Heater
RFQ for API Pumps
RFQ for Non API Pumps
RFQ For Fire Water Pumps and Jockey pumps
RFQ for Main Power Generator (Gas Engine Generator)
RFQ for Emergency Power Generator (Diesel Engine Generator)
RFQ for TEG Dehydration Package
RFQ for Gas Fuel Gas System Package (BRA-SPX-5101)
RFQ Flare System Package
- Piping
Piping General Design Specification
Piping Material Specification
Wall thickness calculation
Special Item Datasheet
TBE For Specialy Item
Plot Plan Drawing SP Beringin A
Plot Plan SP Beringin D
Piping GA Keyplan SP beringin A
Piping Key Plan SP Beringin D
Piping Tie-in List
Special Item List
MTO - Manual Valve and piping bulk material
Tie In Procedure
- Civil
Specification for survey topography ( IFC )
Specification for soil investigation & geoelectricity ( IFC )
Specification for site preparation & grading ( IFA )
Survey Topography Procedure ( IFC )
Soil Investigation & geoelectricity procedure ( IFC )
Site preparation & Grading procedure (IFA )
Construction specificationfor site piling works
Piling work procedure
- Elektrikal
Load Flow Study
Short Circuit Study
Motor Starting Study
Protection Coordination Study
Electrical Drawing Index
Legend & symbol
Overall one line Diagram
One line Diagram for UPS
Electrical Load List Main Equipment Sizing
- Instrument
Instrument I/O List
Instrument Power Consumption List
Instrument Index
Specification for Actuated On-Off Valve
Instrument Fire & Gas System Specification
Telecommunication (in plant) Specification
Pressure Regulator Specification
Specification for General Instrument
Instrument Requirement for Package Equipment Specification
Specification for Safety Relief Valve
Specification for Control Valve
Specification for ICSS
Specification for Instrument and Telecommunication Cable
Specification For Instrument Installation
Specification for Building Fire Alarm System
Specification for Fire Supression System
Pressure Regulator Calculation
Control Valve Calculation
PSV, Gauge Hatch & PVSV Calculation
Restriction Orifice & Flow Element Calculation
Calculation for Thermowell
Pressure Regulator
Shutdown Valve (SDV)
PVSV
Control Valve
Pressure Safety Valve
Fire Suppression System Datasheet
Restriction Orifice Datasheet
Alarm Speaker And Strobe Light Datasheet
Addressable Fire Detection System Datahseet
Flare Gas Flowmeter (USM) Datasheet
Fire And Gas Detector Datasheet
Pressure And Differential Pressure Gauge Datasheet
Temperature Gauge With Thermowell Datasheet
Level Gauge Datasheet
Pressure And Differential Pressure Transmitter Datasheet
Temperature Transmitter With Thermowell Datasheet
Displacer Level Transmitter & Switch Datasheet
Turbine Meter Datasheet
Orifice Plate And Flange Datasheet
Rotameter Datasheet
Radar Type Level Transmitter Datasheet
Positive Displacement Flowmeter Datasheet
Water Content (Moisture) Datasheet
PCS and ESD Cause & Effect Diagram (make separate sheet)
Fire & Gas Cause and Effect Diagram
Control & Telecommunication Interface (Split of Scope)
Overall Cable Block Diagram
Control and Safety System Architectural Diagram
Overall Telecommunication Block Diagram
Typical Instrument Process Hook Up & Installation
Control Room Layout
Typical Installation Detail
Fire And Gas Detector Layout
Indoor Cable Routing Control MCC Building
PAGA Layout
CCTV Layout
Instrument Main Cable Tray and Cable Way Outdoor
Instrument Main Cable Layout
Instrument Loop Drawing
JB Wiring/Interconnection Drawing
Building Fire Alarm and Suppression System Block Diagram
Instrument Location Plan
Instrument Nozzle Arrangement Drawing
Instrument Wiring Layout
Layout of Chanel Base Support in Control Room SP Beringin-A
Fire Detector and Device Wiring Layout