Annual Report
Issue 1 – 31st July 2012
IFI Projects
April 11 – March 12
Foreword
SPEN has continued its strategic deployment of wide ranging IFI projects including new and
existing projects with academic and industrial partners. Of particular note are two separate
projects aimed at accurately measuring fault level from network disturbances and the
management of fault level through the development and trial of a Super Conducting Fault
Current Limiter. If both prove successful they will enable DNOs to improve network security
without exceeding fault level rating of switchgear and enable optimisation of switchgear
replacement programmes.
Keenly awaited is the opening of the world-class Power Networks Demonstration Centre (PNDC)
at Cumbernauld, adjacent to SPEN’s existing training centre. This is a project that SPEN has been
actively championing for a number of years in recognition of the need to test and demonstrate
new technologies in a controlled and safe environment under a range of operating scenarios
prior to their deployment on the Distribution network. We anticipate this facility will be
completed by the end of 2012.
In addition we are delighted to have become a major partner in the Technology and Innovation
Centre which represents the cornerstone of the University of Strathclyde’s single-biggest
investment in its research capacity. The industry-led research aims to accelerate the pace of
research and development, attracting new jobs and inward investment and will provide
graduates with the necessary knowledge to meet our industry needs.
In a rapidly changing energy sector we continue to scan the technology horizon for innovation
and invest in appropriate research and development activities that will help to realise the low
carbon vision for the benefit of all.
Frank Mitchell
CEO, SP Energy Networks
Page 2 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Contents
FOREWORD ........................................................................................................................... 2
1.1 Context...................................................................................................................... 5
3. OVERVIEW ..................................................................................................................... 7
6.1 Prototype Low Voltage Jumpers with Integral Circuit Breaker ................................... 11
Page 3 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Page 4 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Ofgem recognised that innovation has a different risk/reward balance compared with a network
operators’ core business. The incentive provided by the IFI mechanism is designed to create a
risk/reward balance that is consistent with research, development and innovation. The two
main business drivers for providing this incentive at this time are the growing need to efficiently
manage the renewal of network assets and to provide connections for an increasing capacity of
renewable generation at all voltage levels. These are significant challenges that will both benefit
from innovation.
With the extension of IFI to the transmission licences, agreement at the ENA R&D Working
Group was given to the creation of a common Good Practice Guide (GPG) considering IFI for
electricity distribution, transmission and gas transmission networks; Version 2 of Engineering
Recommendation G85 issued in December 07.
Page 5 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Our transmission and distribution licence assets come under three wholly owned subsidiaries:
IFI activity is co-ordinated centrally on behalf of these licences, this report relates to R&D activity
undertaken on:
(a) (b)
Figure 1: UK Map showing the territory of (a) SP Distribution & SP Transmission and (b) SP
Manweb
Page 6 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
3. Overview
3.1 IFI Overview
A total of 40 IFI projects are being reported by SP Energy Networks on behalf of the three
ScottishPower Network licence areas for the period 1st April 11 – 31st March 12.
At time of writing SPEN has a total of c.£5.5m authorised IFI projects, representing a levered
portfolio of over £35m. The projects cover a breadth of R&D providers from academia, to
consultants, to manufacturers with projects ranging in investment from £4k to £250k IFI input,
and development timescales of between 6 months and 4 years.
Our R&D activity has increased significantly since the introduction of the IFI. We have continued
to focus on leveraging our programme through collaboration with funding bodies, other network
operators or external suppliers / manufacturers. In 2011/12 every £1 of SP IFI money invested in
a project was levered by c.£5 from other sources:
R&D growth in SPEN (SP-D, SP-M and SP-T) since the introduction of the IFI
Expenditure No. Of Yearly
SP-D, SP-M and SP-T (Internal + Reported Programme
External) Projects Leverage
2004/05 (Early Start) £223k 12 c. £1.5m
2005/06 £546k 36 c. £3m
2006/07 £1,282k 41 c. £5m
2007/08 £1,793k 50 c. £7m
2008/09 £1,978k 38 c. £9m
2009/10 £1,462k 35 c. £7m
2010/11 £1,621k 27 c. £8m
2011/12 £1,975k 40 c. £11m
12.00
6.00
4.00
2.00
0.00
2004/05 2005/06 2006/07 2007/08 2008/09 2009/10 2010/11 2011/12
(Early
Start)
IFI Year
Page 7 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
4. Summary Tables
The following tables have been adapted from the Regulatory Instructions and Guidance
documents (RIGs).
1
Summary of benefits are available in Section 6 “Highlights from 11/12”
Page 8 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
This project initially proposed and led by SPEN, was to develop the first of its kind, in the UK, a
full scale 11kV and LV prototyping network as a test-bed for active network management
techniques and other ‘high risk’ technologies.
Since late 2008, SPEN have been working with collaborative partners (University of Strathclyde,
Scottish & Southern Energy and Scottish Enterprise) to develop the design.
The building of the Centre commenced in 2011 and handover of the facility to the University of
Strathclyde will occur in November 2012. The University will then finish equipment installation
with the aim of officially opening the building for business early January 2013.
Page 9 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Page 10 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
outage for the customers supplied by the circuits off the LV Circuits
generator
L2
Based on a technical specification drawn up by operational
field staff SPEN have developed a prototype LV Jumper
that will safely energise an LV circuit by linking it to the
spill of an adjacent circuit that is energised by a back feed,
L3
as shown in Figure 6.
N
time.
LV Circuits
Over the next 6-12
months SPEN working
Energised from
adjacent substations
via Interconected LV
network
alongside the
Figure 6 LV Board Feeding Radial Circuit manufacturer Ten47
expect to further
refine the design of the LV Jumper (shown in Figure 7) and
carry out the necessary safety tests. This will be followed by
live tests of the jumper in a controlled environment enabling
guidelines for its usage to be drawn up. Assuming this goes
to plan the project will be extended to include the
Figure 7 LV Jumper Applied
Page 11 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
The power industry is faced with the difficulty of acquiring rights-of-way for new transmission
lines, the need to improve the reliability of the power grid, and the challenges of integrating
renewable power sources into power networks. High voltage direct current (HVDC) and flexible
ac transmission system (FACTS) technologies offer some effective schemes to meet these
demands.
SPEN is currently engaged in two significant HVDC deployments, the Western and Eastern Links.
The Western Link, which is by far the most progressed, will link Scotland and Wales with a 2GW
HVDC interconnector. The northern converter station will be located at Hunterston, adjacent to
EDF Energy’s nuclear site, with the southern convertor station planned for Deeside. The options
for an Eastern Link are currently being developed by SPEN in conjunction with Scottish Hydro
Electric Transmission Ltd (SHETL) and National Grid Electricity Transmission (NGET). This link will
be around 2GW and will further increase the transfer capability between Scotland and England.
With this increasing focus on HVDC technology SPEN has been able to benefit from the research
work undertaken by the Electric Power Research Institute (EPRI) in this area.
Given EPRI’s global reach and extensive research programme SPEN has been able to significantly
leverage its research investment.
• Providing a technology watch newsletter with the latest developments in HVDC and
FACTS technologies
• Updating the leading reference guide for the design and operation of HVDC systems
• Resolving operational concerns of owners and operators of existing HVDC and FACTS
systems, and those considering the addition of HVDC or FACTS to their systems
• Evaluating HVDC system performance and conduct component testing
• Evaluating HVDC electrical effects such as electromagnetic interference, fields, and
corona in laboratory test settings
Page 12 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
ScottishPower along with other utility companies engaged in a vegetation management project
with the aim of gaining an improved understanding of vegetation growth, in the UK, and in
particular the closure of the safety space around electrical equipment over time. As part of this
project meteorological record covering the UK for the past 40 years were analysed to create a
complete set of bioclimatic zone maps for the UK. A network of approximately 1300 sites
participated in the study and US closure in the spring and autumn of 2008, 2009 and 2010 was
measured at all sites and a substantial database created that describes the spatial variation of
vegetation growth across the UK during this period.
From the analysis of the results a national annual average change in US was determined. There
was considerable variation by electrical distribution company and therefore by geographic
region. In broad terms the project found that sites located in the warmer areas of southern
England, experienced the average highest rates of growth with the lowest observed at relatively
cooler Scottish Power Scotland sites.
Page 13 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Future climate predictions from the United Kingdom Climate Impacts Programme (UKCIP, 2009)
were combined with US observations to predict future growth rates in the period 2020-2080 for
a variety of climate impact scenarios. Results indicate a substantial change in bioclimatic zones
in the UK for all UKCIP scenarios. It was predicted that the high vegetation growth rates
associated with rapid US degradation that were observed in the warmer southern areas of
England, including the south coast, parts of Cornwall and Devon will extend much further north
and may reach as far as the North Midlands within the next decade or so. This indicates that
climate change could have a substantial impact on the cost of vegetation management over the
next 10 years if current levels of safety and reliability are to be maintained in a period of
increasing growth rates.
A utility company has a duty to maintain safe clearances from overhead lines and the findings
from this project can be used to help shape future vegetation management practices including
the frequency and depth of cut used in maintenance regimes.
SPEN has a population of Noja pole mounted auto reclosers (PMAR) that are monitored and
controlled via their SCADA system using a radio system. Limitations within the SCADA system
mean that only a small number of data points can be monitored and controlled on the Recloser
controller.
SPEN is working with Nortech to implement a system using GPRS that allows much more data to
be returned from the Noja units. This data will provide further information about both
ScottishPower’s network and the Noja units themselves.
The Noja device incorporates a protection module which can be accessed to retrieve active and
historical data relating to both protection activity and statistical metering.
Page 14 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
This can only be accessed via an RS232 port within the Noja Control Panel that is mounted below
the Main Tank, out with the Safety Distance, and above the Anti-climber. Consequently, there
are several benefits that can be gained from this project including:
• The Health and Safety benefit of not having to climb the pole to access PMAR
information;
• Ability to record short time interruptions (<1min);
• Current and voltage values could be taken from the Noja during a fault event and
incorporated into impedance maps for speedier fault locations; and
• Negating the need to visit each PMAR twice a year with subsequent OPEX savings.
Remote access via iHost will provide a dashboard screen showing key performance figures for
the population of Noja PMAR.
Event logs from all PMARs will be collected automatically, removing the need to drive to site, so
that there are no delays in getting data. There will be central storage of event logs and a
summary analysis of PMAR activity with the dashboard showing a league table of operations.
Page 15 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
If the fault current passing through any network ever exceeds its designed fault level there is a
possibility that the switchgear will fail disruptively. This is highly undesirable, at best the failure
will necessitate the switchgear is replaced which will likely result in prolonged customer outages,
however, of even greater concern is the potential for the failure to impact upon the health and
safety of persons within the proximity of the substation.
Because of these reasons it is vital that DNOs ensure the network fault level is not exceeded. At
present this is done using established connection rules and more often through network
modelling packages such as IPSA and DigSILENT. These fairly complex models are built by
experienced engineers and can take several days to build, however, despite their complexity
every model will have some assumed parameters, particularly regarding the fault level
contribution customers have. Whilst this approach will continue to serve DNOs well, due to the
expected challenges faced by the network in the future it would be prudent to have an
alternative method, particularly one that would complement existing models.
The remaining stage of the project will concentrate on the revision of the final version of the
FLMs firmware, the development of its user interface and the production of support literature. It
is also hoped that a suitable test facility can be identified to complete definitive tests on the FLM
against a known fault level.
• To validate and refine existing system analytical models by obtaining visibility of actual
system fault levels and contributions from customer equipment under a wide range of
real-world scenarios
• The identification of the fault level in areas of network where network modelling may be
difficult or problematic, e.g. sections of the 11kV or Low Voltage network.
Page 16 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
• The Health and Safety benefits of identifying and subsequently managing fault level
issues which were previously unknown due to inaccurate or non-existent models.
• Operational benefits that are gained from the ability for optimal operation or
interconnection of the network which could be restricted due to a perceived fault level
issue.
• Financial rewards associated with an improved Regulatory Performance rectifying fault
level issues, e.g. removal of perceived fault level issues by accurate monitoring as
opposed to conventional equipment-based solutions.
• New Connection – the benefits associated with facilitating new network connections
which previously may have been problematic or financially prohibitive due to modelling,
scenario and data inaccuracies.
• Environmental benefits associated with the connection of renewable generation as
detailed above and the moth-balling of equipment ahead of its end of life due to fault
level upgrades.
Page 17 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Page 18 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Cost Breakdown
As SP Energy Networks operate distribution and transmission licenses for the SP-D, SP-M and
SP-T areas, successful developments relating to distribution and/or transmission assets
undertaken in one part of the business will equally apply to the other. In line with this, costs
have been split against each licence based on the turnover and hence size of each network
area.
Projects identified as only applying to one licence, or ones that apply in favour of one, two or
all three licences have been scaled accordingly (See Table A1). This is defined when the
project inception document is developed.
NB. Whilst an NPV calculation if possible for any project, and across any of these areas, it is
recognised that as the assessment looks further to the future (as is the case for strategic
projects), the benefits are more susceptible to risk, more uncertain, and consequently less
robust.
Page 19 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
As of 31st March 2012 the status of the 40 projects reported as well as those that have
stopped is detailed below.
This breakdown accounts for reasons why not all projects have significant external spend.
Expenditure
Overall
£ Investment
External
Internal
Page 20 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Page 21 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Page 22 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Expected Benefits of If successful projects in this Module may increase the performance and
Project reliability of cable networks
Expected Timescale to Range 1-5 years - Duration of benefit Range 3-5 years -
adoption dependent on project once achieved dependent on project
Page 23 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Expected Benefits of If successful projects in this Module may increase the performance and
Project reliability of cable networks
Expected Timescale to Range 1-2 years - Duration of benefit Range 3-5 years -
adoption dependent on project once achieved dependent on project
Page 24 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Expected Benefits of If successful projects in this Module may increase the performance and
Project reliability of substations
Expected Timescale to Range 1-4 years - Duration of benefit Range 1-6 years -
adoption dependent on project once achieved dependent on project
Page 25 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Project Title IFI 0401 STP 5 Networks for Distributed Energy Resources
Expected Benefits of If successful projects in this Module may increase the performance and
Project reliability of substations
Expected Timescale to Range 1-3 years - Duration of benefit Range 2-5 years -
adoption dependent on project once achieved dependent on project
Page 26 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Page 27 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Preliminary use of the device for fault location on persistent LV faults is expected to:
• Reduce the number of repeated fuse replacements
Expected Benefits of
• Minimise the number of joint holes
Project
• Remove the fault from the system in a shorter timescale than traditional ‘cut-and-
test’ methods
Project Progress The final stage of the project has now been completed with the units being rolled out
March 12 into the business
Potential for
achieving expected This project has now closed
benefits
Collaborative
Uk PowerNetworks, Electricity North West
Partners
R&D Providers Kehui (UK) Ltd, Nortech
Page 28 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Following on from this work, a collaborative project has been scoped between EDF-
Energy, Central Networks and SPEN to develop a product based on this principle for
the remote signalling of fault passage indication on OH networks.
Page 29 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Page 30 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
This project aims to design, develop and trial three 12kV Superconducting Fault
Description of project
Current Limiting (SFCL) devices on three different UK networks.
Internal £21,157 Internal £41,699
Expenditure for Expenditure in previous
External £64,033 External £388,693
financial year (IFI) financial years
Total £85,190 Total £430,395
Project Cost Internal £6,000
Projected 12/13 costs for
(Collaborative + £2,345,967 External £12,000
SPEN
external + SPEN) Total £18,000
The development of a non-linear ‘high-temperature’ superconducting ceramic in
series with a circuit breaker for the clamping and clearance of fault energy.
When the material is operated at below its critical temperature it loses all electrical
resistance, thereby allowing load current to flow with negligible losses. Either the
increased current density caused by fault current, or the loss of cooling medium
(liquid nitrogen) causes the temperature of the superconducting material to rise and it
reverts to a normal resistive state.
Technological area
and / or issue Being a solid state device, the SFCL has been proven to operate in a few milliseconds,
addressed by project after which the impedance remains high until the fault is cleared by conventional
means (protection operated circuit breakers, fuses, etc.). The SFCL’s operation is
sufficiently fast to ensure that the first peak of the fault current is limited. The
subsequent limited current can be set to suit a specific application.
Three devices (one per DNO) will be constructed and installed covering a range of
applications: transformer tails, bus section, interconnected network connection. The
successful completion of this project is likely to pave the way for higher voltage
devices.
Technological
Type(s) of innovation Incremental Significant Radical
substitution
involved
No Yes No No
To develop, understand and address the issues associated with the connection of an
11kV fault current limiting device to the network.
Expected Benefits of Successful trials will result in the development of commercially available devices that
Project are capable of clamping fault levels to within network design limits. Once proven, this
will open up another option for tackling network fault level, potentially providing an
alternative to network reinforcement.
£-267,191
(Present Benefits x Probability of Success) – Project NPV is negative due to the
Project NPV
Present Costs low TRL / high costs upon
commencement
Page 31 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Project Progress Work has now been carried out at Ainsworth Lane to install the FCL. The energisation
March 12 date is now going to be August 2012
Potential for
Learning from this project will be able to help SPEN make strategic decisions on the
achieving expected
future of fault level management
benefits
Collaborative
Electricity North West, CE Electric UK, Applied Superconductor Ltd
Partners
Page 32 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
This project is to investigate active voltage control to increase the efficiency of the
network and facilitate the connection of distributed generation. More specifically
Description of project
it is to undertake field trials of the Fundamentals SuperTAPP n+ automatic voltage
control (AVC) relay and develop associated modelling criteria for network planners.
Internal £13,410 Internal £40,069
Expenditure for financial External £996 Expenditure in previous
External £97,944
year (IFI) financial years
Total £14,405 Total £138,013
Project Cost Internal £0
Projected 12/13 costs for External £0
(Collaborative + external £254,206
SPEN
+ SPEN) Total £0
Technological
Type(s) of innovation Incremental Significant Radical
substitution
involved
Yes No No No
• Enabling the connection of distributed generation using a simple solution
which requires minimal network modification;
• Improving the voltage profile of supply;
Expected Benefits of
• Reducing the requirement for network extensions or reinforcement and
Project
increasing the capacity for the connection of distributed generation; and
• Reducing the risk of voltage being outside statutory limits and thus damaging
equipment and injuring personnel.
Expected Timescale to Duration of benefit once
<2 Years 10 Years
adoption achieved
TRL Development (Start – Current)
Probability of Success 75% 1 2 3 4 5 6 7 8 9
Collaborative Partners Central Networks, Scottish & Southern Energy, Electricity North West
Page 33 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Page 34 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Page 35 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
This project will develop a portable PD monitoring product that can be moved around
the network, as tool in the prioritisation in cable replacement.
Internal £7,419 Internal £20,444
Expenditure for Expenditure in previous
External £61,941 External £72,232
financial year (IFI) financial years
Total £69,359 Total £92,676
Internal £5,000
Project Cost
Projected 12/13 costs for
(Collaborative + £160,000 External £13,000
SPEN
external + SPEN)
Total £47,650
This project will develop partial discharge monitoring hardware which will initially be
tested on the SP 11kV network with the following aims:
• To develop a suitable portable monitoring solution with the ability to identify any
cable sections which are emitting a level of discharge, which could lead to faults in
the short term. The portable monitor will allow SP to test for a period of a few
minutes to many weeks.
Technological area
• Following initial testing in 10 primary substations, partial discharge mapping of
and / or issue
those cable sections, which are registering the highest level of discharge, will be
addressed by
undertaken.
project
• Based on the PD maps obtained, any areas of concentrated PD activity, which are
identified as critical, will be subject to review and selected cable sections will be
replaced. The cable/joints removed will then be tested to validate PD test results.
It is planned that the test results will be collated in a database, which, in conjunction
with results from the testing carried out by other UK DNOs, will allow for advancements
in the knowledge rules for future PD testing technology.
Technological
Type(s) of Incremental Significant Radical
substitution
innovation
involved No Yes No No
• Developing PD monitoring techniques and understanding of PD activity with respect
to cable degradation will assist with cable replacement decision-making. It will also
Expected Benefits
aid justification and prioritising of capital spend.
of Project
• Anticipated key benefits will be in the area of CML and CI improvements and cost
savings through targeted cable section replacement programmes.
Expected
Duration of benefit
Timescale to 1-2 Years 5 Years
once achieved
adoption
TRL Development (Start – Current)
Probability of
50% 1 2 3 4 5 6 7 8 9
Success
Page 36 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Work is been carried out to analyse the top 20 worst performing circuits in SPM and SPD
Project Progress
for faulted cable section so that a more targeted application of cable monitoring can be
March 12
carried out.
Having correctly verified sources of PD in cable and identified cables with PD in the area
of concern, the next stage is to monitor the top 20 most problematic circuits in both
Potential for
SPM and SPD.
achieving expected
benefits
If these cable sections are found to have high levels of PD it is planned to identify
location of PD section, expose cable section and replace with healthy cable.
Collaborative
N/A
Partners
R&D Providers HVPD (Formally IPEC HV)
Page 37 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
The aim of a Low Voltage Automation (LVA) project is to provide a trial system on
Scottish Power Energy Networks (SPEN’s) LV network, which will prove the benefits of
implementing a larger scale LVA system across the LV networks. The trial system will
Description of consist of one LVA CCU (modified old CCU) and one phase LVA switch.
project It is two major parts that will be validated in the project. The first one is the
communication from the control point to the LVA switch. The communication
technique will be the Power Line Communication (PLC). The second part is the
mechanical behaviour and the control of the Magnetic vacuum Switch from EPS.
The Low Voltage networks contribute ~11% CI and ~15.5% CML between the SP-D /
SP-M networks (taken from 2003/04 NaFIRs report).
Technological area • Both proposals aim to produce, install and test prototype systems on a trial
and / or issue network, providing a proof of concept and evaluating performance of the
addressed by project installation on the LV distribution network.
• Application will be to focus on high customer density, worst performing LV
circuits.
Technological
Incremental Significant Radical
Type(s) of innovation substitution
involved
No Yes No No
Page 38 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Due to problems with the supplier Radius, this project has been delayed. Work has
continued with the switching device through EPS.
Project Progress
March 12
A production run of 9 units have been manufactured and are awaiting installation on
the network on a trial basis.
Having proved the LVA could perform in this environment, coupled with the control
Potential for
and network behaviour data capability, we have now embarked on a continuation IFI
achieving expected
project to further develop this prototype into a final product that will enable the
benefits
Smart Grid concept.
Collaborative
None
Partners
R&D Providers RADIUS
Page 39 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Research activities will seek to realise business benefits across a range of areas
Expected Benefits of including system performance, OPEX and CAPEX. Key areas have been identified in
Project the SPARC proposal, which are being used to form the basis of a more comprehensive
programme of deliverable projects.
TBC
(Present Benefits x Probability of
Project NPV In development for the core projects in each
Success) – Present Costs
workstream
Page 40 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
‘Investment Strategy’ Theme: Automated analysis of SCADA data and digital fault
records for analysis of power system protection performance
• Develop, implement and test a prototype Post-Fault Protection Performance
Analysis Suite:
1. The prototype is currently within the final testing stage with testing
conducted on an ongoing basis. The storms of January 2012 have become the
final case studies and the preliminary results produced by the prototype are
currently available for validation.
2. Updates carried out to web-front end to improve performance and carry out
general view improvements.
3. Writing and drafting of journal paper for submission in March/April 2012.
‘Investment Strategy’ Theme: Smart Power Network Asset Management Strategies
and Tools
• Develop a method to optimise targeting of investment for asset replacement over
a given period of time.
1. Investigated existing approach to asset investment planning, including
identification of constraints.
2. Investigated Markov Chain asset deterioration modelling technique.
3. Investigated optimization techniques for application to investment planning.
Project Progress
4. Selected, applied and evaluated suitable optimisation technique to specified
March 12
assets.
5. Developed and tested ‘proof of concept’ application of selected optimisation
approach for asset investment planning. This involves development of
spreadsheet tools to test the ‘proof of concept’.
‘System Development’ Theme: Optimal Distribution Network Architectures
• Develop algorithm and tool for network reconfiguration for loss and reliability
optimisation prototype:
Page 41 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Page 42 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
• The ‘Automated analysis of SCADA data and digital fault records for analysis of
power system protection performance’ PhD project of the Investment Strategy
theme is expected to deliver significant enhancements to the PEDA system
developed from previous research conducted by the University of Strathclyde in
collaboration with SPEN protection engineers. Following discussions with SPEN
and Iberdrola, the focus of this work changed from that originally defined to
ensure that the proposed system leverages the network and protection scheme
information now available from the newly developed ‘Protection Database’. The
use of accurate representations of network and scheme connectivity will
significantly improve the reliability and accuracy of the protection assessment
output delivered and offer valuable decision support to protection engineers.
• The ‘Smart Power Network Asset Management Strategies and Tools’ PhD project
of the Investment Strategy theme will develop a methodology involving asset
deterioration modelling and optimisation techniques to enable asset managers to
establish desirable optima balancing of asset health, risk and investment,
providing a more robust scientific basis for justifying asset investment. In addition
to optimizing the level of investment required to manage risk satisfactorily, the
methodology will also attempt to identify which assets provide the best return on
investment, in terms of risk management.
• The ‘Optimal Distribution Network Architectures’ PhD project of the System
Development theme is expected to deliver a method of minimising network losses
Potential for
by actively managing power flow through network reconfiguration within
achieving expected
operational, planning and design timescales. The research will search for an
benefits
optimal solution that respects multiple objectives, i.e. the need to minimise losses
without compromising reliability, while respecting network constraints, e.g. fault
levels. This will allow SPEN to implement operationally ‘smarter’ and more cost
effective solutions to minimise active power losses as an alternative to costly
network reinforcement.
• The ‘PD Diagnostics in MV Cables’ PhD project of the Asset Technology theme is
expected to deliver a cost effective method of detecting partial discharge present
in medium voltage cables. This phenomenon is responsible for the degradation of
cable insulation and ultimately failure. Using existing protection CTs to also
perform a secondary function as PD cable sensors affords asset managers with an
unprecedented level of cable PD monitoring capability across the network,
without the need to develop or install dedicated PD cable sensors. It is expected
that this PhD will prove this concept while further work will be required to assess
the robustness and commercialisation prospects of this approach.
• Key SPEN personnel are engaged at technical and strategic levels though regular
project meetings and SPARC strategy meetings to ensure that research is
progresses along the TRL development scale towards deployment within the
organisation. In addition, a key function of these strategy meetings (involving all
SPARC personnel, and held bi-annually) is to ensure that the pipeline of
prospective research projects is maintained and that they remain relevant to the
strategic objectives of SPEN.
Collaborative
N/A
Partners
R&D Providers University of Strathclyde
Page 43 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
FlexNet is a four-year EPSRC funded programme that takes forward the process of
preparing electricity networks for a low carbon future and builds on an initial
programme of works, FutureNet that is nearing completion.
Description of The programme recognises the interdependence of many factors in achieving change
project through its integration of the work of internationally recognised researchers from
disciplines such as social psychology, economics, power systems analysis, power
systems technology and public policy and the long-term, radical nature of the changes
needed and is not dependant on any particular form of generation
Page 44 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
The project has completed its 4-year programme (plus an extension period to close out
a small number of the PhD projects). All work streams essentially completed their
programme of work. As with any large R&D project, some task were modified in the
light of results that emerged including the termination of unpromising avenues of
Project Progress research and the refocusing onto others. Conclusions have been drawn in all areas and
March 12 the work written up for academic use and presented and demonstrated for research
users. The training programme completed a series of discipline crossing training courses
and industrial placements undertaken for researchers. The annual report to RCUK gives
a more detailed account of progress and outcomes. Many outcomes are written up at
www.supergen-networks.org.uk
The breadth of FlexNet gives confidence that several of its activities will have enduring
Potential for benefits. All the research partners have strong relationships with the DNOs/TSOs
achieving expected through which to pursue the ideas to higher TRLs and make them part of the network
benefits planning option set of the future. The ideas will also be pursued with
equipment/software vendors and be subject of further research.
Collaborative EPSRC, National Grid, Scottish and Southern Energy, Central Networks, EDF Energy
Partners Networks, SP Energy Networks and CE Electric UK
University of Bath, University of Birmingham, University of Cambridge, Cardiff
R&D Providers University, University of Durham, University of Edinburgh, University of Exeter,
University of Manchester, University of Strathclyde and Imperial College London.
Page 45 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Internal £4,000
Projected 2012/13
Project Cost £260,980 External £26,380
costs for SPEN
Total £30,380
The LVSure system comprises a source breaker, the Intelligent Fuse Unit (IFU); plus a
number of mechanical isolating switches, or Intelligent Link Units (ILUs) installed at
strategic positions along the LV circuit.
Isolation of the faulted section and restoration of supply to un-faulted sections of the
circuit is fully automated and does not require communication between the devices
which comprise the LVSure system.
Technological area When a fault occurs on the LV network the IFU disconnects supply to the entire
and / or issue circuit. The ILUs along the route, sense no voltage and automatically open, in effect
addressed by project sectioning the circuit. Both the IFU and the ILU incorporate sensing circuitry which
tests for the presence of a fault on the electrical section downstream of each Unit.
The IFU would commence the restoration process by testing downstream and if
healthy would restore supply to the first section. Each ILU in turn would initially sense
it has an incoming voltage, then test downstream and again, if healthy, restore
supply. This would continue until the faulted section was reached when testing would
inhibit the ILU from closure. Circuits with an alternative supply from a remote end
could complete the restoration process until all sections had supply restored except
the faulted section.
Page 46 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Page 47 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Page 48 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
PURL2 will make use of four measured parameters to increase measurement accuracy
and reduce uncertainty. The techniques used for all measurements will have no more
effect on the surface of the pole than standard climbing spikes so minimising ongoing
maintenance requirements. All measurements will also be time and location stamped
which, when combined with wired and wireless connectivity, will allow integration
into field and office based asset management systems.
PURL 2 will represent a real advance on the current technology available and should
result in more efficient, more accurate and less damaging condition assessment of
wood poles. The benefits of this should be:
Expected Benefits of
• Better use of inspection team resource
Project
• More effective identification of failing poles and therefore:-
• Reduced failure of wood poles which will result in:-
• Reduced CMIs/CLs, which in combination with the above will result in:-
reduction in overall cost
Page 49 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Potential for
Project started in September 2011, potential for achieving expected benefits as per
achieving expected
above probability of success.
benefits
Project Progress to Stage One of the project to develop a PURL2 prototype has started. Four of the six
March 12 tasks of stage one have been started.
Collaborative
SP Power Systems, SHEPD, Energy Innovation Centre
Partners
R&D Providers EA Technology Limited
Page 50 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
The project will seek to develop a software model that will analyse the relationships
between key environmental variables (including the potential impact of climate
Description of project
change) and vegetation growth rate, for different vegetation types. The model will be
used to consider the costs and benefits of undertaking vegetation management to
different specifications.
Following tree cutting at selected sites the model will be validated against the first
year of growth data, which will be determined by laser measurement. The model will
subsequently be optimised based on annual growth rates determined over a further
three-year period.
Internal £11,863 Internal £21,376
Expenditure for Expenditure in previous
External £6,848 External £351,537
financial year (IFI) financial years
Total £18,710 Total £371,914
Project Cost Internal £0
Projected 12/13 costs for
(Collaborative + £1,744,000 External £0
SPEN
external + SPEN) Total £0
• This project is a UK wide study into the differing growth rates experienced in the
26 “bio-climatic” zones that are found across the country.
• It will involve cuts made to 2000 sample areas across the identified zones to a
Technological area
common specification, followed by monitoring to confirm growth.
and / or issue
• The output is expected to lead to modelling software that can portray different
addressed by project
cut cycles.
• The common UK project should provide further evidence / justification in future
Price Control Reviews.
Technological
Type(s) of innovation Incremental Significant Radical
substitution
involved
No Yes No No
• The model developed will identify areas that will require more frequent tree
cutting to maintain safe clearance distances and meet legal requirements.
• Evidence-based decisions on the frequency and location of tree cutting will
Expected Benefits of
enhance network resilience and therefore improve security of supply and
Project
associated regulatory performance (CI and CML savings).
• Improved targeting of OPEX may be realised through proactive cutting and
extending the cutting cycle in high and low growth areas respectively.
Expected Timescale Duration of benefit once
2 Years 20 Years
to adoption achieved
TRL Development (Start – Current)
Probability of Success 75% 1 2 3 4 5 6 7 8 9
Page 51 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
A full report describing this four year project and its findings was issued in February
2012. The work undertaken determined the average annual growth rate of vegetation
with respect to utility space, the physical volume occupied by a utilities facilities and
the additional space required to ensure its safe and reliable operation, degradation
(USD). Regional variations in USD where calculated with sites located in the warmer
Project Progress
areas of southern England, experiencing the average highest rates of vegetation
March 12
growth and the lowest observed at relatively cooler ScottishPower sites in Scotland.
The impact of Climate change predictions out to 2080 on USD across the UK were
considered along with different species growth rates. These and other variables that
impact the vegetation growth rates were included in a software model that can be
used to shape future vegetation strategies in utility areas.
Collaborative Electricity North West, Scottish and Southern Energy, Central Networks and National
Partners Grid.
R&D Providers ADAS
Page 52 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Page 53 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Technological
Incremental Significant Radical
Type(s) of substitution
innovation involved
Yes Yes No No
Earthing Project:
High. The results from tests and simulations can be used to propose a recommended
procedure for measuring transfer potential between HV and LV systems, suitable for
inclusion in a DNO policy document.
£255,876
(Present Benefits x Probability Note – Project costs include implementation and
Project NPV
of Success) – Present Costs have been calculated by the ENA assuming a typical
distribution license area.
Work on the Harmonic Impedance Modelling (G5/4) will help DNOs understand
harmonics issues on distributed networks and produce a revised revision of G5/4. The
Potential for Earthing Transfer Potential projects will assist transmission operators to understand
achieving expected earthing issues in differing situation.
benefits
The remaining projects are still in progress and it is hoped they will demonstrate the
benefits explained.
Collaborative National Grid, ScottishPower Energy Networks, Scottish and Southern Energy, Electricity
Partners North West, Western Power Distribution, Northern Powergrid
TNEI, Engage Consulting Limited, Imperial College London, Met Office,
R&D Providers
EA Technology Ltd, Earthing Solutions, KEMA, Redpoint Energy
Page 54 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
rd
Project Title IFI 0711 - 3 Party ROEP Risk Assessment
The development of the so-called ‘Stage I’ for risk assessment of earthing systems,
using a new concept of safety limit curves, where standard fault clearance times
are used, was achieved under National Grid research project NSETS180 in
collaboration with Scottish Power, and was completed in Autumn 2006. The Stage
I risk assessment enables broad classification of substations into low/high risk
categories for Rise of Earth Potential (ROEP). The theoretical studies to develop a
Stage II probabilistic-based risk assessment, which includes the use of historical
operational clearance times, are now under development at Cardiff University.
Description of project
In this project, it is proposed to conduct pilot studies, which allow initial
implementation of the developed ‘Stage I’ technique at identified key National
Grid substations (4 to 5 sites). This will allow a refined quantification of risk in
relation to the ALARP levels. In addition, a user-friendly procedure will be
developed to allow easy and quick assessment of sites. The ultimate purpose of
the research is to provide better information to engineers making decisions on
investment for earthing reinforcement schemes.
Internal £ 10,000
Projected
Stage 1 - £100,000
Total Project Costs 2012/13 costs External £40,000
Stage 2 - £150,000
for SPEN
Total £ 50,000
Technological area and / This software package will allow SPEN to assess current sites to determine
or issue addressed by whether or not there is a touch/step issues within the substation and a danger of
project third party exposure to ROEP.
Project Benefits Project Residual Overall Project
Type(s) of innovation Rating Risk Score
Incremental
involved
7 -3 10
There are many sites in Scotland and Manweb where the existing sites do not have
earthing that has been installed to the current standard. System fault levels have
been increasing due to the significant amounts of renewable generation that has
been connected (with bigger schemes in the construction and planning stages). If
current system fault levels are applied to these sites there is a potential that the
touch/step voltage levels will be too high to allow work to commence without
further costly mitigation measure being implemented. This tool would allow an
Expected Benefits of assessment to be made of what the probability would be of a life-threatening fault
Project appearing at the substation so that the appropriate corrective action can be taken.
The user friendly interface package will allow SPEN staff to carry out assessments
of earthing systems using statistical fault levels and clearance times values as
opposed to worst case.
By being better equipped to assess the potential risk posed by existing substation
earthing arrangements appropriate steps can be taken, which could be the
avoidance of unnecessary expenditure on inappropriate mitigation measures.
The software analysis will help to justify Third party mitigation measures.
Page 55 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Potential – The project is progressing to a next stage where the following items
will incorporated into the software:
Potential for achieving
• Set up of fault clearance time database
expected benefits
• Calculate variation in fault current magnitude and its effect on prediction of
individual risk
• Apply extended computer procedure to several case
This project is now complete. Follow up research works have been commissioned
and agreed (April 2012) with Cardiff University to investigate the following:
Project Progress March
1. Apply the approach developed in this study to the following situations:
2012
• Potentials exported out with the substation.
• Locations or point within the substation.
2. Update the software for revised IEC/CENELEC standards.
Cardiff University High Voltage Energy Systems research group (Manu Haddad &
R&D Provider
Huw Griffith).
Page 56 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
st
Project Title IFI 0712 - BT 21 Century Protection Solutions (BT21CN)
The change of BT’s network to an IP based system (BT21CN) is posing some significant risks
to the performance reliability of the SP-M and SP-D electricity networks. In particular SP-M
rd
relies heavily on 3 Party leased services from BT as the communications for the 33kV
network protection in rural areas. The strategy to mitigate the problem has been
developed based on the utilisation of a range of communications solutions (fibre, radio,
Description of project power line carrier in addition to technically/commercially suitable BT services) in a
coordinated manner. Whilst this strategy has been agreed in principle, there are several
technical challenges associated with several of the solutions.
This project aims to provide the detailed and engineered communications channels that
underpin the toolbox of solutions to mitigate the problems associated with BT21CN.
Internal £14,408 Internal £ 66,254
Expenditure in
Expenditure for
External £26,305 previous (IFI) financial External £ 197,724
financial year
years
Total £ 40,713 Total £ 264,005
Internal £0
Projected 2012/13
Total Project Costs £114,000 External £0
costs for SPEN
Total £0
This project aims to access the feasibility of using alternative communications solutions to
mitigate the problems associated with BT21CN. Scope currently under consideration
includes:
Technological area
• Power Line Carrier deployment at 33kV combining protection and SCADA signalling
and / or issue
• Small development works to facilitate intra-substation communications
addressed by project
• IP based protection signalling mediums and associated security implications
• Options for alternative communication channels for shared services
• Implications for the network in no cost effective solutions are realised
Project Benefits
Project Residual Risk Overall Project Score
Type(s) of innovation Significant / Rating
involved Technology Transfer
21 2 19
There are many sites in SP-M where there is no Line-of-Site for radio communications and
fibre installations are extremely expensive due to excessive circuit lengths. In such sites
Power Line Carrier (PLC) or Leased services are the only feasible communication mediums
for protection signalling. PLC is typically deployed at higher voltage levels, additionally
some development work facilitated in a trial would be required to accommodate
protection and SCADA data on the same link however this could deliver a more cost
effective alternative to fibre or BT SDH leased services. Power Line Carrier although a viable
Expected Benefits of solution has some limitations, which restrict its use on the network, mainly mid-circuit
Project transitions (OHL – Cable), which cause the signals to reflect. Where PLC cannot be
deployed alternative will require consideration.
Leased services (or no communications at all) are the only alternatives to expensive
infrastructure at some sites. SDH services can be expensive in terms or both CAPEX and
OPEX. BT are likely to offer IP based products in the future (products not currently used
with protection). If development is carried out to facilitate the use of IP based products for
signalling purposes factoring in security considerations then it may be possible to leases
services at significantly reduced CAPEX and OPEX costs.
Page 57 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
In areas of the network where protection signalling cannot be delivered via channels
Potential for currently considered for use with protection devices without significant expense, leased
achieving expected communications are the only option. Should a suitable leased or alternative
benefits communication bearer be unavailable then significant investments in fibre optic installation
will be required.
In accordance with the output from the Desktop and Line-of-Sight Surveys, Airwave has
provided the Teleprotection circuit between substation sites located at Kilbirnie and
Stewarton.
The circuits have been provided by dedicated multiplexed channels offering a bandwidth of
64Kbps. The circuit has been designed such that the expected latency should be not greater
than 30 milliseconds.
At each end of the circuit, a 1.4GHz narrow band radio link was used from the SPEN’s
Project Progress
premises to the most suitable Airwave Base Station, and thenceforth across the Airwave
March 2012
network to the other substation site.
The technical trial of Airwave has concluded however there are significant commercial
issues with the productisation of the service by Airwave that have precluded further
deployment. The next phase of the project is to establish the feasibility of low cost fibre
solutions; so far the use of fibre in sewer pipes has been explored via a desk top exercise
with Scottish Water. Unfortunately only sewer pipes of a significant diameter can be
considered, these are typically within urban areas SPENs BT 21CN requirements are
typically within rural areas and hence there are little or no synergies.
Page 58 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Project Title IFI 0713 - Wide Area Monitoring, Protection & Control (WAMPAC) for GB and IRL
Market driven grid management has increased the number of renewable/distributed
generation sources, introduced complexities to address reactive support and
progressively stress transmission networks. This has increased the complexity of
operation, monitoring, control and protection of large interconnected electric power
systems considerably. The penetration of renewable generation is increasing and
there are targets set for connection of future renewable sources. At the same time
the Transmission Owner (TO) is faced with an increasing need for construction
outages to deliver network reinforcement and existing asset replacement which will
result in reduced circuit availability. These factors will lead to much less predictable
operating scenarios and therefore greater dependence on real-time support tools to
observe and manage the condition of the network.
Description of project
The increase in this uncertainty could result in transmission instability in the near
future, however Wide Area Measurement Systems (WAMS) employing SynchroPhasor
Measurement Units (PMUs) are becoming increasingly deployed world wide as a cost
effective commercially available technology. A trial using the Psymetrix Phasorpoint
Monitoring System will be installed to gather data from up to 15 sites with PMU
capability. This will involve the installation of Psymetrix software on a server that will
connect to the PMU's and recover in real time phasor data. This data will be stored for
post transient evaluation so that system performance can be analysed and determine
the frequency modes present in the network. A WEB interface will be installed at the
Operational Control Centre (OCC), Cambuslang and Bellshill to evaluate the real time
delivery of the data and visualise the system performance in real time and post event.
Internal £ 7,419 Internal £ 16,537
Expenditure for Expenditure in previous
External £ 62,339 External £ 5,060
financial year (IFI) financial years
Total £ 69,757 Total £ 21,597
Internal £5,000
Projected 2012/13 costs
Total Project Costs £ 59,715 External £ 27,000
for SPEN
Total £ 32,000
SPT is obliged under its licence and the Electricity Act to develop an efficient, co-
ordinated and economic system of electricity supply.
Power-grid congestion issues and disturbances worldwide have emphasized the need
Technological area
to enhance power grids with smart applications (SmartGrids, Flexnet, and Intelligrid),
and / or issue
providing decision support to operators and automation to ensure optimum use of
addressed by project
assets, whilst maintaining system security and plant and circuit thermal limits. This
work will support the development of next generation data and communications
infrastructures for smart applications.
Project Benefits Project Residual Overall Project
Type(s) of innovation Rating Risk Score
Incremental
involved
13 -9 22
Page 59 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Page 60 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
This proposal is twofold, to develop, test and commission the IEC Protocol on the
Microsol RTU to allow us to trial interfacing to two specific devices at two
specific locations, namely:
At Busby 275kV we propose to recover all the Analogue information from the
fault recorder, this will allow us not only to present more information to the
Control Engineers in real time, it will eliminate any issues with faulty transducers,
faulty resistor scaling and faulty wiring.
Technological area and Project 2 (IFI 0801-2) - University of Manchester and NGC
/ or issue addressed by
project This IFI application aims to investigate, quantify and optimise the level of
security, dependability and speed in secondary schemes using IEC 61850. This
project is strategically aligned with Iberdrola Networks and will provide
procurement benefits.
Project3 (IFI 081-3) – “Hardfibre” Process Bus Field Trial & RTDS Testing
GE Multilin are first to market with IEC61850-9-2 products and the proposal is to
undertake a field trial at the new Inverarnan 275kV substation and to perform
RTDS testing of the scheme. This will achieve the following objectives:
Proof that the protection performance of a process bus system is at least equal
to conventional schemes
To gain experience of the installation, configuration and operation of a process
bus system.
To measure the time and cost benefits of process bus.
Page 61 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
No NPV calculated
Project NPV (Present Benefits x Probability of Success) – Present Costs
for this limited trial
The University project Evaluation of IEC61850-9-2 Process Bus and Its impact on
Substation Protection and Control Reliability is now coming to a close with the
Potential for achieving final report due mid 2012.
expected benefits
It is hoped than the learning from the project will give guidance on SPs direction
in the use of IEC61850
Project Progress March Project 1 and 3 are now closed and have proven to be successful. There is still
2012 some work to be carried out to fully integrate within SPENs networks
Collaborative Partners Project 1 and 3 none, Project 2 Manchester University, SSE, NGC
Page 62 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Project Title IFI 1001 – Offline Planning Tool for Dynamic Thermal Rating
The dynamic thermal rating (DTR) concept is based on the observation that the first
limit for the current carrying capacity of a circuit is its temperature, influenced by its
ability to dissipate to the environment the heat produced by the joule effect, and by
Description of project external conditions such as ambient temperature, or wind speed, which are
constantly varying. Even though the mechanisms of heat exchange involved are well
understood, determination of the correct value of the circuit temperature is non-
trivial. For this reason, static ratings based on the worst case scenario are often used.
Internal £17,539 Internal £6,092
Expenditure for Expenditure in previous
External £10,186 External £11,700
financial year (IFI) financial years
Total £27,724 Total £17,793
Internal £3,000
Projected 12/13 costs for
Project Cost £121,500 External £10,000
SPEN
Total £13,000
The implementation of a DTR system in an electrical network could potentially
increases its average rating whilst also reducing, the risk of component thermal
overload. However, successful implementation requires a number of challenges to be
overcome. Not least the measurement, estimation and communication of real time
component temperatures and prevailing weather conditions over a wide geographical
Technological area area containing a significant number of power system components distributed around
and / or issue a complex terrain.
addressed by project
A successful DTR system could be used as a decision support tool for Distribution
Network Operators (DNO). This tool could be used both at the planning stage and in
real time within potential future active network management philosophies in order to
safely increase the utilization of power systems and facilitate distributed generation
(DG).
Technological
Incremental Significant Radical
Type(s) of innovation substitution
involved
No No Yes No
Durham University are already working with Scottish Power and Astrium on a TSB
project to investigate the use of DTRs for electrical distribution networks in order to
accommodate increased levels of DG safely and cost effectively.
The aim of this phase of the work is to carry out further research and development
work to build upon the achievements so far, ensure continuity and to avoid the loss of
vital knowledge gained by the PhD researchers. The primary deliverable will be an
offline tool to:
Page 63 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Page 64 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
PV Penetration study – a study and working tool has been developed to enable
planners to quickly assess the impact of connecting small scale PV in housing estates
Project Progress
in the Manweb area. This report has now been delivered along with an Excel based PV
March 2012
voltage rise tool that has been used by SP Manweb to allocate >2,000 ‘clustered’ PV
installations.
Page 65 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Project Addition
The PV report and voltage rise tool has been used by SP Manweb to allocate >2,000
‘clustered’ PV installations delivering significant benefit to SP Manweb and the UKs
energy targets.
Collaborative
EDF, Areva, Rolls Royce and many other SMEs
Partners
University of Strathclyde (Lead), Imperial College, Oxford University, Cardiff
R&D Providers
University, University of Bath
Page 66 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Project Title IFI 1003 - Strategic Asset Lifecycle Value Optimisation "SALVO"
It is estimated that there is £200bn of identified investment requirements in UK core
infrastructure during the next 10-20 years and that evidence suggests up to 30% of
total asset life cycle costs could be avoided by better decision making. SALVO aims to
develop simple, flexible and practical guidance and tools for determining what to
spend and when.
The project will particularly aim at providing integrated solutions across the asset life
cycle and will provide a particular focus in the management of aging assets area.
Technological
Incremental Significant Radical
Type(s) of innovation substitution
involved
No Yes No No
Page 67 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Project Progress
This project is now closed
March 12
Potential for Improvement in the management of asset base is likely to lead to a reduction in risks
achieving expected of plant and equipment failure and increase safety for staff and members of the
benefits public.
Page 68 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Project Title IFI 1004 - Remote Access to Pole Mounted Auto Reclosers
The Noja pole mounted auto recloser incorporates a protection module, the MPM,
which can be accessed to retrieve active and historical data relating to both protection
activity and statistical metering.
This can only be accessed via an RS232 port within the Noja Control Panel that is
mounted below the Main Tank, out with the Safety Distance, and above the Anti-
climber. Access to this panel requires a specialist skill. It would a business and safety
Description of project advantage if additional functions of this equipment could be accessed without having
to ascend the pole.
The proposal from Nortech suggests that by adding an ‘Envoy’ module to a Noja,
remote access of the data within a Noja would be possible.
Nortech has proved that the ENVOY can talk to the NOJA, but this needs to be proved
in an operational situation.
Internal £14,878 Internal £0
Expenditure for Expenditure in previous
External £37,106 External £0
financial year (IFI) financial years
Total £51,984 Total £0
Project Cost Internal £10,000
Projected 12/13 costs for
(Collaborative + £76,800 External £25,000
SPEN
external + SPEN) Total £35,000
The project aims to address the issue of safe and automated remote access to active
and historical data from SPEN’s population of Noja PMAR.
Technological area
and / or issue
The project will enable circuits to be ranked accordingly to agreed performance
addressed by project
indicators e.g. circuits with most trips which could inform operational and
maintenance activities.
Technological
Incremental Significant Radical
Type(s) of innovation substitution
involved
Yes No No No
• Health and Safety benefit realised by negating the need to climb PMAR poles to
access information
• Automatic collection of all Noja PMAR event logs, removing the need to drive to
Expected Benefits of
site and consequent delays in getting data
Project
• Summary analysis of PMAR activity with dashboard showing league table of
operations
• Central storage of event logs
Expected Timescale Duration of benefit once
3 years 10 years
to Adoption achieved
TRL Development (Start – Current)
Probability of Success 50% 1 2 3 4 5 6 7 8 9
Page 69 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
There have been some issues around the communication between the Noja controller
and the Nortech envoy.
Project Progress
March 12
This issue should be resolved in early may and the 30 units should then be able to be
installed on the live network.
Potential for By being able to see system events almost real time, this should be able to give
achieving expected operational engineers an enhanced view of any abnormal events without having to go
benefits out on site.
Collaborative
None
Partners
Page 70 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
• The existing GeoField Network Map Viewer tracing engine will be configured to
allow tracing from a start point to a specified accumulated impedance value. This
will behave in an identical fashion to the existing length-based trace.
Expected Benefits of
• Integration to implement a scheme for SP Power Systems to allow PQRs to trigger
Project
autocomms for retrieval of fault records using email. This is required because SP
current IT policies do not allow modems to answer incoming calls and the only
way to retrieve data from recorders is to use autopoll, automatic or manual.
Expected Timescale Duration of benefit once
2 years 10 years
to Adoption achieved
TRL Development (Start – Current)
Probability of Success 50% 1 2 3 4 5 6 7 8 9
Project Progress This project has now finished, with the impedance mapping software being used
March 2012 within the control rooms.
Scottish Power own and operate 30 substation disturbance recorders from Embedded
Monitoring Systems (EMS) known as a sub.net device. Currently information can be
Potential for retrieved from the sub.net device either by using an inbuilt web interface, or by
achieving expected receiving e-mails sent by the device in response to events occurring on its monitored
benefits inputs.
By using the data from the 30 disturbance monitors we will be able to get a good idea
of the potential.
Collaborative
None
Partners
R&D Providers Sigma7
Page 71 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
It is proposed that the instrument could provide a viable alternative for fault level
Technological area and /
assessment to extensive modelling or at locations where upstream and
or issue addressed by
downstream fault level can vary drastically over a period of time making traditional
project
fault level analysis complex.
Technological
Type(s) of innovation Incremental Significant Radical
substitution
involved
Yes No No No
• Accurate fault level profiles for 132kV, 33kV and 11kV distribution sites,
showing both downstream and upstream contributions.
• The identification and remedy of fault level conditions previously unidentified.
Expected Benefits of • The release of network capacity previously unavailable due to perceived the
Project fault level.
• The deferment of investment on healthy equipment / network based on
perceived fault level issues.
• Validation and improvement of existing network models.
Expected Timescale to Duration of benefit once
<2 Years 10 Years
adoption achieved
TRL Development (Start – Current)
Probability of Success 75% 1 2 3 4 5 6 7 8 9
Page 72 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Potential for As of March the FLM is showing a high degree of promise and SPEN has confidence
achieving expected that the device will deliver accurate measurements. The initial results obtained have
benefits consistently been within 10% of the fault level produced from modelling packages.
Collaborative
Outram Research Ltd
Partners
R&D Providers Outram Research Ltd
Page 73 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
SPEN has taken out membership of the Electrical Power Research Institute (EPRI) in
order to gain technical guidance and expertise to support the 2020 Project. This
project will employ technologies that have not yet been used in GB and
membership of EPRI provides access to a wide range of technical documentation
Description of project
and expertise covering HVDC, Series Compensation and Wide Area Monitoring &
Control which feature in the 2020 proposals. EPRI provides a wide range of
information in other aspects of power engineering such as smart grids and asset
management.
Internal £11,465 Internal £0
Expenditure for financial External £97,931 Expenditure in previous External £0
year (IFI) financial years
Total £109,396 Total £0
Internal £12,000
£360k for 3 year Projected 2012/13 costs External £120,000
Project Cost
participation for SPEN
Total £132,000
Technological
Type(s) of innovation Incremental Significant Radical
substitution
involved
Yes Yes Yes Yes
• EPRI membership will give SPEN immediate benefits in terms of surveying the
technologies and application of these technologies in the areas of designing,
monitoring, controlling and operating HVDC links.
• SPEN individually or jointly with NationalGrid, can utilise EPRI expertise in the
Expected Benefits of
assessment of possible designs and solutions provided internally or by external
Project
companies.
• As well as the HVDC module, there are many other modules that can be of
considerable benefit to SPEN, such as in areas of wide area monitoring, losses
minimisation and smart grids.
Page 74 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Page 75 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
The aim of this project is to investigate the role of energy storage systems in smart
grids.
The need to investigate the role of electrical energy storage has been identified at
governmental level. The Parliamentary Renewable and Sustainable Energy Group
Description of project (PRASEG) inquiry into ‘Renewables and the grid: access and management’ cites
storage as a ‘possible solution for addressing variable renewable energy
generation’ and highlights the need for ‘Long- term, further research and
development’ and ‘clear political and regulatory signals’(PRASEG, 2010). In the UK
Low Carbon Transition Plan (HM Government, 2009) storage is included in the list
of key elements of a UK smart grid.
Internal £14,272 Internal £0
Expenditure for financial External £186 Expenditure in previous External £0
year (IFI) financial years
Total £14,457 Total £0
Internal £10,000
Projected 2012/13 costs External £15,000
Project Cost £326,000
for SPEN
Total £25,000
• Economic assessment with respect to traditional reinforcement options
• Identification of appropriate locations for energy storage systems
• Consideration of most appropriate sizes and capacities for energy storage
systems.
• Determine appropriate operating strategies for energy storage systems.
Technological area and /
or issue addressed by • Understand the effects of operating strategies on the ageing of the energy
project storage systems.
• Evaluate the current and future value of operating an energy storage system
to generate revenue through energy market arbitrage.
Technological
Type(s) of innovation Incremental Significant Radical
substitution
involved
Yes Yes Yes No
Page 76 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Good work has been carried out in identifying relevant network models that can be
Project Progress used to mimic the effects of storage. These networks range from rural networks with
March 2012 historical voltage issues to urban networks with high percentage of embedded
generation.
Potential for
It is hoped that the eventual output of the project will help Scottish Power plan
achieving expected
strategically how and where the optimum use of Energy Storage should be.
benefits
Collaborative
Electricity North West
Partners
R&D Providers Durham University
Page 77 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
The aim of this project is to remotely monitor partial discharge (PD) activity on a
275KV / 33KV transformer using a PD monitoring system supplied and installed by
Description of project
DMS Ltd. After a period of testing the transformer will be inspected to determine
the accuracy of the monitoring system in determining PD location.
Internal £8,750 Internal £0
Expenditure for financial External £76,421 Expenditure in previous External £0
year (IFI) financial years
Total £85,170 Total £0
Internal £7,500
Projected 2012/13 costs External £85,000
Project Cost £184,000
for SPEN
Total £92,500
Technological
Type(s) of innovation Incremental Significant Radical
substitution
involved
Yes No No No
• Detection and measurement of PD and logging, reporting and alarming for
continuous health checks on transformer condition.
Expected Benefits of • Research and Development in conjunction with Strathclyde University to
Project model the transformer tank and the internal construction and then using
triangulation techniques using the data from the PD couplers to determine the
location of any PD.
Expected Timescale to Duration of benefit once
<2 Years 10 Years
adoption achieved
TRL Development (Start – Current)
Probability of Success 50% 1 2 3 4 5 6 7 8 9
Page 78 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Technological
Type(s) of innovation Incremental Significant Radical
substitution
involved
Yes No Yes No
• The cable detection device can be used on both live and dead HV and LV
circuits and no current is induced in adjacent circuits.
• The requirement to excavate an LV cable to the nearest known service
Expected Benefits of
location is avoided.
Project
• Unnecessary customer interruptions are avoided.
• The number of open excavations and the associated risk to staff and public is
reduced.
Expected Timescale to Duration of benefit once
<2 Years 10 Years
adoption achieved
TRL Development (Start – Current)
Probability of Success 90% 1 2 3 4 5 6 7 8 9
Assuming that the trials of the cable identification devices and any required
Potential for achieving
upgrade work is successful then the potential for achieving the expected benefits is
expected benefits
high.
Page 79 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Technological
Type(s) of innovation Incremental Significant Radical
substitution
involved
No No Yes No
Page 80 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Page 81 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
The aim of this project is to gain an understanding and practical experience of the
processing of nanodielectric materials in order to develop a set of materials design
Description of project
and process rules to achieve the reliable production of high performance insulation
materials.
Internal £8,750 Internal £0
Expenditure for financial External £186 Expenditure in previous External £0
year (IFI) financial years
Total £8,935 Total £0
Internal £7,500
Projected 2012/13 costs External £30,429
Project Cost £104,980
for SPEN
Total £37,929
The understanding gained by this project and the materials design rules developed
Technological area and /
will feed into HV equipment design to achieve new high performance equipment
or issue addressed by
with significantly improved voltage and power ratings and potentially much
project
smaller size for the same rating.
Technological
Type(s) of innovation Incremental Significant Radical
substitution
involved
Yes Yes Yes Yes
• Increased continuous, switching and emergency current ratings.
• Higher power density equipment or smaller footprint assets.
• Longer insulation lifetime and insulation more tolerant to overloads.
Expected Benefits of • Enhanced flexibility in network operation.
Project • Greater resistance to power electronics system harmonics particularly in
systems containing HVDC technologies.
• Lower capital costs for civil works.
• Higher retained asset value and operational efficiency.
Expected Timescale to Duration of benefit once
<3 Years 10 Years
adoption achieved
TRL Development (Start – Current)
Probability of Success 35% 1 2 3 4 5 6 7 8 9
GnoSys UK, University of Southampton and Areva Research & Technology Centre,
R&D Providers
National Physical Laboratory
Page 82 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Technological
Type(s) of innovation Incremental Significant Radical
substitution
involved
Yes No No No
• To prove and quantify the additional capacity that an ACAM scheme could
introduce
• To prove the correlation of modelled ACAM angles against network PMU
Expected Benefits of
measurements
Project
• To identify the operational requirements of an ACAM scheme
• To gain the necessary evidence to justify an operational trial of the ACAM
scheme
Expected Timescale to Duration of benefit once
2 Years 10 Years
adoption achieved
TRL Development (Start – Current)
Probability of Success 35% 1 2 3 4 5 6 7 8 9
Page 83 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
The development of a set of a prototype Low Voltage (LV) jumper set to be used in
conjunction with a suitably graded portable LV circuit breaker. The full
arrangement to be used to energise LV circuits from adjacent live circuits during LV
Description of project
busbar outages, hence reducing customer outages and mobile generator costs.
Assuming the prototype proves successful the project will be extended to include
evaluation of several units on the network.
Internal £11,008 Expenditure in Internal £0
Expenditure for financial External £186 External £0
previous (IFI) financial
year
Total £11,194 years Total £0
Internal £15,000
Projected 2012/13 External £25,000
Project Cost £60k
costs for SPEN
Total £40,000
Technological area and /
The prototype arrangement would provide a technical solution to reduce customer
or issue addressed by
outages and mobile generator costs / emissions.
project
Technological
Type(s) of innovation Incremental Significant Radical
substitution
involved
Yes No No No
• Improved customer service via the reduction in the CI and CML associated with
the LV busbar outages.
Expected Benefits of • Reduction in the mobile generation emissions and costs associated with LV
Project busbar outages.
• Additional operational applications and benefits derived from field trials and
business exposure to the device.
Page 84 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Internal £24,697
Projected 2012/13
Project Cost £189,347 External £164,650
costs for SPEN
Total £189,347
The project will explore three separate work streams
1) Use of RFID technology using RFID tags bonded to earth straps that are monitored
(pinged) by a monitoring unit on site to detect their presence.
Technological area
and / or issue 2) To prove the concept of using SWR (Standing Wave Ratio) as used in radio/antenna
addressed by project optimisation to provide detection of real time “earth tamper” activity.
3) Develop the Cresatech Copper Theft Sensor (CuTS) protype unit for application at
ScottishPower substations.
There is no off the shelf product available for permanent installation in a substation
Expected Benefits of
which can detect the presence of adequate earthing and real time theft detection.
Project
The project only started shortly before the year end, so there is very little progress to
Project Progress to
report at this time, other than early experience of work streams 1 and 2 has not given
March 12
encouraging results so far. Work stream 3 has yet to start.
Collaborative
Scottish Power
Partners
R&D Providers Nortech Online Ltd, Cresatech
Page 85 of 86
SP Power Systems Limited Registered Office: 1 Atlantic Quay Glasgow G2 8SP
Registered in Scotland No. 215841 Vat No. GB 659 3720 08
IFI Annual Report 2011/12
Internal £12,500
Projected 2012/13 costs £130,000
Project Cost £140,300 External
for SPEN
Total £142,500
The aims of this project are to enhance both projects using advanced hardware /
Technological area and / software solutions to: (1) Automatically accumulate process and analyse the
or issue addressed by harmonic data to create useful system harmonic information. (2) To advance the
project design of a network fault recorder to accommodate SSR detection as a standard
feature in readiness of the Series Compensation being added to the network.
Technological
Type(s) of innovation Incremental Significant Radical
substitution
involved
Yes No No No
• Production of automatic harmonic reports that would have otherwise required
several man hours of effort each day to recreate.
• Both projects will decrease the risk to external parties connected to the
transmission network. In particular SSR detection will prevent the mechanical
Expected Benefits of failure of SSR susceptible turbines connected to the network.
Project • SPT will have increased awareness of the SSR phenomena and its detection in
advance of series compensation. SPT will have greater visibility of the
networks harmonic performance and have a greater ability to police it against
the Grid Code, with increasing levels of low carbon technology connecting to
the network.
Expected Timescale to Duration of benefit once
<2 Years 15 Years
adoption achieved
Page 86 of 86