0% found this document useful (0 votes)
71 views3 pages

Goals/Targets For Calander Year 2021

The document outlines the goals and targets for calendar year 2021 for an officer in the Telecommunication department of Pakistan Railways. The goals are divided into quarters and include minimizing train delays due to overhead line faults, maintaining telecom systems, and improving facilities like internet access, conference systems and phone equipment at stations. A progress report for the first quarter indicates that estimates have been submitted to address overhead line issues, maintenance is ongoing given staffing constraints, and equipment purchases have been received. Problems include lack of staff and interference affecting overhead lines.

Uploaded by

saadfarazkhan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
71 views3 pages

Goals/Targets For Calander Year 2021

The document outlines the goals and targets for calendar year 2021 for an officer in the Telecommunication department of Pakistan Railways. The goals are divided into quarters and include minimizing train delays due to overhead line faults, maintaining telecom systems, and improving facilities like internet access, conference systems and phone equipment at stations. A progress report for the first quarter indicates that estimates have been submitted to address overhead line issues, maintenance is ongoing given staffing constraints, and equipment purchases have been received. Problems include lack of staff and interference affecting overhead lines.

Uploaded by

saadfarazkhan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

GOALS/TARGETS FOR CALANDER YEAR 2021

Name Of Officer Saad Faraz Name of Post with BPS D.A.T.E/PSC/ BS - 17

Department/Cadre Telecommunication

Goals/ Targets

1. Minimizing detention to trains on account of PLC due to overhead lines faults


Quarter - I 2. Restoration of Control Communication system over the stations
3. Efficient maintenance of Telecom System i.e. Ufone, VHF, Public Addressing System, Solar Panel installed
over stations
4. Provision of 50 GSM Sets, 500 KG SWG Wires and 70 Telephone Sets for Stations, DS Office & control/
block lines
Quarter – II 1. Minimizing detention to trains on account of PLC
2. Efficient maintenance of installed Telecom System over stations
3. Provision of Public Addressing Systems at ATKD, BOS, DKL, MWI, KDA stations for passengers’ facilitation
4. Provision of Sound System for VVIP Conference of Federal Minister and Principle Officers

Quarter – III 1. Minimizing detention to trains on account of PLC


2. Efficient maintenance of installed Telecom System over stations
3. Provision of internet facility at major stations for passengers’ facilitation
4. Provision of Conference System at Committee Room of DS Office, PSC
5. Restoration of JAD – KHCT section
Quarter - IV 1. Minimizing detention to trains on account of PLC
2. Efficient maintenance of installed Telecom System over stations
3. Provision of EPBX Exchange at DS Office, PSC

(Muhammad Nasir) (Saad Faraz)


Divisional Superintendent Divisional Assistant Telecom Engineer
Pakistan Railways, Peshawar Pakistan Railways, Peshawar

QUARTERLY PROGRESS REPORT FOR THE FIRST QUARTER FOR CALANDER YEAR 2021

Name Of Officer Saad Faraz Name of Post with BPS D.A.T.E/PSC/ BS - 17

Department/Cadre Telecommunication

Goals/ Targets Achievements Problems Facing

1. Minimizing detention to trains on 1. An estimate of underground 1. No TLA staff is available for the
account of PLC due to overhead cable has already been efficient maintenance of Overhead
lines faults forwarded to HQs Office, LHR Lines with this office. Moreover,
2. Restoration of Control for approval. Moreover, HQs outside interference is causing
Communication system over the office has already been misc cutting of overhead lines.
stations requested for TLA staff for the 2. Same as 1.
3. Efficient maintenance of Telecom maintenance of Overhead Lines 3. Staff available is below sanctioned
System i.e. Ufone, VHF, Public till the replacement of overhead strength so facing difficulty in
Addressing System, Solar Panel wires with underground cable. maintaining the installed system.
Quarter - I installed over stations 2. Same as 1.
4. Provision of 50 GSM Sets, 500 3. Telecom staff available is
KG SWG Wires and 70 Telephone carrying out maintenance on
Sets for Stations, DS Office & reception of complaints from
control/ block lines stations and control office, DS
Office etc.
4. Tender case has been finalized
and the material supplied by the
contractor has been received by
FOTs/PSC&KDA.
(Muhammad Nasir) (Saad Faraz)
Divisional Superintendent Divisional Assistant Telecom Engineer
Pakistan Railways, Peshawar Pakistan Railways, Peshawar

You might also like