Sindh Capacity Development Project - SOW
Sindh Capacity Development Project - SOW
Deloitte Yousuf Adil, Chartered Accountants (Deloitte Pakistan) is contractor for USAID
on Sindh Capacity Development Project (SCDP), a USAID three-year project that will
support the sustainability of the Sindh Basic Education Program (SBEP). This will be
done by ensuring stronger governance and improved public accountability in the
education sector through systems building and institutional strengthening of Program
Management and Implementation Unit (PMIU) and Education and Literacy Department
(E&LD) of the Government of Sindh
Deloitte Pakistan invites quotations from Individuals, Registered companies
/firms/software houses / Dealers – for the quoted detailed (sales tax would need to
be deducted at source) Bidders may quote their bids having detailed experience along
with CV/profile with telephone numbers and competitive prices. Bidders may submit
their bids on or before 04:00 pm Friday 09 December 2016 at the below mentioned
address. Any response received after this time will not be considered.
Scope of Work:
The assignment aims to develop mobile applications which can be easily utilized by the
members of School Management Committees (SMCs) 106 schools from 7 districts of
Sindh and 5 towns of Karachi.
The specific objectives of the assignment are:
To develop mobile applications on Android operating system, including:
Teachers/Students Attendance, Missing Facilities, Quality of education, Child
protection and Grants tracking in English, Sindhi and Urdu aligned with Sindh School
Monitoring System (SSMS) already developed under E&LD for Directorate General
Monitoring and Evaluation (DG M&E).
To work directly with SCDP M&E Team, Director General M&E/E&LD/GoS, and also
with the relevant sections of E&LD /School Education Department (RSU, Schools
Directorate) Govt. of Sindh in order to meet specific requirements for the
application and linking it with the Sindh School Monitoring System (SSMS)
To work with SCDP team to define and develop the app’s initial development in
order to make necessary improvements prior to the pilot testing.
Pilot testing of developed android application with the selected SMCs, both rural and
urban.
Finalization of the Android application/tools and its backend technical details.
Documentation of the process and preparation of guidelines manual for operating
the Android.
Requirements:
The work assignment for the individual contractor is as follows:
1. The mobile platform should be accessible on Android both phone and tablet
versions;
2. The applications interface will be designed for English but should have the
possibility of being expanded to Sindhi and Urdu languages
3. Up-to-date data linked directly to Sindh School Monitoring System (SSMS)
4. Data includes the following areas:
a. Building of SSMS indicators on Teacher / Student attendance and Basic Facilities
already developed by E&LD/DG M&E.
b. Quality of Education:
Did the teacher start the session /period with a review of last session on the
subject/topic (before the start of current period, (RECAP) (Yes /No)
Proper introduction of new lesson/session-topic/ideas (Yes/No)
Was the session interactive (involvement of Students) (Yes/No)
Proper closure of the lesson with recap of new ideas/concepts introduced
(Yes /No)
Was their evidence of a conducive classroom for interactive learning:
o Display charts on relevant topics for the specific class/grade
o Student’s work displayed boldly
o Use of the learning materials /displays during teaching-learning
process
c. Child Protection
Observed use of any abusive behavior by teacher:
a. Verbal Abusive Language - (Yes/No)
b. Picking on a child unnecessarily -bias (against a child through passing
sarcastic remarks if the child is poor/not with full abilities or wearing
clothes that are not clean; from a minority religion other than the
dominant one ? etc.) (Yes /No)
c. Punishment physical
i. Use of stick to beat teacher at any part of body
ii. Use of book to beat student at any part of body
iii. Both
iv. Any other punishment
d. Sexual Harassment
d. Grants
1. Any grant received during existing academic year
a. Yes/No
b. If Yes, which type of grant: SMC Fund / School Specific Budget /
School Consolidation Grant / Special Grant / Others –local
philanthropy
c. If Yes which month was:
2. For each one please specify :
a. SMC Grant How Much………… (in Rupees)
b. SSB Grant How Much………… (in Rupees)
c. School Consolidation Grant- How Much………… (in Rupees)
d. Special Grant How Much……………(in Rupees)
e. Others –local philanthropy: in Cash and Or Kind
3. School Improvement Plan (SIP) prepared (Yes/No)
a. If Yes, is it displayed in a public place in school (Yes /No)
b. If Yes, it being implemented (Yes/No)
c. If Yes spending as per School Improvement Plan (mark the specific
areas)
i. Rehabilitation/Repair of:
1. “School walls
2. Classroom Ceilings
3. Blackboard
4. Toilets
5. Water facility
6. Electricity
7. Fans/lights
ii. Repair of school furniture
iii. Purchase of furniture
iv. School Paint
v. Purchase of Fans
vi. Purchase of water tank/cooler
vii. Purchase of sports materials
viii. Purchase of library books
ix. Purchase of learning materials
x. Purchase of Solar System
Duration of contract
The individual contractor will work:
30 days from the beginning of the contract for application development
15 days testing
15 days for training of 240 members of School Management Committees (SMCs)
Travel
All travel to rural and urban areas will be covered including testing sites by Deloitte
SCDP
Contact Details: