FLOOD ROUTING For Bembezaan Dam

The document provides details of a flood routing analysis for the Bembezaan Dam project. It includes information on the catchment area, dam dimensions, spillway details, and computed flood flows for different return periods. It also presents a graph showing the inflow hydrograph and outflows over time through the two spillways during a flood routing event.

Uploaded by

ALLAN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
90 views1 page

FLOOD ROUTING For Bembezaan Dam

The document provides details of a flood routing analysis for the Bembezaan Dam project. It includes information on the catchment area, dam dimensions, spillway details, and computed flood flows for different return periods. It also presents a graph showing the inflow hydrograph and outflows over time through the two spillways during a flood routing event.

Uploaded by

ALLAN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

FLOOD ROUTING 09-Jun-21

NAME OF PROJECT:- Bembezaan Dam DESIGN FLOOD (QD) =( 2633.00 )cumec


Catchment Area (S)= ( 570.00 ) sq km DAM BASE LEVEL (ZB) =( 6.85 ) m
Length of Catchment (L)= ( 45.00 ) km DAM CONSTANTS (A) =( 38571.99 )
Fall over Catchment (D)= ( 300.00 ) m [(V=A*(Z-ZB)^B] (B) =( 2.5706 )
Gathering Time (G)= 513 minutes 1ST SPILLWAY LEVEL (ZF) =( 25.00 ) m FLOOD ROUTING for Bembezaan Dam
RETURN PERIOD (years) FACTOR FLOOD(cumec) SPILLWAY WIDTH (W) =( 100.00 ) m Spillway max head max level max flow
10 0.115 303 DISCHARGE COEFF. (C) =( 0.00 ) 1st 3.37 28.37 1441.93
nd
25 0.192 505 DESIGN HEAD (HD) =( 2.00 ) m 2 1.37 600.90
50 0.263 692 2ND SPILLWAY LEVEL (ZS) =( 27.00 ) m Total 2042.83
100 0.340 895 SPILLWAY WIDTH (WS) =( 250.00 ) m time increment ratio 0.025
250 0.450 1,184 DISCHARGE COEFF. (CT) =( 1.50 )
500 0.541 1,424 DESIGN HEAD (HT) =( 0.00 ) m
750 0.597 1,572 START FLOW (QS) =( 2.00 ) cumec
1,000 0.637 1,677 F.S.L. CAPACITY (VF) = 66,426,332 cubic metres or 14614 million gallons
2,000 0.742 1,953 START HEAD (HS) = 0.058 m
5,000 0.885 2,330 START DISCH. COEFF. (CS) = 1.432
10,000 (M.P.F.) 1.000 2,633 START FLOOD VOLUME (VS) = 547,001 cubic metres

Head on Main Spillway, m


FLOOD ROUTING for Bembezaan Dam
3000.0 4.00

3.50
2500.0

3.00

2000.0
2.50
FLOW (Cumec)

INFLOW

1500.0 2.00 OUTFLOW 1ST SPILLWAY

OUTFLOW 2ND SPILLWAY

1.50 TOTAL OUTFLOW


1000.0 Head on Spillway

1.00

500.0
0.50

0.0 0.00
0 200 400 600 800 1000 1200 1400 1600 1800

TIME (Minutes)