QUESTION 1

The IP iteration can contain user value stories


A. FALSE
B. TRUE

Correct Answer: A

QUESTION 2

Which ART event drives relentless improvement?


A. The ART Inspect and Adapt
B. IP Iteration
C. PI System Demo
D. PI Planning

Correct Answer: A

QUESTION 3

Which of the below are not part of the CALMR approach to DevOps?
A. Large batches
B. Automation
C. Measurement
D. Culture

Correct Answer: A

QUESTION 4

What is meant by Realistic in the SMART model used for PI Objectives?


A. factors are out of control
B. none of the above
C. all factors are under full control
D. factors that cannot be controlled are recognized

https://www.certsquestions.com/SAFe-RTE-pdf-dumps.html
Correct Answer: D

QUESTION 5

What is the risk framework recommended to be used for Program Risks?


A. STAR
B. SMART
C. ROAM
D. WSJF

Correct Answer: C

QUESTION 6

Which of the below is not part of the 8 behaviors of servant leaders?


A. Persuades using authority
B. Listens an d supports teams in problem identification and decision-making
C. Creates an environment of mutual influence
D. Understands and empathizes with others

Correct Answer: A

QUESTION 7

The ART vision and events are established during which of the Tuckman stages?
A. Performing
B. Norming
C. Storming
D. Forming

Correct Answer: D

https://www.certsquestions.com/SAFe-RTE-pdf-dumps.html
QUESTION 8

The RTE should move from facilitating team problem-solving towards fixing problems rather than
helping others fix them
A. TRUE
B. FALSE

Correct Answer: A

QUESTION 9

The teams in the ART are synchronized on a common cadence called


A. Program Increment (PI)
B. Iteration
C. Product Increment (PI)
D. Portfolio Increment (PI)

Correct Answer: A

QUESTION 10

Which from the below are typical program measures of a cumulative flow diagram?
A. WIP limits
B. Throughput
C. Business value
D. Lead time

Correct Answer: A,B,D

QUESTION 11

The ART building the system is a system, too


A. FALSE
B. TRUE

https://www.certsquestions.com/SAFe-RTE-pdf-dumps.html
Correct Answer: B

https://www.certsquestions.com/SAFe-RTE-pdf-dumps.html