How to Display 4 Baselines on the Gantt chart in Professional
Fundamentals Online
Primavera P6? Training Course
CONTACT US
Creating the baseline will help the manager analyze the efficiency of
the project’s basic requirements of threat or opportunity. A Gantt
Chart Baseline is the current plan of a project. In comparison, the Upcoming Events
Primavera P6 baseline is the screenshots or images of a project
strategy. These images consist of the real dates, period,
expenditures, and performance of the project. They help to measure
the project plan from all perspectives. Hence, the manager will be Primavera P6 CPM
able to understand the basis of the running project and analyze its Scheduling Class
achievement. (05APR2021-
16APR2021)
In Primavera P6 Proficient, the user can set up and give a project
baseline. He may also set up three user baselines for the sum of
four. He can present all four baselines on the Gantt chart at the same
time. For effective learning about the Primavera P6 efficient project Primavera P6 CPM
performance, the manager has to show different baselines on the Scheduling Class
Gantt chart. This guide article will let you know how to Display 4 (03MAY2021-
Baselines on the Gantt chart in Primavera P6.
14MAY2021)
Using Custom
User-Defined
Fields in
Primavera P6
July 17th, 2020
Removing
This image shows the baseline at the project starting. It is also Partial and All
displaying the three baselines of three development updates.Now Logic within
have a look to create all four of these baselines. the Primavera
P6 Schedule
First of all, click on the ‘project’ bar of the Primavera P6. February 1st,
Choose the ‘maintain baselines’ function. This option will create 2021
the baseline.
Tweets by
@consultleopard
Leopard Projec
CONTACT US @consultleopard
It's the most wonderful
night of the year! Merry
Christmas,
everyone!#christmas2020
#merrychristmas
Below the image five is showing that the first baseline is assigned at
the start of the Project Baseline.
HOME COMPANY SERVICES P6 TRAINING CALENDAR SHOP BLOG
CONTACT US
After creating and assigning the baselines, we will now see the
display of each baseline on the Gantt chart.
In image 7, all four baseline bar’s short descriptions at the lower side
of the stack display in the bar menu.
HOME COMPANY SERVICES P6 TRAINING CALENDAR SHOP BLOG
From the bar-style menu, you can choose the shape, color,
structure, and row.
If you apply the proper color and style, it will make the description
more instinctive.
If the users select a suitable row and design, it will become more
perceptive.
In the bar menu, the style and display of Project Baseline’s row have
been set. You can also see that it has been set to display on row 2.
The style is normal and tall.
You can see that all the bar’s description row is normal, heavy, and
low. Hence, the row and style of all bar’s descriptions are clear. Now
try to ensure to clasp on to view all baselines.
Hence, it’s time to set the suitable rows of the baseline bar.
For this purpose, we will click on the view panel and choose the
Font and Row bar.
HOME COMPANY SERVICES P6 TRAINING CALENDAR SHOP BLOG
CONTACT US
From the Table, Font, and Row menu, click on ‘keep current
row heights’ and set the height for all rows to 32.
Finally, the Gantt chart and four baseline bars are displayed.
HOME COMPANY SERVICES P6 TRAINING CALENDAR SHOP BLOG
CONTACT US
Conclusion
From the above detail, you can see that it is possible to show all four
baselines on the Gantt chart in Primavera P6. It consists of the
project baseline; when the project starts, its primary, secondary, and
tertiary baselines, to analyze the plan developed over time. The main
point to show the four baselines depend on the selection of suitable
row and bar design. The shape consists of bar placement and its
style. Primavera P6 Professional never automatically sets the row
height. Hence, it is up to you to set the row height according to the
display of all four baselines on the Gantt chart.
Related Posts
Leave a Reply
CONTACT US
Removing Partial
and All Logic
within the
Primavera P6
Schedule
Read
More Using and
Managing
Primavera P6
Thresholds
Copyright 2020, Leopard Project Controls, LLC. All Rights Reserved. Oracle® and P6® are registered trademarks and brands of Oracle
Corporation and/or its affiliates. All other marks are the property of their respective owners.
Privacy Policy | Terms of Use | Refund Policy | Contact Us | P6 Training | Services