THE ARBITRATION LAW OF INDIA: A CRITICAL ANALYSIS

by Sumeet Kachwaha*

[This article was first published in Asia International Arbitrational Journal, Volume 1, Number 2, Pages
105-126]

India opened a fresh chapter in its arbitration laws in 1996 when it enacted the Arbitration and
Conciliation Act (‘the Act’ or ‘new Act’). This article presents salient features of the Act and analyses its
workings in its near one decade of existence.

A. The Pre-1996 Position

Prior to 1996, the arbitration law of the country was governed by a 1940 Act. This Act was largely
premised on mistrust of the arbitral process and afforded multiple opportunities to litigants to approach
the court for intervention. Coupled with a sluggish judicial system, this led to delays rendering
arbitrations inefficient and unattractive. A telling comment on the working of the old Act can be found
in a 1981 judgment of the Supreme Court where the judge (Justice DA Desai) in anguish remarked ‘the
way in which the proceedings under the (1940) Act are conducted and without an exception challenged
in Courts, has made lawyers laugh and legal philosophers weep …’.

B. A New Act, A New Beginning

India (in the good company of several other nations) enacted its new Arbitration Act based on the
United Nations Commission on International Trade Law Model Law on International Commercial
Arbitration2 and the Arbitration Rules of the United Nations Commission on International Trade Law
1976.3 This was in January 1996. The Statement of Objects and Reasons to the Act made no bones of
the inefficiency of the old legislation. It said that the same had ‘become outdated’ and there was need
to have an Act ‘more responsive to contemporary requirements’. It added: ‘Our economic reforms may
not become fully effective if the law dealing with settlement of both domestic and international
commercial disputes remains out of tune.’

Amongst the main objectives of the new Act (set out in the Statement of Objects and Reasons) are ‘to
minimize the supervisory role of courts in the arbitral process’ and ‘to provide that every final arbitral
award is enforced in the same manner as if it were a decree of the Court’.

This is how the Supreme Court dwelled on the new Act:

To attract the confidence of International Mercantile community and the growing volume of India’s
trade and commercial relationship with the rest of the world after the new liberalization policy of the
Government, Indian Parliament was persuaded to enact the Arbitration & Conciliation Act of 1996 in
UNCITRAL model and therefore in interpreting any provisions of the 1996 Act Courts must not ignore
the objects and purpose of the enactment of 1996. A bare comparison of different provisions of the
Arbitration Act of 1940 with the provisions of Arbitration & Conciliation Act, 1996 would unequivocally
indicate that 1996 Act limits intervention of Court with an arbitral process to the minimum.4

C. The Scheme of the Act

The Act is a composite piece of legislation. It provides for domestic arbitration, international commercial
arbitration, enforcement of foreign award and conciliation (the latter being based on the UNCITRAL
Conciliation Rules of 1980).

The more significant provisions of the Act are to be found in Parts I and II thereof. Part I contains the
provisions for domestic and international commercial arbitration. Any arbitration to be conducted in
India would be governed by Part I, irrespective of the nationalities of the parties. Part II provides for
enforcement of foreign awards.

Part I is more comprehensive and contains extensive provisions based on the Model Law. It provides,
inter alia, for arbitrability of disputes, nonintervention by courts, composition of the arbitral tribunal,
jurisdiction of the arbitral tribunal, conduct of the arbitration proceedings, recourse against arbitral
awards and enforcement. Part II, on the other hand, is largely restricted to enforcement of foreign
awards governed by the Convention on the Recognition and Enforcement of Foreign Arbitral Awards5 or
the Convention on the Execution of Foreign Arbitral Awards.6 Part II is thus, (by its very nature) not a
complete code. This led to judicial innovation by the Supreme Court in the case of Bhatia International v
Bulk Trading.7 Here the Indian court’s jurisdiction was invoked by a party seeking interim measures of
protection in relation to an arbitration under the Rules of Arbitration of the International Chamber of
Commerce International Court of Arbitration8 to be conducted in Paris. The provision for interim
measure (s 9) was to be found in Part I alone (which applies only to domestic arbitration). Hence, the
court was faced with a situation where there was no proprio vigore legal provision under which it could
grant interim measures of protection. Creatively interpreting the Act, the Supreme Court held that the
‘general provisions’ of Part I would apply also to offshore arbitrations, unless the parties expressly or
impliedly exclude applicability of the same. Hence, by judicial innovation, the Supreme Court extended
the general provisions of Part I to foreign arbitrations as well.

It may be stated that this was premised on the assumption that the Indian courts would otherwise have
jurisdiction in relation to the matter (in the international sense). This became clear in a subsequent
decision of the Supreme Court in Shreejee Traco (I) Pvt Ltd v Paperline International Inc.9 Here the
court’s assistance was sought for appointing an arbitrator in a foreign arbitration. The power of
appointment by the court exists under s 11 of Part I of the Act (which applies to domestic arbitration
alone). The court declined to exercise jurisdiction. It found that the arbitration was to be conducted in
New York and that the law governing the arbitration proceedings would be the law of seat of the
arbitration. Hence, the extension of Part I provisions to foreign arbitrations sanctified byBhatia10 would
not be resorted to in every case. The Indian courts would have to first determine if it has jurisdiction, in
the international sense.

D. Salient Features of the Act

The Act applies to all types of arbitrations, viz statutory or non-statutory, institutionally administered or
ad hoc, the only qualification being that the dispute must be arbitrable.11 The salient features of the Act
are discussed below.

1. Arbitration Agreement Defined

An arbitration agreement has to be in writing, and may be even contained in an exchange of letters or
any other means of telecommunication which provide a record of the agreement. The agreement need
not be signed and the unsigned agreement affirmed by the parties’ conduct would be valid as an
arbitration agreement.12 An arbitration agreement would also be considered to be in writing if there is
an exchange of a statement of claim and defence in which the existence of the agreement is alleged by
one party and not denied by the other.13

2. Arbitrability of Disputes

The Act states that the relationship between the parties need not be contractual. Hence, a dispute in
tort can also be referred. The Supreme Court in the case of Renu Sagar Power Co v General Electric Co14
stated this as follows:

The question is not whether the claim lies in tort but the question is whether even though it has lain in
tort it ‘arises out of’ or is ‘related to’ the contract, that is to say, whether it arises out of the terms of the
contract or is consequential upon any breach thereof.

The court in Renu Sagar I also approved an English decision in the case of Woolf v Collis Removal
Service15 where the Court of Appeal held that though the claim in negligence was a claim in tort and not
under contract, yet there was a sufficiently close connection between that claim and the transaction to
bring the claim within the arbitration clause. Citing this, the court in Renu Sagar I continued:

this authority clearly shows that even though a claim may not directly arise under the contract which
contains an arbitration clause, if there was sufficient close connection between that claim and the
transaction under the contract, it will be covered by the arbitration clause.

Hence, whether an action lies in tort or contract, it would lie before an arbitral forum, unless it can be
demonstrated that the cause of action is de hors the contract which contains the arbitration clause.

A controversy arose as to whether arbitrators would have jurisdiction to order specific performance of a
contract. The High Court of Delhi held16 that the power to grant specific performance is discretionary
and statutorily conferred on civil courts under the Specific Relief Act 1963. Hence, an arbitral tribunal
would have no such power. On the other hand, the High Courts of Punjab, Bombay and Calcutta17 took
the view that arbitrators could grant specific performance. The Supreme Court put to rest the
controversy in Olympus Superstructures Pvt Ltd v Meena Vij ay Khetan18 and held that arbitrators do
have the power to order specific performance of a contract. The court relied on Halsbury’s Laws of
England19 which states that the differences or disputes which may be referred must consist of ‘a
justifiable issue triable civilly. A fair test of this is whether the difference can be compromised lawfully
by way of accord and satisfaction.’

In the case of Hindustan Petroleum Corporation v Pink City,20 the respondent resisted arbitration on the
ground that the cause of action made out by the claimant (ie short delivery and tampering with weights
and measures and seals) was essentially a criminal offence under special statutes. It was contended that
the respondent’s conduct could be investigated only by officers so authorised under statute and that the
offence, if any, can be tried only by a court of competent jurisdiction and not by an arbitrator. The
Supreme Court negatived this contention, holding that the claimant had rights under the contract which
are independent of the statutory provisions and hence the contractual rights could be enforced through
the arbitration process: ‘The existence of dual procedure; one under the criminal law and the other
under the contractual law is a well-accepted legal phenomenon in Indian jurisprudence.’21
The Supreme Court has, however, held that a claim for winding up22 is not arbitrable and hence a court
action for winding up cannot be dismissed on a contention that the parties had entered into an
arbitration agreement.

The case of Man Roland v Multicolour Offset23 made a significant inroad into the sanctity of an
arbitration agreement. Here the Supreme Court held that the Monopolies and Restrictive Trade
Practices Commission of India (‘Commission’) would have jurisdiction to entertain a claim for damages
arising out of an alleged ‘unfair trade practice’ (in this case, sale of alleged defective goods and
deficiency in services). The contract between the parties contained an arbitration agreement providing
for arbitration in Paris, under ICC Rules with German law applying. The Supreme Court held that the
Monopolistic and Restrictive Trade Practices Act 1969 (‘MRTP Act’) provides for statutory remedies in
respect of statutorily defined offences and these remedies are in addition to the usual remedies
available to the parties under the Contract Act. Hence, the complaint for damages under the MRTP Act
would be maintainable despite an arbitration agreement between the parties. This case assumes
significance, for an ‘unfair trade practice’ is defined rather widely under the MRTP Act. It includes any
‘unfair or deceptive practice’ for sale of goods or services. The Indian claimant here was thus able to
bypass the arbitration agreement and sue for damages in India (with Indian law applying) by adapting
the MRTP route.

3. Expert Determination Distinguished from Arbitration

The Supreme Court had occasion to consider this extensively in the case of KK Modi v KN Modi24 where,
after citing Mustill & Boyd’s Commercial Arbitration25 and Russell on Arbitration,26 it concluded that,
by and large, there were no conclusive tests one could follow to determine whether the agreement was
to refer an issue to an expert or whether the parties had in fact agreed to resolve disputes through
arbitration. It held:

therefore our courts have laid emphasis on (1) existence of disputes as against intention to avoid future
disputes; (2) the tribunal or forum so chosen is intended to act judicially after taking into account
relevant evidence before it and the submissions made by the parties before it; and (3) the decision is
intended to bind the parties. Nomenclature used by the parties may not be conclusive. One must
examine the true intent and purport of the agreement.27

4. International Commercial Arbitration

As mentioned earlier, the Act governs both domestic and international commercial arbitrations through
Part I. There are only two situations where Part I treats domestic arbitration differently from
international commercial arbitration. One is in relation to an appointment of an arbitrator by the court
and the other is in relation to the determination of governing law (and these are discussed below).
‘International commercial arbitration’ is defined as an arbitration where at least one of the parties is a
national or habitual resident in any country other than India or a body corporate which is incorporated
in any country other than India or a company or association or a body of individuals whose ‘central
management and control’28 is exercised in any country other than India.29

5. The Principle of Non-intervention by the Courts

The principle that the courts shall not interfere in arbitral proceedings is a fundamental theme
underlying the Act. Indeed the Act contemplates of only three situations where judicial authority may
intervene in arbitral proceedings. These are:

i. appointment of arbitrators, where the parties’ envisaged method for the same fails (s 11);
ii. ii. ruling on whether the mandate of the arbitrator stands terminated due to inability to
perform his functions or failure to proceed without undue delay (s 14(2)); and
iii. iii. provide assistance in taking evidence (s 27).
iv. As would be noticed, Indian law is far more restrictive in allowing court intervention
(compared to the Model Law).
v.

Section 5 of the Act provides, through a non-obstante clause, that in ma ers governed by Part I, no
judicial authority shall interfere except where so provided for.

Section 8 is a companion section. It states that a judicial authority before which an action is brought in a
matter which is the subject matter of an arbitration agreement shall refer the parties to arbitration. The
only condition being that the party objecting to the court proceedings must do so no later than his first
statement on the substance of the dispute. In the meanwhile, the arbitration proceedings may be
commenced and continued with and an award rendered.

Two points are noteworthy. The first is that s 5 (departing from the Model Law) contains a non-obstante
clause. Section 8 also departs from the Model Law. The corresponding provision (Art 8 of the Model
Law) permits the court to entertain an objection to the effect that the arbitration agreement is ‘null and
void inoperative or incapable of being performed’. The departures made by the Indian law demonstrate
the legislative intent to keep the courts out and let the arbitral stream flow unobstructed.

By and large the Indian courts have well understood the spirit and intent behind the principle of non-
intervention. Thus, in CDC Financial Services (Mauritius) Ltd v BPL Communications30 the respondent
obtained an antiarbitration injunction from the High Court on the ground that the pledge of shares
which was sought to be enforced through arbitration would enable the claimants to take control of a
telecom company which (as it was a foreign company) would be contrary to Indian law. On appeal, the
Supreme Court rejected this contention, stating that this was a plea on merits and thus within the sole
jurisdiction of the arbitrators. Interestingly, the court not only vacated the injunction, it also restrained
the respondent from moving any further applications ‘which would have the effect of interfering with
the continuance and conclusion of the arbitration proceedings’.31 In Sukanaya Holdings v Jayesh
Pandya,32 however, the Supreme Court refused to stay the court action on the ground that the subject
matter of the arbitration agreement was not the same as the subject matter of the civil suit. Besides, the
parties in the two actions were not identical. The court held that the entire subject matter of the suit
should be the subject matter of the arbitration agreement in order for the mandatory provisions of s 8
to apply.

6. Interim Measures of Protection

A party which seeks interim measures has essentially two avenues open to it. It can approach the court
or it can approach the arbitral tribunal. Section 9 enables a party to approach a competent court33
before or during the arbitral proceedings or even after the award is pronounced, but before it is
enforced. The Model Law in fact has a more restrictive provision: it does not contemplate recourse to a
court for an interim measure after the award is pronounced (Art 9).

The Supreme Court in the case of Sundaram Finance v NEPC34 held that if a court is approached before
the arbitral proceedings are commenced, the applicant must issue a notice to the opposing party
invoking the arbitration clause or, alternatively, the court would have to be first satisfied that the
applicant will indeed take effective steps to commence the arbitral proceedings without delay. Further,
the court would have to be satisfied that there exists a valid arbitration agreement between the
parties.35

The arbitral tribunal also has powers to make an order for any interim measure of protection or to
provide appropriate security in connection with the measures ordered (s 17). However, this provision is
perceived to be ineffective and usually not resorted to. This is for several reasons. Firstly, the applicant
has to wait for the arbitral tribunal to be constituted (thus ruling out this route in the case of urgency).
Further, there are no sanctions if the order is disobeyed. From a practical viewpoint also, third parties
cannot be affected. Further, any interim measure would come to an end with the making of an award
(unlike a court obtained order which can continue till enforcement).
Commenting upon the inherent limitations of the provision, the Supreme Court in MD Army Welfare
Housing Organisation v Sumangal Services36 stated:

the power of the arbitrator is a limited one. He cannot issue any direction which would go beyond the
reference or the arbitration agreement. An interim order must relate to the protection of the subject-
matter of dispute and the order may be addressed only to a party to the arbitration. It cannot be
addressed to other parties … no power is conferred upon the Arbitral Tribunal to enforce its order nor
does it provide for judicial enforcement thereof.

It may be mentioned that orders passed under ss 9 and 17 are appealable.37

7. Arbitrators

a. Appointment of Arbitrators

The Act allows full freedom to the parties in the matter of appointment of arbitrators. However, if there
is a failure of the parties’ agreed mechanism for appointment, the Chief Justice of a High Court (in the
case of a domestic arbitration) or the Chief Justice of the Supreme Court of India (in the case of an
international commercial arbitration) may be approached for this purpose. This is the first instance in
which the Act envisages recourse to a court in relation to arbitration proceedings.

The Act demonstrates its sensitivity towards a foreign litigant embroiled in an arbitration in India. Thus,
while parties to a domestic dispute have to approach the Chief Justice of the High Court of the state, the
parties in an international commercial arbitration would be able to approach the highest judicial officer
of the country, viz, the Chief Justice of India. (In contrast, the Model Law envisages the appointment to
be made by a court.38) Commenting on the mandate resting on the highest judicial officer of the land,
the Supreme Court in Konkan Railway Corporation v Rani Construction Pvt Ltd39 commented:

The function has been le to the Chief Justice or his designate advisedly, with a view to ensure that the
nomination of the arbitrator is made by a person occupying high judicial office or his designate, who
would take due care to see that a competent, independent and impartial arbitrator is nominated.

A question arose as to whether the Chief Justice is required to carry out his duty (of appointment) in an
administrative or in a judicial capacity. If the Chief Justice is required to act in a judicial capacity, a
certain procedure would have to be followed which would necessarily entail delays and the decision
may tend to embarrass the arbitrator’s jurisdiction to decide issues of merit or jurisdiction
independently. There may also be a possibility of conflicting decisions. After some difference of opinion,
the controversy was finally se led by a Constitution Bench of the Supreme Court (ie a bench comprising
of five judges) in the Konkan case.40 Here the court unanimously held that the function of appointment
is administrative in nature and not judicial. It held that one of the objects of the law is to have the
arbitral tribunal constituted as expeditiously as possible. Even formal pleadings for this purpose would
not be required and the opposing party would need to be only notified ‘so that it may know of it and
may if it so choose, assist the Chief Justice or his designate in the nomination of an arbitrator’.41

This significant judgment ensures that the arbitral process does not get stultified in the process of
seeking court assistance for constitution of the arbitral tribunal. Thus, in a given case, if there is any
controversy as to the existence or validity of the arbitration agreement, it has to be le to the arbitral
tribunal alone and the Chief Justice would not get diverted into determining this issue. In the
subsequent case of Nimet Resources v Essar Steels42 the Supreme Court clarified that even if there is
any ‘doubt’ in the mind of the Chief Justice or his designate as to the existence or validity of an
arbitration agreement, the same must be referred to the arbitral tribunal to be resolved. It is only if the
Chief Justice ‘can be absolutely sure’43 that there is no arbitration agreement in existence between the
parties that the power of appointment under s 11 can be declined.

b. Challenge to an Arbitrator

Like Art 12 of the Model Law and Art 10 of the UNCITRAL Arbitration Rules, the Act also requires the
arbitrators (including party appointed arbitrators) to be independent and impartial and make full
disclosure in writing of any circumstance likely to give rise to justifiable doubts on the same.44

At this stage, one may point out a peculiar practice in India (essentially in government and public sector
building contracts) providing for arbitration by an owner’s employee or nominee (eg arbitration by the
managing director or engineer of the corporation). This practice has been sanctified with usage and
continues under the new regime as well. Though the matter has not been tested under the 1996 Act, it
is quite possible that this practice of appointment would continue to be upheld.

An arbitrator may be challenged only in two situations. First, if circumstances exist that give rise to
justifiable grounds as to his independence or impartiality; second, if he does not possess the
qualifications agreed to by the parties. A challenge is required to be made within 15 days of the
petitioner becoming aware of the constitution of the arbitral tribunal or of the circumstances furnishing
grounds for challenge. Further, subject to the parties’ agreement, it is the arbitral tribunal (and not the
court — unlike under the old regime) which shall decide on the challenge. If the challenge is not
successful the tribunal shall continue with the arbitral proceedings and render the award, which can
then be challenged by an aggrieved party at that stage. This is another significant departure from the
Model Law, which envisages recourse to a court of law in the event the arbitral tribunal rejects the
challenge.45
The Indian courts have held that ‘the apprehension of bias must be judged from a healthy, reasonable
and average point of view and not on mere apprehension of any whimsical person. Vague suspicions of
whimsical, capricious and unreasonable people are not our standard to regulate our vision.’46

c. Termination of Mandate of an Arbitrator

The Act provides that the mandate of an arbitrator shall terminate in two circumstances: (1) if he
becomes de jure or de facto unable to perform his functions; or (2) if he fails to act without undue delay.
If there is any controversy as to the above, a party may, unless otherwise agreed, apply to the court for
a decision (the second instance of court intervention envisaged by the Act).

8. Jurisdiction of the Arbitral Tribunal

Section 16 of the Act (corresponding to Art 16 of the Model Law) is a key provision of the Act. The
section provides that the arbitral tribunal may rule on its own jurisdiction, including with respect to the
existence or validity of the arbitration agreement. Further, the arbitration clause shall be treated as
independent of the underlying contract and a decision that the contract is null and void shall not entail
ipso jure the invalidity of the arbitration clause. Where the arbitral tribunal rejects an objection to its
jurisdiction, it shall continue with the arbitral proceedings and make the award. Any challenge to the
award would be available at that stage. If, on the other hand, the arbitral tribunal accepts the plea as to
its lack of jurisdiction, an appeal shall lie to a court of law.47

This again marks a significant departure from the Model Law which contemplates recourse to a court
from a decision of the arbitral tribunal rejecting a challenge to its jurisdiction. The Indian legislature’s
keenness to keep the courts out of the arbitral process thus becomes evident with every step of the
legislation.

9. Arbitral proceedings

a. Conduct of Arbitral Proceedings

The arbitrators are masters of their own procedure and subject to parties’ agreement, may conduct the
proceedings ‘in the manner they consider appropriate’. This power includes the power to determine the
admissibility, relevance, materiality and weight of any evidence.48 The only restraint on them is that
they shall treat the parties with equality and each party shall be given a full opportunity to present his
case,49 which includes sufficient advance notice of any hearing or meeting.50 Neither the Code of Civil
Procedure 1908 (‘CCP’) nor the Indian Evidence Act 1872 apply to arbitrations.51 Unless the parties
agree otherwise, the tribunal shall decide whether to hold oral hearings for the presentation of evidence
or for arguments or whether the proceedings shall be conducted on the basis of documents or other
material alone. However, the arbitral tribunal shall hold oral hearings if a party so requests (unless the
parties have agreed that no oral hearing shall be held).52

The arbitrators have power to proceed ex parte where the respondent, without sufficient cause, fails to
communicate his statement of defence or appear for an oral hearing or produce evidence. However, in
such a situation the tribunal shall not treat the failure as an admission of the allegations by the
respondent and shall decide the matter on the evidence, if any, before it. If the claimant fails to
communicate his statement of claim, the arbitral tribunal shall be entitled to terminate the
proceedings.53

b. Taking of Evidence in Arbitral Proceedings

The Indian Oaths Act 1969 extends to persons who may be authorised by consent of parties to receive
evidence. This Act, thus, encompasses arbitral proceedings as well.54 Section 8 of the said Act states
that every person giving evidence before any person authorised to administer oaths ‘shall be bound to
state the truth on such subject’. Thus, witnesses appearing before an arbitral tribunal can be duly sworn
by the tribunal and be required to state the truth on oath and upon failure to do so, commit offences
punishable under the Indian Penal Code.55 However, the arbitrators cannot force unwilling witnesses to
appear before them and for this the court’s assistance is provided vide s 27 of the Act. Under this
provision the arbitral tribunal or a party with the approval of the tribunal may apply to the court seeking
its assistance in taking evidence (this is also provided for in the Model Law). However, s 27 of the Act
goes beyond the Model Law as it states that any person failing to attend in accordance with any order of
the court or making any other default or refusing to give evidence or guilty of any contempt of the
arbitral tribunal, shall be subject to like penalties and punishment as he may incur for like offences in
suits tried before the court. Further, the court may either appoint a commissioner for taking evidence or
order that the evidence be provided directly to the arbitral tribunal. These provisions extend to any
documents to be produced or property to be inspected. Section 26 provides for appointment of experts
by the arbitral tribunal for any specific issue. In such a situation, a party may be required to give the
expert any relevant information or produce any relevant document, goods or property for inspection as
may be required. It will be open to a party (or to the arbitral tribunal) to require the expert, after
delivery of his report, to participate in an oral hearing where the parties would have an opportunity to
put questions to him.
10. Governing Law

For determining the rules of law applicable to the substance of the dispute, the law makes a distinction
between international commercial arbitration and arbitration between Indian parties.56

In international commercial arbitration the arbitral tribunal shall decide the dispute in accordance with
the rules of law designated by the parties as applicable to the substance of the dispute and, failing any
such designation, the rules of law the tribunal considers appropriate given all the circumstances. Indian
courts have long since accepted that in the absence of express or implied choice, the arbitrators would
apply the law which has ‘the closest and most real connection with the contract’.57

In arbitration between Indian parties, however, the tribunal is obliged to apply the substantive law for
the time being in force in India.

The Act provides that where the award is for payment of money, the tribunal may include interest at
such rate as it deems reasonable for the whole or part of the period between the date of accrual of the
cause of action and the date of the award.58 Further, a sum directed to be paid by the arbitral tribunal
shall (unless the award otherwise directs) carry interest at 18% per annum from the date of the award
to the date of payment.59 The rather healthy rate of 18% interest from the date of the award till
payment (not to be found in the Model Law) seems to be designed to deter any unwarranted challenge
to the award. This rate of interest may, however, not apply to any foreign award being enforced in India,
as the provision is to be found in Part I alone. For foreign awards, the rate of interest would be governed
by the CCP which empowers the court to order pendente lite interest as well as interest from the date of
decree to the date of payment. For commercial transactions, the rate of interest shall not exceed the
contractual rate or where no contractual rate is specified, the rate at which moneys are lent or
advanced by banks in relation to commercial transactions.60

11. General Powers of the Arbitral Tribunal

There is a long line of case law which states that the arbitrator is the sole judge of the evidence before
it. This is how a Supreme Court decision puts it:

Appraisement of evidence by the arbitrator is ordinarily never a matter which the Court questions and
considers. The arbitrator in our opinion is the sole judge of the quality as well as the quantity of
evidence and it will not be for the Court to take upon itself the task of being a judge of the evidence
before the arbitrator.61
Interpretation of a contract is an issue of law and also within the sole prerogative of an arbitrator:

When the arbitrator is required to construe a contract then merely because another view may be
possible the court would not be justified in construing the contract in a different manner and then to set
aside the award by observing that the arbitrator has exceeded his jurisdiction in making the award.62

The court by purporting to construe the contract cannot take upon itself the burden of saying that the
construction was contrary to the contract and as such beyond jurisdiction.63 However, in construction
contracts if there is no provision for escalation or for additional quantity of work, the arbitrator cannot
allow the same.64

The arbitrator is bound to state the reasons for the award unless the parties have agreed otherwise or
the award is on agreed terms (as a result of a settlement). An award, however, cannot be challenged for
lack of adequate reasons65 (or indeed the reasonableness of the reasons66).

The arbitral tribunal is empowered to make typographical or clerical corrections to the award either on
its own initiative or on an application of the parties.

The tribunal may at any time during the arbitral proceedings make an interim award on any matter with
respect to which it may make a final award.67

12. Arbitral Awards

a. Recourse against Awards

A domestic award can be challenged and set aside only by way of an application under s 34 of the Act
and only on the grounds contained thereunder. Section 34 is based on Art 34 of the Model Law. To
paraphrase the provision, an award can be set aside if:
(1) the party making the application was under some incapacity; or (2) the arbitration agreement was
not valid under the law agreed to by the parties (or applicable law); or (3) the party making the
application was not given proper notice of the appointment of the arbitrator or of the arbitral
proceedings or was otherwise unable to present his case; or (4) the award deals with a dispute not
contemplated by or falling within the terms of submissions to arbitration or it contains decisions beyond
the scope of the submissions to arbitration; or (5) the composition of the arbitral tribunal or the arbitral
procedure was not in accordance with the agreement of the parties; or (6) the subject matter of the
dispute was not capable of settlement by arbitration; or (7) the arbitral award is in conflict with the
public policy of India.
Section 34 (deviating somewhat from the Model Law) goes on to add an ‘Explanation’ in relation to the
ground of public policy to clarify that an award would be in conflict with the public policy of India if the
same was affected by fraud or corruption or was in violation of the confidential requirements a ached to
the conciliation proceedings provisions prescribed under the Act.68

An application for setting aside an award must be made within three months of receipt of the award by
the applicant subject to a further extension of 30 days on sufficient cause being shown. An application
beyond this period is time barred and further delay cannot be condoned.69

b. The Saw Pipes Judgment

The limited grounds of challenge provided for under s 34 reflect the very jurisprudence on which the
Model Law is formulated, viz of trust in the arbitral process. It is abundantly clear that the courts have
no power to get into the merits of the matter. However, this basic proposition was put to the test and
suffered a setback in the case of ONGC v Saw Pipes Ltd.70 There the court succumbed to the temptation
to ‘correct’ perceived errors of judgment. The court was concerned with an arbitral award which
disallowed liquidated damages. The Indian law of liquidated damages is contained in s 74 of the Indian
Contract Act 1872.71 The position is different from common law in as much as ‘reasonableness of the
compensation’ becomes an issue even where liquidated damages are stipulated. The Supreme Court in
Saw Pipes came to the conclusion that the impugned award, in so far as it disallowed liquidated
damages on the premise that they have to be proved, was legally fl awed. In the process it held as a
matter of law, that an award can also be challenged on the ground that it contravenes ‘the provisions of
the Act or any other substantive law governing the parties or is against the terms of the contract’.72
Further, the judgment expanded the concept of public policy to add that the award would be contrary to
public policy if it is ‘patently illegal’. An earlier Supreme Court decision, by a larger bench, in the case of
Renu Sagar Power Co v General Electric Corporation73 had construed the ground of ‘public policy’
narrowly as confined to the ‘fundamental policy of Indian law or the interest of India or justice or
morality’. The Supreme Court in Saw Pipes distinguished Renu Sagar II on the ground that the said
judgment was in the context of a foreign award. The reasoning of the court is that in foreign arbitration,
the award would be subject to being set aside or suspended by the competent authority under the
relevant law of that country, whereas in domestic arbitration there is no such recourse and the award
attains finality74 (thus, the greater need for judicial scrutiny).

Hence, the ratio of Saw Pipes in so far as the expansion of public policy is concerned, would be confined
only to domestic awards. The expansion of s 34 to include ‘patent illegality’ may also not apply to
foreign awards since this expansion was premised by the court on the provisions of Part I of the Act
(which would not apply to foreign awards). Thus, foreign awards would be saved from the application of
the said judgment.

The case of Saw Pipes makes a significant dent in the jurisprudence of arbitration in India. The judgment
has come in for some sharp criticism. Eminent jurist and lawyer Mr FS Nariman minced no words when
he said that the judgment has:

virtually set at naught the entire Arbitration and Conciliation Act of 1996 …

To have introduced — by judicial innovation — a fresh ground of challenge and placed it under the head
of ‘Public Policy’, was first contrary to the established doctrine of precedent — the decision of a Bench
of three Judges being binding on a Bench of two Judges. It was also contrary to the plain intent of the
new 1996 Law — viz., the need for finality in alternate methods of dispute resolution without Court
interference.

If Courts continue to hold that they have the last word on facts and on law — notwithstanding
consensual agreements to refer matters necessarily involving facts and law to adjudication by
arbitration — the 1996 Act might as well be scrapped.

The Division Bench decision of the two Judges of the Court has altered the entire road-map of
Arbitration Law and put the clock back to where we started under the old 1940 Act.75

The Saw Pipes judgment skews the delicate balance, carefully crafted by the Model Law (and enshrined
in s 34), between finality of arbitral awards on one hand and permissible judicial review on the other.
The judgment is quite contrary to both the letter and spirit of arbitration law in India. The judgment is
especially unsuitable for India, where courts are bogged down with enormous workload. In such a
situation, to open the door to challenge on merits — howsoever guardedly — is to undermine the
efficacy of this dispute resolution mechanism.

13. Enforcement of Foreign Awards

This brings us to Part II of the Act. The Act provides for enforcement of both the New York Convention
awards and the Geneva Convention awards vide Part II thereof. India is not a party to the Convention on
the Settlement of Investment Disputes between States and Nationals of Other States 1965 (‘Washington
Convention’) or indeed any other convention or treaty pertaining to enforcement of foreign arbitral
awards.
For the purposes of this article, we deal with the provisions relating to the New York Convention alone
(since the provisions pertaining to the Geneva Convention are now otiose).

a. Definition of Foreign Award

This is contained in s 44 of the Act. A peculiar feature of Indian law is that a foreign award by definition
means an award passed in such territory as the Central Government by notification may declare to be a
territory to which the New York Convention applies. Hence, even if a country is a signatory to the New
York Convention, it does not ipso facto mean that an award passed in such country would be
enforceable in India. There has to be further notification by the Central Government declaring that
country to be a territory to which the New York Convention applies.

The reservation carved out by the Indian legislation (though in terms of and permitted by the New York
Convention) may well prove to be a legal trap for the unwary. Only 43 countries have been notified so
far by the Indian government. Thus, while France, Germany, United Kingdom, United States of America,
Japan and Singapore have been notified; Hong Kong and Australia (amongst many others) have not yet
been notified.76

14. Reference of Parties to Arbitration

Section 45 of the Act provides that notwithstanding anything contained in the CCP, a judicial authority
when seized of an action in respect of a matter where the parties have entered into an arbitration
agreement shall, at the request of any party, refer the parties to arbitration. The only exception is if the
court finds the agreement to be null and void, inoperative or incapable of being performed. It would be
noticed that this section (though in tune with Art 8 of the Model Law) is a little different from its
corresponding provision in the Act for domestic arbitrations (s 8) in as much as it permits a court to
retain jurisdiction on the ground that the arbitration agreement is null and void, inoperative or
incapable of being performed. So while these contentions would not furnish grounds for avoiding the
arbitral process in a domestic arbitration, the position in relation to foreign arbitrations would be
different. This difference in the Act between Indian and foreign arbitrations is possibly premised on the
fact that it may be too harsh to compel an Indian party to undergo arbitration in a foreign country if it
could demonstrate that the arbitration agreement is null and void, inoperative or incapable of being
performed (and in any case the Model Law also envisages court intervention to this extent).
An interesting issue arose in Shin-Etsu Chemical Co Ltd v Aksh Optifibre Ltd77 as to whether a ruling by
the court on the validity or otherwise of an arbitration agreement is to be on a prima facie basis or a
final decision. If it were to be a final decision, it would involve a full trial and consequently years and
years of judicial proceedings which would frustrate the arbitration agreement. Keeping this and the
object of the Act in mind, the Supreme Court, by a 2:1 decision, held that a challenge to the arbitration
agreement under s 45 on the ground that it is ‘null and void, inoperative or incapable of being
performed’ is to be determined on a prima facie basis. It said:

If it were to be held that the finding of the court under Section 45 should be a final, determinative
conclusion, then it is obvious that, until such a pronouncement is made, the arbitral proceedings would
have to be in limbo. This evidently defeats the credo and ethos of the Act, which is to enable expeditious
arbitration without avoidable intervention by judicial authorities.

This would mean that a court decision under s 45 would not operate as res judicata and the aggrieved
party would be able to challenge the same in subsequent proceedings. Thus, in effect, a person
challenging an arbitration agreement on the ground that it is null and void, inoperative or incapable of
being performed would have three rounds to vent his grievances: the first, under s 45 before an Indian
court; the second time around before the arbitral tribunal itself; and, finally, at the stage of enforcement
of the arbitral award. The judgment of the Supreme Court is no doubt welcome. Any other
interpretation would have brought about a situation where it would take very little for a dishonest
litigant to derail a foreign arbitration. At the same time an issue would remain as to what is to be done
in cases where the court does in fact come to a conclusion that the arbitral agreement is null and void,
inoperative or incapable of being performed. A decision to this effect is appealable under s 50 of the Act.
Thus, a ruling on a prima facie view alone would not be satisfactory. One of the judges addressed this
and held that if the court were to arrive at a prima facie conclusion that the agreement is in fact null and
void, it would go ahead and hold a full trial and enter a final verdict. In such a situation, therefore, a
foreign arbitration may well come to a halt pending final decision from an Indian court, but otherwise
proceedings under s 45 would not have any significant effect impeding progress of a foreign arbitration.

15. Conditions for Enforcement of Foreign Award

Where the court78 is satisfied that a foreign award is enforceable, it shall be deemed to be a decree of
that court.79 Grounds for refusal of enforcement are provided for under s 48 of the Act and these are
virtually the same as the New York Convention grounds (and, therefore, not markedly different from the
Model Law). There are two noteworthy differences between ss 48 and 34. Section 34 (in relation to
domestic awards) permits the court to set aside an award; whereas s 48 provides only for refusal to
enforce a foreign award. (Refusal to enforce an award would not therefore by itself prevent an applicant
from seeking to enforce it in some other jurisdiction.) There is no provision in Indian law for setting aside
a foreign award. Thus, if a foreign award is to be set aside in India, the only remedy would be by way of
a civil suit under the Specific Relief Act 1963.80 The second difference between ss 34 and 48 is that the
latter (in relation to foreign awards) contains an additional ground under which the court could decline
to enforce a foreign award and that is if the award has not yet become binding on the parties, or has
been set aside or superseded by a competent authority of the country in which, or under the laws of
which, the award was made. (The second difference flows from the provisions of the New York
Convention.)

Earlier, in relation to s 34, it was pointed out how the ground of ‘public policy’ has been narrowly
construed by the Supreme Court inRenu Sagar II.81 In that case, a three-judge bench of the Supreme
Court after an in-depth consideration of the case law opted for the narrow interpretation of the ‘public
policy’ ground as affording a challenge to enforcement of an award. The court held that the award may
be refused to be enforced if it ‘is contrary to (i) fundamental policy of Indian law; or (ii) the interests of
India; or (iii) justice or morality’.82

If the court is satisfied that the foreign award is enforceable, the same shall be deemed to be a decree of
the court. The Supreme Court has held83 that no separate application need be filed for execution of the
award. A single application for enforcement of award would undergo a two-stage process. In the first
stage, the enforceability of the award, having regard to the requirements of the Act (New York
Convention grounds) would be determined. Once the court decides that the foreign award is
enforceable, it shall proceed to take further steps for execution of the same.84

An appeal shall lie from an order of the court refusing to enforce a foreign award. However, interestingly
(unlike for domestic awards), there is no appeal provided for against an order of the court rejecting
objections to enforce the award.85 Hence, an order upholding the foreign award is not appealable.
However, the constitutional remedy by way of a (discretionary) Special Leave Petition to the Supreme
Court of India would still be maintainable.86

E. Conclusion

Thus to conclude, India has put in place a progressive piece of legislation which is essentially based on
the Model Law and the UNCITRAL Arbitration Rules. Any departure therefrom is essentially aimed at
keeping court intervention at bay. The courts of the land (by and large) are in tune with the spirit of the
law: witness, for instance, a constitution bench of the Supreme Court holding that the Chief Justice of
India or the Chief Justice of the High Court (as the case may be) would exercise administrative and not
judicial functions in the matter of appointment of arbitrators. The Saw Pipes decision87 is no doubt a
retrogressive step. However, it is hoped that when the opportune moment arrives, the decision will be
reviewed.

India has an effective law in place. What it now needs is inculcation of the culture of arbitration within
the bar, the bench and the arbitral community. The baggage of the past needs to be dropped so that
India, indeed, has an attractive arbitration mechanism on offer.

* BA (Hons) (English Literature), LLB (University of Delhi); Partner, Kachwaha & Partners, India.

1 Guru Nanak Foundation v Ra an Singh & Sons 1981 (4) SCC 634.

2 General Assembly Resolution 40/72, adopted on 11 December 1985 (‘Model Law’).

3 General Assembly Resolution 31/98, adopted on 15 December 1976 (‘UNCITRAL Arbitration Rules’).

4 Konkan Railway Corporation v Mehul Construction Co 2000 (7) SCC 201.

5 New York, 10 June 1958 (‘New York Convention’).

6 Geneva, 26 September 1927 (‘Geneva Convention’).

7 2002 (4) SCC 105 (‘Bhatia’).

8 Effective 1 January 1998 (‘ICC Rules’).

9 2003 (9) SCC 79.

10 Supra, n 7.

11 ‘This Part shall not affect any other law for the time being in force by virtue of which certain disputes
may not be submitted to arbitration’: the Act s 2(3).

12 Smita Conductors Ltd v Euro Alloys Ltd 2001 (7) SCC 728.

13 Section 7.

14 1984 (4) SCC 679 (‘Renu Sagar I’).

15 [1947] 2 All ER 260.

16 Sulochana Uppal v Surinder Sheel Bhakri AIR 1991 Del 138.

17 Lakshmi Narain v Raghbir Singh AIR 1956 Punj 249; Fertiliser Corp of India v Chemical Construction
Corp ILR 1974 Bom 856 (DB); Keventer Agro Ltd v Seegram Comp Ltd, Apo 498 of 1997 dated 27 January
1998 (Cal).

18 1999 (5) SCC 651.


19 Fourth Edition, Bu erworths (Arbitration, Vol 2, para 503).

20 2003 (6) SCC 503.

21 Ibid at 515.

22 Haryana Telecom v Sterlite Industries 1999 (5) SCC 688.

23 2004 (7) SCC 447.

24 1998 (3) SCC 573.

25 Second Edition, 1989, Butterworths.

26 Twenty-first Edition, 1997, Sweet & Maxwell.

27 Supra, n 24 at 585.

28 A somewhat confusing expression borrowed from taxing statutes.

29 Section 2(f).

30 2003 (12) SCC 140.

31 Id at 144.

32 2003 (5) SCC 531.

33 ‘Court’ is defined vide s 2(e) to mean the principal civil court of original jurisdiction, having
jurisdiction to decide the question forming the subject matter of the arbitration (if the same had been
the subject matter of a suit). This would thus mean either the District Court or the High Court of a state
(as in some states, High Courts have original civil jurisdiction beyond a certain pecuniary limit).

34 1999 (2) SCC 479.

35 Id at 488.

36 2004 (9) SCC 619.

37 Section 37.

38 Model Law, Arts 6 and 11.

39 2002 (2) SCC 388 at 405.

40 Ie Konkan Railway Corporation v Rani Construction Pvt Ltd 2002 (2) SCC 388.

41 Id at 406.

42 2000 (7) SCC 497.


43 Id at 500.

44 Section 12.

45 Model Law, Art 13.

46 International Airports Authority of India v KD Bali & Anor 1988 (2) SCC 360.

47 Section 37.

48 Section 19(3) and (4).

49 Section 18.

50 Section 24(2).

51 The Act, s 19; Evidence Act, s 1.

52 Section 24.

53 Section 25.

54 Raipur Development Authority v Chokhamal Contractors 1989 (2) SCC 721.

55 Penal Code, ss 191 and 193.

56 Section 28(1)(a).

57 British India Steam Navigation Co v S Cashew Industries 1990 (3) SCC 481 at 496.

58 Section 31(7)(a).

59 Section 31(7)(b).

60 CCP, s 34.

61 Municipal Corporation of Delhi v Jagan Nath Ashok Kumar 1987 (4) SCC 497.

62 HP State Electricity Board v RJ Shah & Co 1999 (4) SCC 214 at 225, para 25.

63 PV Subba Naidu v Government of AP 1998 (9) SCC 407 at 409, para 6.

64 Ramachandra Reddy v State of Andhra Pradesh 2001 (4) SCC 241.

65 Sudarsan Trading Co v Government of Kerala 1989 (2) SCC 38.

66 Ibid.

67 Section 31(6).
68 Sections 75 and 81: s 75 states that the parties shall keep confidential all matters relating to the
conciliation proceedings and s 81 provides that the parties shall not rely on or introduce as evidence in
any arbitral or judicial proceedings any proposal, view or suggestion made or exchanged by a party to
the conciliator.

69 Union of India v Popular Construction Co 2001 (8) SCC 470.

70 2003 (5) SCC 705 (‘Saw Pipes’).

71 Section 74 of the Contract Act, in so far as relevant, provides as follows:

Compensation of breach of contract where penalty stipulated for When a contract has been broken, if a
sum is named in the contract as the amount to be paid in case of such breach, or if the contract contains
any other stipulation by way of penalty, the party complaining of the breach is entitled, whether or not
actual damage or loss is proved to have been caused thereby to receive from the party who has broken
the contract reasonable compensation not exceeding the amount so named or, as the case may be, the
penalty stipulated for.

72 Saw Pipes, supra, n 70 at 744–745.

73 1994 Supp (1) SCC 644 (‘Renu Sagar II’).

74 Supra, n 70 at 723.

75 From the transcript of a speech delivered by Mr FS Nariman at the inaugural session of ‘Legal
Reforms in Infrastructure’, New Delhi, 2 May 2003.

76 For a complete list of the countries notified, see GK Kwatra, The Arbitration and Conciliation Law of
India (2003) published by the Indian Council of Arbitration.

77 2005 (6) SCALE 561.

78 The enforcement proceedings must be brought before a court within whose jurisdiction the
aggrieved party has at least some property situated: 1995 Supp (2) SCC 280.

79 Section 49.

80 Pratabmull Rameshwar v KC Sethia AIR 1960 Calcu a 702.

81 Supra, n 73.

82 Id at 682.

83 Fuerst Day Lawson v Jindal Exports Ltd 2001 (6) SCC 356.
84 Id at 371.

85 Section 37.

86 Constitution of India, Art 136.

87 Supra, n 70.