Second Basement Plan AR OT: or Any Portion Thereof Is Reserved by The Architects

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

GENERAL REFERENCE DRAWINGS COPYRIGHT AND RIGHT OF REPRODUCTION OF THIS DRAWING

1 FOR DOORS REFER TO DRAWING 10131-OT-AR-5-010-01


OR ANY PORTION THEREOF IS RESERVED BY THE ARCHITECTS
2 FOR SHOPFRONTS REFER TO DRAWING 10131-OT-AR-5-020-01
3 FOR FINISHES REFER TO DRAWING 10131-OT-AR-5-030-01
4 FOR CEILINGS REFER TO DRAWINGS STARTING FROM 10131-OT-AR-6-097-01,
FOR GUESTROOM CEILINGS REFER TO DETAIL DRAWINGS
5 FOR GUESTROOM DETAILS REFER TO DRAWINGS STARTING FROM
10131-OT-AR-4-012-01. GUESTROOM TYPE REFERENCE CODES G## AS
INDICATED PER GUESTROOM DESCRIPTIONS
6 FOR LIFTS REFER TO DRAWINGS STARTING FROM 10131-OT-AR-5-071-01

A B C D D1 E F F1 G H R5A I J J1 K L L1 M N O P Q
J E C A F K

A. GENERAL NOTES :
ALL LEVELS INICATED ARE REFERENCED TO THE SURVEYOR'S DATUM POINT
1. ALL STRUCTURAL, ELECTRICAL, CIVIL, INTERIORS AND LANDSCAPING QUERIES ARE TO BE
REFERENCED TO THE RELEVANT CONSULTANTS DRAWINGS, SPECIFICATIONS AND DETAILS.
2. ALL PLUMBING QUERIES ARE TO BE REFERRED TO THE RELEVANT SPECIALIST CONSULTANT
DRAWINGS, SPECIFICATIONS & DETAILS.
3. ALL CONCRETE COLUMNS AND STRUCTURE TO STRUCTURAL ENGINEERS DETAILS &
SPECIFICATIONS.
4. ALL SPECIFICATIONS WITH REGARD TO FIRE REGULATIONS, TO BE REFERRED TO CONSULTANTS
DETAILS AND SPECIFICATIONS.
5. ANY DISCREPANCY IN THE DRAWINGS, DIMENSIONS & SPECIFICATIONS TO BE BROUGHT TO THE THE
ATTENTION OF THE CONSULTANT AND THE ARCHITECT PRIOR TO ANY WORK BEING PUT IN HAND.
6. DIMENSIONS - ONLY FIGURED DIMENSIONS TO BE FOLLOWED, NO SCALING OF DRAWINGS WILL BE
17 17
PERMITTED.

BLOCKWORK WALLS
PAINT 7. IN CAVITY WALLS BUILD FULL HEIGHT 200mm. WIDE BLOCKWORK PIERS.
STORE 8. IN CAVITIES EXCEEDING 115mm., ALLOW FOR 15mm. JOINT BETWEEN DIAPHRAGM PIER AND
ADJOINING FACE.
CHIEF ASSISTANT ENG HOTEL ENGINEER'S 9. TIES TO BE SUPPLIED TO DIAPHRAGM PIERS, AS PER STRUCTURAL ENGINEERS SPECIFICATIONS.
ENGINEER'S AND SECRETARY'S STORE ROOM MACHINE 10. PROVIDE MOVEMENT JOINTS WHERE INDICATED ON DRAWINGS MARKED UP BY SITE ENGINEER.
11. ALL BLOCKWORK BUILT BUTTING UP TO CONCRETE COLUMNS TO BE FIXED TO FACE OF COLUMN
OFFICE OFFICE ROOM WITH STAINLESS "HOOP IRON" STRAPS TO STRUCTURAL ENGINEER'S DETAILS.
MACHINE 12. SUPPLY STAINLESS STEEL WALL TIES IN ALL CAVITY WALLS TO STRUCTURAL ENGINEERS
SPECIFICATION.
008 009 010 011 012 013 014 015 016 017
ROOM 13. ALL EXTERNAL WALLS TO BE SUPPLIED WITH DPM TO INTERNAL SKIN, PLUS 50mm. INSULATION IN
CAVITY.

B. STRUCTURAL NOTES :
1. DRAWINGS ISSUED BY DSA FOR CONSTRUCTION TO SITE ARE WITHOUT STRUCTURAL ENGINEERS
NOTES FOR LINTOLS AND BEAMS OVER OPENINGS AND RECESSES.
2. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE DRAWING ISSUED BY THE STRUCTURAL
16 16 ENGINEER WITH NOTES FOR LINTOLS, BEAMS, MOVEMENT JOINTS ETC.

C. CONTRACTOR NOTES :
CONTRACTOR TO RECONFIRM ALL SALIENT LEVELS WITH MUNICIPALITY PRIOR TO COMMENCEMENT
R5A OF WORK
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CO-ORDINATION OF ALL SERVICES BEFORE
ANY WORK COMMENCES.
SCALE 1:50 2. THE CONTRACTOR SHALL COMPLY WITH ALL CIVIL DEFENCE REGULATIONS
H H 3. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR MECHANICAL, ELECTRICAL AND PLUMBING
SERVICES AND SPECIALISED ITEMS AND INCORPORATE THE DUCTS TO CONCEAL NECESSARY PIPES,
R5
CAR PARKING R6
CABLES AND CONDUITS ETC. FOR THE CONSULTANTS APPROVAL PRIOR TO COMMENCEMENT OF
WORK.
FHR 4. THE CONTRACTOR SHALL INSPECT THE SITE PRIOR TO ANY WORK BEING PUT IN HAND AND TAKE
INTO CONSIDERATION ALL ASPECTS OF THE WORKS, TO BE CARRIED OUT INCLUDING ANY
DEWATERING, IF REQUIRED. ALL LEVELS AND DIMENSIONS ARE TO BE CHECKED ON SITE PRIOR TO
ANY WORK BEING PUT IN HAND. ALL SETTING OUT IS THE CONTRACTOR'S RESPONSIBILITY.
5. THE CONTRACTOR SHALL REPORT ANY DISCREPANCIES IN THE DRAWINGS, DIMENSIONS AND
MAINTENANCE SPECIFICATIONS TO THE CONSULTANT AND THE ARCHITECT PRIOR TO ANY WORK BEING PUT IN
007 R4A R6A
17 PARKING BAYS 005 WORKSHOPS 6.
HAND.
ALL EQUIPMENT SHALL BE TO THE APPROVAL OF THE LOCAL CIVIL DEFENCE DEPARTMENT.
15A 15A
7. ALL DRAWINGS TO BE READ IN CONJUNCTION WITH FINISHES AND SPECIFICATION DOCUMENTS.

BUILDING PROTECTION NOTE :


CONTRACTOR TO ENSURE THAT "BAYER PREMISE 200SC" OR OTHER APPROVED BRAND OF ANTI-TERMITE
006 R5A FHR CUPBOARD SOIL POISON IS APPLIED STRICTLY TO MANUFATURERS INSTRUCTIONS AND SPECIFICATIONS BY A
REGISTERED PEST CONTROL COMPANY AND GUARANTEED IN WRITING TO OBEIKAN AGAINST TERMITE
R5 INFESTATION FOR TEN YEARS. APPLICATION UNDER ALL FLOORS, SURFACE BEDS, GROUND BEAMS,
R4A R6 R6A SUMPS, LIFT PITS AND ALL OTHER SURFACES CONTACTING SOIL, INCLUDING FORMING & POISONING
R4 R7 FURROWS AGAINST FOUNDATION WALLS ETC., FILLING IN FURROWS AND RAMMING THEREAFTER TO
COMPACTION AND METHOD AS REQUIRED BY SITE ENGINEER. REMOVE ALL POISON CONTAINERS AND
MALE TOILET LOBBY WASTE OFF SITE. TAKE ALL NECESSARY PRECAUTIONS TO PROTECT SITE PERSONNEL DURING
15 RA F.E. STAIR 5 15 APPLICATION.
AREA
005
WALL LEGEND

14
KNOWLEDGE & 14
CONCRETE WALL

RELAXATION CENTER CONCRETE BLOCKWORK TO PARAPET WALLS SCREENING

T
AF
GAS TANKS
MALE WASH & CHANGE ROOM WARE/GLASS

SH
WASH 3HR FULL HEIGHT FIRE RATED AUTOCLAVED AERATED

E
004

C
CONCRETE (AAC) WALL

I
RV
SE
2HR FULL HEIGHT FIRE RATED AUTOCLAVED AERATED
CONCRETE (AAC) WALL
1HR FULL HEIGHT FIRE RATED AUTOCLAVED AERATED
13A 13A CONCRETE (AAC) WALL
STANDARD FULL HEIGHT AUTOCLAVED AERATED CONCRETE
(AAC) WALL(30 MIN. FIRE RATING)
003 STANDARD FULL HEIGHT AUTOCLAVED AERATED CONCRETE
RB
STAFF
R3 R8 (AAC) WALL (NO FIRE RATING)
DINING ROOM
FULL HEIGHT ACOUSTIC AND MOISTURE RESISTANT (BATHRM
72 SEATS
GENERAL SIDE) GYPSUM PARTITION WALL . TO HAVE 30 MINUTE FIRE
JANITORS RESISTANCE WHEN USED AS A BARRIER BETWEEN GUEST
STOREROOM ROOMS AND BETWEEN GUEST ROOMS AND CORRIDORS.
13 OFFICE 13
FULL HEIGHT ACOUSTIC (SOUND INSULATED) GYPSUM
002 PARTITION WALL . TO HAVE 30 MINUTE FIRE RESISTANCE WHEN
DRIVEWAY USED AS A BARRIER BETWEEN GUEST ROOMS AND BETWEEN
GUEST ROOMS AND CORRIDORS.
FULL HEIGHT MOISTURE RESISTANT ( BATHROOM SIDE)
004 X GYPSUM PARTITION WALL
CORRIDOR
FULL HEIGHT GYPSUM PARTITION WALL
001
PRAYER ROOM STONE WALL CLADDING

STAFF RESTAURANT KITCHEN

12A MEP SHAFT STAFF 12A


KITCHEN
HOUSE COLD ROOM COMPRESSOR
LIFT VOID KEEPING LIFT VOID ROOM
GENERAL
STORE ABLUTION W 2012-03-14 ES CONCRETE WALL AT LIFT CORE REVISED AS ZAS
PER STRUCT ENG DETAILS.
12 ROOM R2 R2 RA RB X R9 R9 12 ISSUE FOR CONSTRUCTION FOR BLOCKWORK
ONLY.
V 2012-01-11 MK ZAS
GYPSUM ADDED TO PARTITION NOTE IN WALL
B B LEGEND.
11 11 U 2011-12-02 MK VALUE ENGINEERING ISSUE
LAUNDRY AND HOUSEKEEPING OFFICE ADDED
AT LAUNDRY - HILTON REQUIREMENT.
ELECTRICAL TELECOM
ROOM ROOM T 2011-10-24 ES A02: REVISE BLOCKWORK TO AAC BLOCK. A03: VALUE
L ENG.
REVISE SUN LOUVRES AND ELIMINATE
SECONDARY LOUVRES. A04: GLAZING TO BE
SINGLE GLAZED AT SPANDREL & CROWN.
F.E. STAIR 4 FURNITURE
EXEC.H/K S 27-06-2011 DH ISSUED FOR TENDER, ADDED FREEZER INTO
F&B STORAGE ROOM
AR

OFFICE STORE R 15-06-2011 DH RE-ISSUED FOR CLIENT REVIEW , ADDED AR.


SERVICE DUCT SERVICE DUCT 415mm INSULATED WALL TO THE
FEMALE TOILET & CHANGE ROOM COMPRESSOR ROOM, ADDED LEVEL CHANGES
IN SLAB ABOVE
Q 30-05-2011 DH ISSUED FOR CLIENT REVIEW. COMBINED AR, FE,
SERVICE AND OFFICE LOBBY'S TO FROM ONE FB
PRESSURISED LIFT LOBBY. MOVED FHR
001
LAUNDRY & VALET CABINET AS PER FE. AMENDED FIRE MAN LIFT
TO SHOW LIFT 5 AS FIRE MAN LIFT & LIFT 9 THE
10 002 02 10 CROSS OVER LIFT ON THIS LEVE, LAMENDED
ESCALATOR PIT AS PER CONSULTANT,
UNIFORM DELIVERY AMENDED OFFICE LIFT DOOR OPENING'S.
ADDED BUILDERS PLINTH'S IN STAFF
M DINING/KITCHEN AREA.
FHR CUPBOARD CORRIDOR Resp.
No Date By Description
Consult

PRESSURIZATION
SHAFT FHR CUPBOARD
MEP F.E. STAIR 01
R1 04 SHAFT R10

LAUNDRY
09 09
FHR CUPBOARD
OFFICE 09 09
ASS.H/K 05
OFFICE B.O.H LIFT 05
08 SERVICE SERVICE (FIREMAN) 08
LIFT 011 LIFT 012

LIFT 15
LIFT LOBBY
07 LIFT PIT 13 LOBBY B.O.H LIFT 07
F.E. STAIR 02
SERVICE 06
LIFT LOBBY PRESSURIZATION MEP MEP MEP ELECT.
SHAFT SHAFT SHAFT SHAFT SHAFT HOUSEKEEPING
06 06 06 STORE 06

CORRIDOR
03

05 HATCHED AREA SHOWS STEP IN HOTEL COLD 05


DRY STORE
SLAB FOR
KITCHEN SERVICES ROOM LAUNDRY & VALET
BEVERAGE STORE OFFICE LIFT 09 MEP
LIFT 07 (FIREMAN) SHAFT F&B STORE
LIFT LOBBY
04 04 04 04
HOTEL
OFFICE OFFICE FREEZER
D BEVERAGE LIFT 08 LIFT 10 D
FHR CUPBOARD
COLD ROOM
03 03

02 02
C E H R5A I J L N

RAMP DOWN FROM GROUND RAMP DOWN FROM BASEMENT 2


G TO BASEMENT 2 TO BASEMENT 3 G AFRICA 68 Wierda Road East
FIRE PLUMBING Wierda Valley Sandton 2196 PO Box 787588
METER ROOM Sandton 2146 Gauteng South Africa
Tel +27 11 779 1600 Fax +27 11 779 1602
e-mail: [email protected]

MIDDLE EAST 2nd Floor 204 Convention


Tower Road 312 Zabeel PO Box 9723
RAMP UP FROM BASEMENT 2 RAMP UP FROM BASEMENT 3 Dubai United Arab Emirates
TO GROUND TO BASEMENT 2 Tel +971 4 329 2288 Fax +971 4 329 2289
e-mail: dxbmail@ dsa-arch.com

EUROPE Alameda António Sérgio 7, 2°D


2795-023 Linda-a-Velha Lisboa Portugal
Tel +351 214 193 277 Fax +351 214 193 276
01 01 middle east africa europe
e-mail: [email protected]

FAHED STREET, RIYADH


KINGDOM OF SAUDI ARABIA
J E KM F K
C A
2nd BASEMENT FLOOR PLAN
A B C D D1 E F F1 G H R5A I J J1 K L L1 M N O P Q
HOTEL BACK OF HOUSE AREAS

SECOND BASEMENT PLAN 1:100 JUNE 2010 D.HEINE MK


SCALE 1:100
TEN
OT AR W
S:\Job 10-242 Al Obeikan Tower, Riyadh, Saudi
Arabia\AR-Architect\1-Plans\10131-OT-AR-1-098-01(02,03,04,05).dwg

You might also like