Piping Material Specification
Piping Material Specification
THE AUTHOR/ UNDERSIGNED CONFIRM BY THEIR SIGNATURE THAT THIS DRAWING/ DOCUMENT IS MADE AND SIGNATURE
CHECKED AND APPROVED FULLY IN ACCORDANCE TO THE REQUIREMENTS OF THE CONTRACT AND HAS PASSED
CONTRACTOR'S QA/ QC PROCEDURES.
CLIENT
PROJECT
CNE/001/2006
ENGINEER
P
Unit 1 2
SUB CONTRACTOR
TITLE
CNE/001/2006-W-31-M-T-13001 0
1/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 2 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
Table of Contents
1. Scope 3
5. Abbreviation 19
6. Material Specification 20
7. Appendices
7.1. Fire Fighting System Piping Specification No. CNE/001/2006-M-38-M-T-04040
(20 pages)
2/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 3 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
1. Scope
This specification covers the requirements of the materials of piping system for JEBEL ALI
POWER & DESALINATION STATION 'M' PROJECT except the specific vendor related
piping systems. The specific vendor related piping system shall be covered by the appended
vendor piping specification listed as below.
The piping specification for the fire fighting services shall be covered by the Appendix 7.1.
Fire Fighting System Piping Specification No. CNE/001/2006-M-38-M-T-04040 by Zener
Electronics Services.
2.1. Design
ASME B31.1 : Power Piping
ASME B31.3 : Process Piping
AWWA C950 & AWWA M45 : GRP Piping
ASTM D3350 : Polyethylene Plastic Pipe and Fittings Materials
3/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 4 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
4/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 5 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
5/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 6 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
15 ST
20 SR ST
25 SR SR ST
40 SR SR SR ST
50 SR SR SR SR ST
15 20 25 40 50 80 100 150 200 250 300 350 400 450 500 600
Branch (mm)
ST : Socket Weld Tee T : Butt Welding Tee
T-S : Equeal Tee Connected with Swage RT : Butt Welding Reducing Tee
W : Weldolet C : Half Coupling
S : Sockolet SR : Socket Weld Reducing Tee
6/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 7 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
15 TT
20 TR TT
25 TR TR TT
Header (mm)
40 TR TR TR TT
50 TR TR TR TR TT
65 C C C T(S) T(S) T
80 C C C T(S) T(S) RT T
100 C C C C T(S) RT RT T
150 C C C C C RT RT RT T
15 20 25 40 50 65 80 100 150
Branch (mm)
7/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 8 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
Pipe Class : CS3, CS4, CS6, CS15, PA3, PA6, PA15, 316L3, 316L15,
316SS3, 316SS6, 316SS15
15 T
20 RT T
25 RT RT T
40 RT RT RT T
50 RT RT RT RT T
80 W W W T-S T-S T
100 W W W W T-S RT T
Header (mm)
150 W W W W W RT RT T
200 W W W W W W RT RT T
250 W W W W W W W RT RT T
300 W W W W W W W RT RT RT T
350 W W W W W W W RT RT RT RT T
400 W W W W W W W RT RT RT RT RT T
450 W W W W W W W W RT RT RT RT RT T
500 W W W W W W W W W RT RT RT RT RT T
600 W W W W W W W W W W RT RT RT RT RT T
15 20 25 40 50 80 100 150 200 250 300 350 400 450 500 600
Branch (mm)
ST : Socket Weld Tee T : Butt Welding Tee
T-S : Equeal Tee Connected with Swage RT : Butt Welding Reducing Tee
W : Weldolet
S : Sockolet
8/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 9 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
15 ST
20 SR ST
25 SR SR ST/N
40 SR SR SR/N ST/N
80 N/A N/A N N N N
15 20 25 40 50 80 100 150 200 250 300 350 400 450 500 600
Branch (mm)
N : Adhesive joint and wrapped lay-up with GRP according to Manufacturer's Standard
9/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 10 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
15 BF
20 BR BF
25 BR BR BF
40 N BR BR BF
50 N N N BR BF
80 N N BR BR BR BF
100 N N N BR BR BR BF
(mm)
150 N N BR N BR BR BR BF
Header
200 N N BR N BR BR BR BR BF
250 N N N N N BR BR N N BF
300 N N N N N BR BR BR N N BF
350 N N N N N N N N N N N N
400 N N N N N N N N N N N N N
450 N N N N N N N N N N N N N N
500 N N N N N N N N N N N N N N N
600 N N N N N N N N N N N N N N N N
≥650 N N N N N N N N N N N N N N N N N
15 20 25 40 50 80 100 150 200 250 300 350 400 450 500 600 ≥650
Branch (DN)
BF: Butt Fusion Tee(PEHD)
BR: Butt Fusion Reducing Tee(PEHD)
N : Butt Fusion and Manufactured with PEHD according to Manufacture's Standard
10/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 11 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
Piping and valves shall comply with the latest revision of the applicable codes and standards
(latest revisions) such as DIN, TRD, AFNOR, BS, ASA, ASST, ASME or other equivalent
international standards. Standard pipe sizes shall preferably be according to ISO R 64 or ANSI
B 36.10/ B36.19.
In this and other parts of this Specification ther term "high pressure" refers to steam pipework
where the design pressure exceeds 17 bar and to other systems where these values exceed 24
bar.
The following standard pipe sizes shall be used for the different systems:
Diameter in DN: 25, 32, 40, 50, 65, 80, 100, 125, 150, 200, DN: 250, 300, 350, 400 etc.
Pipes with a diameter size smaller than DN 25 may be used only for control air, control oil,
chemical dosing, sealing water, instrument connections, colling water connections to equipment,
sampling pipes and input pipes.
Sampling pipes and injection pipes, etc. shall be made of stainless steel.
Pipe material, flanges, bolts, nuts, washers and the like for compressed air respectively
instrumentation and control air systems shall be hot dip galvanized.
The nominal diameter of drains and vent pipework shall not be less than DN 25.
All welding ends on piping, bends and fittings prepared both in shop and field shall be
machined. Welding joint design shall avoid all sharp corners. The preferred weld type shall be
butt-welded joints and welding neck flanges. Socket welding is only permitted up to ND 50 for
low pressure PN≤16 bar systems/ pipes.
Screwed pipe work will only be permitted for pipes of less than 50mm bore in non-critical air or
water service.
Jointing material, bolts, nuts and washers shall be provided where necessary for flanged pipes,
valves and fittings supplied under this Contract. Bolts, studs, nuts and washers are to be
galvanized in accordance with clause 2.2 unless otherwise approved by the Engineer.
Fiber glass pipes shall be used for both drinking and service water throughout the station, i.e.
underground, above ground.
The minimum size of root valves (primary isolating valves) shall not be less than DN 25. For
gas services ball valve type shall be used.
11/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 12 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
All steel underground pipe work shall be protected by cathodic protection and factory applied
wrapping.
In general, long radius(1.5D) elbows shall be used for all piping. If pipe bend is necessary for
high pressure or temperature service, it shall be made preferably to radius not less than five
times the nominal.
12/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 13 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
4.1. General
All valves shall be suitable for the service conditions under which they are required to operate.
The design, construction and choice of materials shall take into account all operational
deviations including pressure surge and thermal shock.
All valves shall have platform for operation and maintenance. Necessary handling facility shall
be available for each valve.
Valve trim materials for steam service generally should be 316 type stainless steel with stellite
sealing rings and seats; all other materials should be dimensionally stable over ther operating
temperature range. Where the valves include the use of stellite or other hardfacing material to
the valve seats, there shall be a differential hardness of not less than 50 and not more than 100
Brinell between fixed and moving seats, with the harder material on the fixed seats. Valves
having a back-seating facility are preferred, particularly in critical positions.
Unless otherwise specified, the bodies of valves shall be forged or cast steel. Gun metal or cast
iron valves shall not be used in any fuel or oil/gas system or any feedwater or similar system
where shock loads could result in sudden fracture.
Other than for main turbine stop valves, isolating valves for steam services should normally be
of the flexible or solid wedge gate type.
Gate valves should be such that the bore of the fully open valve is unobstructed by any part of
the gate. Where the blade of a butterfly valve requires significant thickening to provide adequate
stiffness a through- flow (low loss) design is preferred.
Valves operating under sub-atmospheric conditions shall be with glands and seating rings water
sealed. All neccesary sealing water header tanks and piping shall be provided under this
Contract.
Where temperatures permit, use may be made of diaphragm or 'pinch-type' valves which do not
close due to atmospheric pressure.
Diaphragm valves shall be used for services carrying chemicals or aggressive fluids, and also for
salt water services.
Valves for lubricating oil services shall be flanged, having steel bodies with stainless trim.
Any valve which is designed for uni-directional flow shall have an arrow embossed or cast on
the valve body clearly indicating the required flow direction.
All valves, unless otherwise approved or specified, shall be of the external rising spindle type.
13/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 14 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
Where desirable to protect the spindle against ingress of dirt, or where the position of the valve
may create a hazard to operators when the spindle is extended, suitable spindle covers shall be
provided.
The spindles and operating gear of all valves for use outdoors shall have weather and dust proof
protection.
Any gear or bevel wheels used to transmit motion shall be of cast steel or approved quality cast
iron with machine cut teeth.
No thrust from the valve shall be transmitted to the extension spindles and valve pedestals shall
not be mounted directly on floor plating. Any floor steel work trimmers for supporting pedestals
shall be provided by the Contractor.
Special attention shall be given to the operating mechanism and correct lubrication of all valves
to ensure a minimum of maintenance and ease of operation.
All valves shall be positioned so as to be readily accessible for operation and maintenance from
permanent floors, galleries or access platforms.
As for as practicable any maintenance or replacement of wearing parts shall be possible with the
valves in situation, but for valves with connecting branches of less than 50 mm nominal bore
full access to moving components only will be accepted.
The seats of all steam valves shall be accessible for machining for purposes of reclamation or
repair.
Eyebolts or similar facilities shall be provided, where necessary, to facilitate the handling of
heavy valves or components.
No valve shall be installed with its operating spindle gland below the horizontal center line so as
to avoid dirt entering the gland and to ensure complete drainage.
When valves are required to be locked in position for operation they shall be provided with an
approved locking system on the spindle(no chain) and with a master key system.
The internal diameter of all valves at the ends adjacent to the pipes shall be the same as the
internal diameter of the pipe to which they are joined.
All valves shall be provided with labels or nameplates. These labels shall include in the
inscription a valve "name", or abbreviated description of the valve duty, and a unique plant
reference number for the valve.
Within 2 months of award of Contract, a valve numbering scheme to cover the complete
Contract Works shall be agreed. After approval of the numbering scheme, the Contractor shall
draw up a valve schedule to cover the Contract Works.
14/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 15 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
The scheduled details of each valve shall include the valve number, its title as it appears on the
valve label, the nominal size of the valve, its design pressure and temperature, the
Manufacturer's name and model number and a brief description of the valve materials.
The valve schedule shall be subject to the Engineer's approval. The finalized valve schedule
shall be included in the operating and maintenance manuals, provided under this Contract.
Where a modulating valve in high-pressure service has a full-flow emergency bypass, the latter
shall also be capable of modulating duty.
All high pressure valves of 150 mm bore and above shall be provided with bypasses connected
to the valve body. All high pressure gate valves shall be provided with pressure sealed
bonnet(breechlock) shall be provided with pressure relief device(safety valve, rupture disc etc.)
Maintenance of rupture disc shall be possible during the valve in service.
All valve applications that will be used for isolating purposes at high pressure shall offer double
isolation by means of two valves in series.
Drainage and flushing of space between the gate valve wedge or between seat rings needed.
The valve bonnet size shall be such that all surfaces of the valve shall be accessible for repair,
lifting, weld surfacing and seat replacement.
All tools needed to lap and seat replacement and repair shall be provided. All high pressure
valves shall be of butt welded construction.
Where required, valve spindles shall be lengthened so that the handwheel shall be at a height
approximately one meter above the level of the floor or platform from which the valve is to be
operated and where necessary they shall be provided with headstocks and pedestals of rigid
construction. All thrusts when opening or closing the valve shall be taken directly on the valve
body.
Pedestal handwheels or valve tables shall be provided at a convenient operating floor or
intermediate floor level. Such pedestals and valve tables shall be mounted direct on floors or
steel members and not on floor grills or plating.
All valve hand operating mechanisms shall be easily operable by one man. The mechanisms
shall be such that the total force at the rim of the handwheel or other point of application of
manual action shall not need to exceed 400N(normally 200N pull plus 200N push) to exercise
Special attention shall be given to the operating mechanism for large size valves with a view to
ensuring that a minimum of maintenance is required and to obtaining quick and easy operation.
All gate, globe and screwdown non-return valves shall be of the non-rising handwheel pattern
unless specifically approved by the Engineer.
15/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 16 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
All valves shall be closed by rotating the handwheels in a clockwise direction when looking at
the face of the handwheel. In cases where the handwheel is not directly attached to the valve
spindle suitable gearing shall be introduced to ensure clockwise closing.
The face of each handwheel shall be clearly marked "open" and "shut" or "closed" with arrows
indicating the direction of rotation to which they refer.
Plastic valve handwheels will not be accepted. All valve spindles shall be fitted with indicators
so that the valve opening con be readily determined. In the case of valves fitted with extended
spindles, indicators shall be fitted both to the extended spindles and to the valve spindles.
Control valve manifolds shall be accessible from either ground or permanent platforms.
Control valve manifolds shall be as per approved arrangement including clearance for removal
of actuator case, plug and stem.
Control valve manifolds shall be adequately supported to avoid pipe loads or moments being
transmitted to the control valve.
Control valve manifolds located in pipe lines on pipe ways and which cannot be brought down
to ground due to process reasons, may be located above and to the side of the pipe way and
provided with a walkway or platform.
Control valves manifolds are preferred at ground wherever possible and shall be located along
building walls, or adjacent to equipment. They shall be kept clear of operating aisles and
working spaces. Where practical, they shall be grouped along pipe way supports with sufficient
clearance for maintenance.
Control valve manifolds located in buildings shall be arranged along the walls or beside pumps
in a manner, which will not impede operation or maintenance of pumps or other equipment.
Control valves operated by liquid level controller shall be preferably located so that the gauge or
level indicator can be read from the control valve location. If this is impractical, a level indicator
shall be provided at the control valve.
Control valves shall be so arranged that the control valve can be removed without damaging the
flanges.
16/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 17 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
Control valves installed on piping DN400 and below shall be provided with manual isolation
valves upstream and downstream and a bypass valve of the same characteristics to allow Control
valve maintenance with the system in operation. For piping above DN400, this provision shall
be as per particular requirement specified elsewherein the Tender Documents.
Control valves shall be designed of the same nominal diameter - or maximum one nominal
diameter less than - the associated pipe. Piping around control valves shall provide enough
clearance to permit removal of the control valve flange bolts.
When the pipeline fluid is viscous or contains sediment, slurry, fines, etc, the bypass valve shall
be installed in a horizontal position above the control valve, so that deposits cannot build up in
trapped lines.
All drains and vents shall be of approved design, size and type. All internal parts shall be
constructed from approved materials and shall be renewable. Valve and steam trap bodies and
covers shall be of cast or forged steel and shall be suitable for operation at the maximum
working pressure and temperature of the steam piping to which they are connected. Drain and
vent valves of high-pressure systems shall be of "heavy duty" design.
Drain traps shall be provided with inlet and discharge valves and hand-controlled bypasses and
when discharging into a closed header they shall also be provided with discharge non-return
valves. In general, traps shall be of the floating type, in case the Contractor wants to use other
types he shall obtain prior approval from the Employer/Engineer.
The Contractor shall provide all traps, drains and vents which are called for in this specification
or which are necessary for plant operation, line or plant filling or warming through.
Steam trap provision shall be limited to one trap supplier, if a single supplier is unable to
provide all the different types of traps necessary to match the various plant duties.
The application of steam drain and trap arrangement shall include appropriate provisions for any
necessary venting of gases, and to minimise the risk of corrosion in the drained pipes or vessels.
Each steam trap shall be fitted with a bypass and all necessary isolating valves so that the trap
may be taken out of service without blocking the drain point.
Drain valves operated by remote control shall be provided for all drains required to be operated
during normal start-up or shut-down operation of the pertaining plant equipment.
Drains shall be form condensate collection pockets attached to the steam lines, of adequate size
and form to intercept condensate in the main steam flow and to allow solids washed into the drip
leg to settle.
17/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 18 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
The use of orifices in place of steam traps are permitted for special applications with prior
approval from the Engineer.
Pressure relief valves shall be of the spring-loaded type unless otherwise specified, or unless the
Engineer has given written permission for the use of a different type of valve actuation.
Spring-loaded valves shall be fitted with easing gear which shall not be extended.
Where necessary relief valves shall be supplied with vent pipes, silencers and drains, and with
gagging equipment for hydraulic testing following erection and in the long-term maintenance of
the plant.
All major safety relief valve shall be designed to adjust lift and reseat pressure.
Reducing valves shall be of approved type and shall be perfectly stable, quiet and vibrationless
in operation when pressure reducing at any throughput up to the maximum flow and shall be
suitable for continuous use at the operating conditions.
Where electrical or hydraulic valve operation is included the operating mechanism shall be
remote controlled. On failure of the operating mechanism the valve shall neither close nor open
automatically but shall be readily adjustable by hand.
A pressure relief valve shall be provided on the outlet side of each reducing valve, capable of
exhausting to atmosphere the maximum discharge of the reducing valve without undue build-up
of pressure on the LP side. The discharge from the relief valve shall be led to safe approved
target. Pressure gauges and thermometers shall be provided upstream and downstream of the
reducing valves.
Butterfly valves shall have bodies of either the flanged or in case of nonstream service of lugged
wafer type with downstream dismantling. The actuator/manual gearbox shall be mounted direct
to the valve body, other than where both actuator and body are fitted with feet for pedestal
mounting; no actuator loads shall be transmitted via the pipework. The valve should be mounted
with spindle set horizontal. If the valve is designed for unidirectional flow, an arrow shall be
cast or embossed in a prominent position on the valve boty to indicate that direction.
18/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 19 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
The valve must be capable of positive shut-off in both directions against full system pressure.
Unless an alternative type is proposed by the Contractor and approved by the Engineer as being
fully suitable for the paricular duty, the seating of the disc shall be positive(that is, the disc must
not be capable of passing through the shut position); a stop fitted on the actuator/operating lever
is not adequate for shis purpose.
Unless the Contractor can demonstrate that some alternative design is capable of adequate long-
term sealing, the design shall be such that the shaft is offset from the seal ring(that is there shall
be an unbroken peripheral seal when the valve is shut.)
If the valve body is rubber(or elastomer) lined, the lining should be made by a self containing
and replaceable inlet, unless otherwise approved by the engineer.
Internal shaft bearings must be capable of operating dry, that is, not dependent on the presense
of the pumped fluid.
All non-return valves shall be provided with means of draining and depressuring the space
between the valve and its adjacent isolating valve. The design shall preclude the possibility of
the valve jamming in the open position; the effect of solid paricles settling-out in dead spaces
within the valve should be recognized in this respect.
Unless stated to the contrary, non-return valves should be rapid-closing. Power-assisted closing
is acceptable where necessary for rapid shut-off. For large non-return valves on air and water
servides, consideration shall be given to the consequences of valve slam and the possible
requirements for a hydraulic snubber to minimize slam effects.
Valves, dampers and similar devices requiring abnormal physical effort to operate or hith speed
operation, shall be provided with powered acuation. Hand operating equipment shall also be
fitted for closing and opening, which is effectively decoupled during power operation.
The following criteria are preferred in the selection of the power source for the servo
(a) isolation and other duties not subject to operation more than once in 10 minutes - electrical,
compressed air.
(b) continuous or intermittent modulation - compressed air, or hydraulic fluid. Modulating
electrical actuators shall be to the Engineer's approval.
(c) continuous or intermittent modulation involving heavy control forces hydraulic fluid.
(d) emergency control or isolating duties - spring loaded backed up by compressed air or
hydraulic fluid.
19/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 20 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
Electric actuators for on/off duties shall be fitted with travel limiting devices capable of accurate
and positive adjustment. Torque limiting or other devices shall be provided to prevent damage to
the mechanism in the event of jamming of the driven device.
All powered valve or damper mechanisms shall be provided with accurate indication of the
position of the driven device. External limit switches shall be proximity limit type.
Power supply shall be in conjunction to the particular requirements of the control and
instrumentation specification.
Direct solenoid operation of valves shall comply with the control and instrumentation section of
the specification.
Reversing contactors and limit switches, used to control electric power driven mechanisms, shall
be robust and of proven reliability by both type test and commercial operation. Solid state
switching may be accepted when temperature conditions permit.
Annex C0-8 "Typical pipe and valve classes" shall be seen as a minimum requirement.
Pipe and valve class grouping, KKS code, design temperature, design pressure, rating and pipe
wall thickness shall be selected in accordance with the plant data of Station 'M'.
For each system under this Contract the Contractor shall submit detailed comprehensive pipe
and valve specifications for approval using the Annex C0-8 as a guideline with minimum
requirements to be read together with requirements described elsewhere in technical
specifications. In case of contradictions the stronger requirement will prevail.
20/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 21 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
5. Abbreviation
Abbreviation Description
21/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 22 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
6. Material Specification
Design Design
Class Corrosion
Class Material Service System Pressure Temp.
Rating Allowance
(kg/cm2, g) (°C)
Fuel Oil GT Forwarding Pump
EGD 14.3 60
Discharge/Return Line
Fuel Oil Tank Filling Line EGB, EGD 9.2 60
Carbon
CS1 150# 2.54 mm
Steel
Fuel Oil Tank Outlet Distribution EGC, EGD 5.1 60
22/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 23 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
Design Design
Class Corrosion
Class Material Service System Pressure Temp.
Rating Allowance
(kg/cm2, g) (°C)
HP/IP PRDS Downstream line /
IP Steam common line to HRSG LBG 22.4 290
Deaerator
Clean Drain Pump Discharge LCM 22.4 152
Carbon
CS3 300# 1.5 mm
Steel LP Feedwater Line(HRSG) LCA 21.4 218
23/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 24 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
Design Design
Class Corrosion
Class Material Service System Pressure Temp.
Rating Allowance
(kg/cm2, g) (°C)
HP Feedwater line(HRSG)
LAB 189.67 361
Carbon (After Check Valve)
HCS15 1500# 1.5 mm
Steel HP Economizer Inlet&Outlet
HAC 189.67 361
Line(HRSG)
Carbon N2 Gas Bottle to 1st Pressure
CS25 2500# 1.5mm QJA 305 60
Steel Reducing Valve
CSG CS + GAL 150# 1.5 mm Instrument & Service Air QFB, SCB 13.5 80
HCl Dosing Line of Wastewater
GNN 3 60
Treatment System
Chemical Wastewater Transfer Pumps
Discharge Line of Wastewater GCR 4.5 60
Treatment System
Acid dilution water line of
GCP 4.5 60
Carbon Demineralized Water System
Steel + Waste water line of Demineralized
CSRL 150# 0 mm GCR 3.75 60
Rubber Water System
Lining Acid dosing line of Demineralized
GCN 7.5 60
Water System
Acid transfer pumps suc.& disch. Line
GCN 3.75 60
of Demineralized Water System
24/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 25 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
Design Design
Class Corrosion
Class Material Service System Pressure Temp.
Rating Allowance
(kg/cm2, g) (°C)
HP Main Steam Line(HRSG) 122.37 567
PA15 Alloy Steel 1500# 2.54 mm HP SH #1 Outlet Line(HRSG) HAH 122.37 492
25/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 26 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
Design Design
Class Corrosion
Class Material Service System Pressure Temp.
Rating Allowance
(kg/cm2, g) (°C)
Mixed Bed Exchangers discharge line
GCF 6.0 60
of Demineralized Water System
Mixed Bed Exchagers downstream
analyzer inlet line/air vent line of GCF ATM 60
Demineralized Water System
Regeneration pump suc. & disch.line
GCP 4.5 60
of Demineralized Water System
Circulation pumps suc. & disch.line of
GCP 3 60
Demineralized Water System
NaOH service & dilution line of
GCP 7.5 60
Demineralized Water System
Acid dilution line of Demineralized
GCP 4.5 60
Water System
Stainless
316L2 150# 1.25 mm Mixed Bed Exchanger drain line of
Steel GCR ATM 60
Demineralized Water System
Mixed Bed Exchanger downstream
drain line of Demineralized Water GCR ATM 60
System
NaOH transfer line of Demineralized
GCN 5.3 60
Water System
NaOH dosing line of Demineralized
GCN 7.5 60
Water System
Air blowers suc.& disch. Line of
GCB 0.6 60
Demineralized Water System
Instrument air line of Demineralized
GCB 6.8 60
Water System
Service water line of Demineralized
GKU 6.8 60
Water System
Chemical Dosing to HRSG & Aux.
Boiler FWP Suction / QCD 29.6 190
ST Condenser & COP Discharge
Stainless
316L3 300# 1.25 mm Chemical Dosing to Aux. Boile HP
Steel QCC 34 300
Drum
Fuel Gas Final Filter to GT inlet EKG 37 80
Stainless
316L15 1500# 1.25 mm Chemical Dosing to HRSG HP Drum QCC 124.4 350
Steel
Stainless Sampling (HRSG LP Drum
316SS1 150# 1.25 mm QUC 4.6 213
Steel Blowdown)
Sampling (Aux. Boiler Deaerator) 4.1 164
Stainless
316SS1 150# 1.25 mm QUC
Steel
Sampling (CCW System) 9.2 60
26/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 27 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
Design Design
Class Corrosion
Class Material Service System Pressure Temp.
Rating Allowance
(kg/cm2, g) (°C)
Stainless Sampling (Aux. Boiler FWP
316SS6 600# 1.25 mm QUA 70.4 150
Steel Discharge)
Sampling (Aux. Boiler Superheated
39.8 300
Stainless Steam)
316SS6 600# 1.25 mm QUC
Steel Sampling (Aux. Boiler Drum
39.8 270
Blowdown)
Sampling (HRSG FWP Discharge) QUA 189.7 190
Stainless
316SS15 1500# 1.25 mm Sampling (HRSG Superheated Steam) 112.2 567
Steel
QUC
Sampling (HRSG HP Drum
124.4 350
Blowdown)
Circulating Water System PCB 4.2/F.V. 55
27/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 28 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
Design Design
Class Corrosion
Class Material Service System Pressure Temp.
Rating Allowance
(kg/cm2, g) (°C)
Acid tank vent & drain GCN ATM 60
Yard Hydrant System
SG01 GRE 150# 0 mm SGA 11.7 50
- U/G Fire Water Main
Indoor Hose Reel System
SG02 CS + GAL 150# 1.5 mm SGA 11.7 50
- A/G Fire Water Main
Deluge System SGA 11.7 50
Foam System SGA 11.7 50
SG03 CS + GAL 150# 1.5mm Cooling Spray system SGA 11.7 50
Foam Water Spray System SGA 11.7 50
A/G Fire Water Main SGA 11.7 50
Sprinkler System
SG04 CS + GAL 150# 1.5mm SGA 11.7 50
- A/G Wet Piping
SG05 CS + GAL 300# 1.5mm FM200 Gas Extinguishing System SGA 25.5 50
CO2 Gas Extinguishig System
SG06A CS + GAL 600# 1.5mm SGA 59.9 50
(Open Ended Pipe Work)
CO2 Gas Extinguishig System
SG06B CS + GAL 600# 1.5mm SGA 59.9 50
(Closed Section Of Pipe Work)
Stainless
SG07 150# 1.5mm Foam Concentrate SGA 12.7 50
Steel
Supply pipe line for HVAC System -
Black Start Diesel Generator &
SAD01 10 6.7
Emergency Diesel Generator for
Common
Return pipe line for HVAC System -
Black Start Diesel Generator &
SAD01 10 12.2
Emergency Diesel Generator for
Common
Supply pipe line for HVAC System -
SAC02 10 6.7
Central Control Building
Return pipe line for HVAC System -
SAC02 10 12.2
Central Control Building
Supply pipe line for HVAC System -
Central Mechanical & Electronic SAS01 10 6.7
Workshop / Outdoor Storage
Return pipe line for HVAC System -
Central Mechanical & Electronic SAS01 10 12.2
Workshop / Outdoor Storage
Supply pipe line for HVAC System -
SAU01 10 6.7
Mechanical & Electrical Storage
Return pipe line for HVAC System -
SAU01 10 12.2
Mechanical & Electrical Storage
Supply pipe line for HVAC System -
SAS02 10 6.7
Carpenter Workshop
Return pipe line for HVAC System -
SAS02 10 12.2
Carpenter Workshop
Supply pipe line for HVAC System -
SAC01 10 6.7
Common SWGR Building
28/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 29 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
Design Design
Class Corrosion
Class Material Service System Pressure Temp.
Rating Allowance
(kg/cm2, g) (°C)
Return pipe line for HVAC System -
SAC01 10 12.2
Common SWGR Building
Supply pipe line for HVAC System -
SAU02 10 6.7
Chemical Dosing House # 1
Return pipe line for HVAC System -
SAU02 10 12.2
Chemical Dosing House # 1
Supply pipe line for HVAC System -
SAU03 10 6.7
Chemical Dosing House # 2
Return pipe line for HVAC System -
SAU03 10 12.2
Chemical Dosing House # 2
Supply pipe line for HVAC System -
SAU04 10 6.7
Chemical Dosing House # 3
Return pipe line for HVAC System -
SAU04 10 12.2
Chemical Dosing House # 3
Supply pipe line for HVAC System -
Steam Turbine Building (Included GT SAE01 10 6.7
Workshop & LEB for STG) #1
Return pipe line for HVAC System -
Steam Turbine Building (Included GT SAE01 10 12.2
Workshop & LEB for STG) #1
Supply pipe line for HVAC System -
Steam Turbine Building (Included GT SAE02 10 6.7
Workshop & LEB for STG) #2
Return pipe line for HVAC System -
Steam Turbine Building (Included GT SAE02 10 12.2
Workshop & LEB for STG) #2
Supply pipe line for HVAC System -
Steam Turbine Building (Included GT SAE03 10 6.7
Workshop & LEB for STG) #3
Return pipe line for HVAC System -
Steam Turbine Building (Included GT SAE03 10 12.2
Workshop & LEB for STG) #3
Supply pipe line for HVAC System -
SAM01 10 6.7
Gas Turbine Building #1
Return pipe line for HVAC System -
SAM01 10 12.2
Gas Turbine Building #1
Supply pipe line for HVAC System -
SAM02 10 6.7
Gas Turbine Building #2
Return pipe line for HVAC System -
SAM02 10 12.2
Gas Turbine Building #2
Supply pipe line for HVAC System -
SAM03 10 6.7
Gas Turbine Building #3
Return pipe line for HVAC System -
SAM03 10 12.2
Gas Turbine Building #3
Supply pipe line for HVAC System -
Local Electrical Building for SAC17 10 6.7
Carpenter Workshop
Return pipe line for HVAC System -
Emergency Diesel Generator for SAD02 10 12.2
Block #1
29/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 30 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
Design Design
Class Corrosion
Class Material Service System Pressure Temp.
Rating Allowance
(kg/cm2, g) (°C)
Supply pipe line for HVAC System -
Emergency Diesel Generator for SAD02 10 6.7
Block #1
Return pipe line for HVAC System -
Emergency Diesel Generator for SAD03 10 12.2
Block #2
Supply pipe line for HVAC System -
Emergency Diesel Generator for SAD03 10 6.7
Block #2
Return pipe line for HVAC System -
Emergency Diesel Generator for SAD04 10 12.2
Block #3
Supply pipe line for HVAC System -
Emergency Diesel Generator for SAD04 10 6.7
Block #3
Return pipe line for HVAC System -
Local Electrical Building for HRSG SAC04 10 12.2
#1
Supply pipe line for HVAC System -
Local Electrical Building for HRSG SAC05 10 6.7
#2
Return pipe line for HVAC System -
Local Electrical Building for HRSG SAC05 10 12.2
#2
Supply pipe line for HVAC System -
Local Electrical Building for HRSG SAC06 10 6.7
Carbon #3
Return pipe line for HVAC System -
CH2 PN16 1.5 mm
Steel Local Electrical Building for HRSG SAC06 10 12.2
#3
Supply pipe line for HVAC System -
Local Electrical Building for HRSG SAC07 10 6.7
#4
Return pipe line for HVAC System -
Local Electrical Building for HRSG SAC07 10 12.2
#4
Supply pipe line for HVAC System -
Local Electrical Building for HRSG SAC08 10 6.7
#5
Return pipe line for HVAC System -
Local Electrical Building for HRSG SAC08 10 12.2
#5
Supply pipe line for HVAC System -
Local Electrical Building for HRSG SAC09 10 6.7
#6
Return pipe line for HVAC System -
Local Electrical Building for HRSG SAC09 10 12.2
#6
Supply pipe line for HVAC System -
SAC10 10 6.7
Local Electrical Building for GTG #1
Return pipe line for HVAC System -
SAC10 10 12.2
Local Electrical Building for GTG #1
Supply pipe line for HVAC System -
SAC11 10 6.7
Local Electrical Building for GTG #2
Return pipe line for HVAC System -
SAC11 10 12.2
Local Electrical Building for GTG #2
Supply pipe line for HVAC System -
SAC12 10 6.7
Local Electrical Building for GTG #3
Return pipe line for HVAC System -
SAC12 10 12.2
Local Electrical Building for GTG #3
30/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 31 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
Design Design
Class Corrosion
Class Material Service System Pressure Temp.
Rating Allowance
(kg/cm2, g) (°C)
Supply pipe line for HVAC System -
SAC13 10 6.7
Local Electrical Building for GTG #4
Return pipe line for HVAC System -
SAC13 10 12.2
Local Electrical Building for GTG #4
Supply pipe line for HVAC System -
SAC14 10 6.7
Local Electrical Building for GTG #5
Return pipe line for HVAC System -
SAC14 10 12.2
Local Electrical Building for GTG #5
Supply pipe line for HVAC System -
SAC15 10 6.7
Local Electrical Building for GTG #6
Return pipe line for HVAC System -
SAC15 10 12.2
Local Electrical Building for GTG #6
Supply pipe line for HVAC System -
SAS06 10 6.7
Fire Water Pump House
Return pipe line for HVAC System -
SAS06 10 12.2
Fire Water Pump House
Supply pipe line for HVAC System -
SAS07 10 6.7
Fire Fighting Station
Return pipe line for HVAC System -
SAS07 10 12.2
Fire Fighting Station
Supply pipe line for HVAC System -
SAP01 10 6.7
Central HVAC Building
Return pipe line for HVAC System -
SAP01 10 12.2
Central HVAC Building
Supply pipe line for HVAC System -
SAG01 10 6.7
Demineralised Water Plant
Return pipe line for HVAC System -
SAG01 10 12.2
Demineralised Water Plant
Supply pipe line for HVAC System -
SAU06 10 6.7
Compressed Air Station
Return pipe line for HVAC System -
SAU06 10 12.2
Compressed Air Station
Supply pipe line for HVAC System -
SAG02 10 6.7
Waste Water Treatment Plant
Return pipe line for HVAC System -
SAG02 10 12.2
Waste Water Treatment Plant
Supply pipe line for HVAC System -
Local Electrical Building for DFO SAF01 10 6.7
Forward Station
Return pipe line for HVAC System -
Local Electrical Building for DFO SAF01 10 12.2
Forward Station
Supply pipe line for HVAC System -
SAC16 10 6.7
Local Electrical Building for GPRS
Return pipe line for HVAC System -
SAC16 10 12.2
Local Electrical Building for GPRS
Supply pipe line for HVAC System -
Local Electrical Building for F.F.
SAC18 10 6.7
Water Pump House and Central M&E
Workshop
31/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 32 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
Design Design
Class Corrosion
Class Material Service System Pressure Temp.
Rating Allowance
(kg/cm2, g) (°C)
Return pipe line for HVAC System -
Local Electrical Building for F.F.
SAC18 10 12.2
Water Pump House and Central M&E
Workshop
Supply pipe line for HVAC System -
Gas Compressor Station & Gas SAU05 10 6.7
Station Local Switchgear Building #1
Return pipe line for HVAC System -
Gas Compressor Station & Gas SAU05 10 12.2
Station Local Switchgear Building #1
Supply pipe line for HVAC System -
SAU06 10 6.7
Compressed Air Station
Return pipe line for HVAC System -
SAU06 10 12.2
Compressed Air Station
Supply pipe line for HVAC System -
Gas Compressor Station & Gas SAU07 10 6.7
Station Local Switchgear Building #2
Return pipe line for HVAC System -
Gas Compressor Station & Gas SAU07 10 12.2
Station Local Switchgear Building #2
Supply pipe line for HVAC System -
HVAC Chiller Plant MCC & TR SAP03 10 6.7
Building
Return pipe line for HVAC System -
HVAC Chiller Plant MCC & TR SAP03 10 12.2
Building
32/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 33 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
CORROSION
CLASS NO. : CS1 Class Rating : 150 ALLOWANCE :
2.54mm
SCHEDULE / TYPE /
ITEM SIZE (DN) MATERIAL REMARKS
RATING CONNECTION
PIPE 15 to 50 SCH.80 SMLS-PE A106-B
65 to 250 SCH.40 SMLS-BE A106-B
300 to 600 STD SMLS-BE A106-B
650 STD WELD-BE A134-A285C
GATE NONE
GLOBE NONE
33/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 34 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
34/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 35 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
35/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 36 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
36/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 37 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
CORROSION
CLASS NO. : CS2 Class Rating : 150 ALLOWANCE :
1.5mm
SCHEDULE / TYPE /
ITEM SIZE (DN) MATERIAL REMARKS
RATING CONNECTION
PIPE 15 to 50 SCH.80 SMLS-PE A106-B
65 to 250 SCH.40 SMLS-BE A106-B
300 to 600 STD SMLS-BE A106-B
650 to 1200 STD WELD-BE A672-C60-CL22 1)
1250 AWT 10 WELD-BE A672-C60-CL22
1300 to 1600 AWT 10 WELD-BE A134-A285C
1650 AWT 9 WELD-BE A134-A285C
2100 AWT 13 WELD-BE A134-A285C
FITTING 15 to 50 3000# SW A105
65 to 250 SCH.40 BW A234-WPB
300 to 600 STD BW A234-WPB
650 to 1200 STD BW A234-WPBW 1)
1250 to 1600 AWT 10 WELD-BE A234-WPBW
1650 AWT 9 WELD-BE A234-WPBW
2100 AWT 13 WELD-BE A234-WPBW
37/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 38 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
BALL NONE
38/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 39 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
39/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 40 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
40/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 41 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
41/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 42 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
42/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 43 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
43/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 44 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
44/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 45 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
45/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 46 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
46/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 47 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
47/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 48 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
Service -N2 Gas line from Pressure Reducing Valve to HRSG & Fuel Gas System
48/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 49 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
CORROSION
CLASS NO. : CS3 Class Rating : 300 ALLOWANCE :
1.5mm
SCHEDULE / TYPE /
ITEM SIZE (DN) MATERIAL REMARKS
RATING CONNECTION
PIPE 15 to 50 SCH.80 SMLS-BE A106-B
65 to 250 SCH.40 SMLS-BE A106-B
300 to 450 STD SMLS-BE A106-B
BOLT & All Sizes Stud Bolt with A193-B7 (GAL) : Bolt
NUT Heavy Hex Nut A194-2H (GAL) : Nut
REMARKS
1)Long Radius(1.5D) Elbows shall be generally used for all piping, Unless otherwise noted.
49/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 50 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
50/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 51 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
51/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 52 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
52/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 53 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
53/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 54 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
CORROSION
CLASS NO. : CS4 Class Rating : 300 ALLOWANCE :
1.25mm
SCHEDULE / TYPE /
ITEM SIZE (DN) MATERIAL REMARKS
RATING CONNECTION
PIPE 25 to 50 SCH.80 SMLS-BE A106-B
65 to 250 SCH.40 SMLS-BE A106-B
300 to 400 STD SMLS-BE A106-B
450 to 600 XS SMLS-BE A106-B
GATE NONE
GLOBE NONE
54/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 55 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
55/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 56 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
56/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 57 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
57/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 58 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
58/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 59 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
CORROSION
CLASS NO. : CS6 Class Rating : 600 ALLOWANCE :
1.25mm
SCHEDULE / TYPE /
ITEM SIZE (DN) MATERIAL REMARKS
RATING CONNECTION
PIPE 25 to 50 SCH.80 SMLS-BE A106-B
65 to 250 SCH.40 SMLS-BE A106-B
300 STD SMLS-BE A106-B
BOLT & All Sizes Stud Bolt with A193-B7 (GAL) : Bolt
NUT Heavy Hex Nut A194-2H (GAL) : Nut
GATE NONE
GLOBE NONE
REMARKS
1)Long Radius(1.5D) Elbows shall be generally used for all piping, Unless otherwise noted.
59/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 60 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
60/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 61 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
61/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 62 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
CORROSION
CLASS NO. : HCS9 Class Rating : 900 ALLOWANCE :
1.50 mm
SCHEDULE / TYPE /
ITEM SIZE (DN) MATERIAL REMARKS
RATING CONNECTION
PIPE 25 To 50 SCH.80 SMLS-BE A106-C
65 TO 350 SCH.80 SMLS-BE A106-C
REMARKS
1)Long Radius(1.5D) Elbows shall be generally used for all piping, Unless otherwise noted.
62/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 63 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
63/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 64 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
CORROSION
CLASS NO. : HCS9S Class Rating : 900SPCL ALLOWANCE :
1.50 mm
SCHEDULE / TYPE /
ITEM SIZE (DN) MATERIAL REMARKS
RATING CONNECTION
PIPE 20 To 50 SCH.80 SMLS-BE A106-C
65 TO 100 SCH.80 SMLS-BE A106-C
150 SCH.120 SMLS-BE A106-C
200 TO 600 SCH.100 SMLS-BE A106-C
REMARKS
1)Long Radius(1.5D) Elbows shall be generally used for all piping, Unless otherwise noted.
64/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 65 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
65/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 66 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
CORROSION
CLASS NO. : CS15 Class Rating : 1500 ALLOWANCE :
1.5mm
SCHEDULE / TYPE /
ITEM SIZE (DN) MATERIAL REMARKS
RATING CONNECTION
PIPE 15 to 80 SCH.160 SMLS-BE A106-C
100 to 200 SCH.120 SMLS-BE A106-C
250 SCH.140 SMLS-BE A106-C
BOLT & All Sizes Stud Bolt with A193-B7 (GAL) : Bolt
NUT Heavy Hex Nut A194-2H (GAL) : Nut
REMARKS
1)Long Radius(1.5D) Elbows shall be generally used for all piping, Unless otherwise noted.
66/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 67 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
67/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 68 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
CORROSION
CLASS NO. : HCS15 Class Rating : 1500 ALLOWANCE :
1.5mm
SCHEDULE / TYPE /
ITEM SIZE (DN) MATERIAL REMARKS
RATING CONNECTION
PIPE 25to 50 SCH.160 SMLS-BE A106-C
65 to 150 SCH.160 SMLS-BE A106-C
200 to 400 SCH.140 SMLS-BE A106-C
BOLT & All Sizes Stud Bolt with A193-B7 (GAL) : Bolt
NUT Heavy Hex Nut A194-2H (GAL) : Nut
REMARKS
1)Long Radius(1.5D) Elbows shall be generally used for all piping, Unless otherwise noted.
68/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 69 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
69/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 70 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
CORROSION
CLASS NO. : CS25 Class Rating : 2500 ALLOWANCE :
1.5mm
SCHEDULE / TYPE /
ITEM SIZE (DN) MATERIAL REMARKS
RATING CONNECTION
PIPE 15 to 25 SCH.160 SMLS-BE A106-B
BOLT & All Sizes Stud Bolt with A193-B7 (GAL) : Bolt
NUT Heavy Hex Nut A194-2H (GAL) : Nut
GATE NONE
REMARKS
1)Long Radius(1.5D) Elbows shall be generally used for all piping, Unless otherwise noted.
70/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 71 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
71/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 72 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
CORROSION
CLASS NO. : CSG Class Rating : 150 ALLOWANCE :
1.5mm
SCHEDULE / TYPE /
ITEM SIZE (DN) MATERIAL REMARKS
RATING CONNECTION
PIPE 15 to 50 SCH.80 THRD(NPT) A53 Gr. B (GAL)
65 to 100 SCH.40 SMLS-BE A53 Gr. B (GAL)
BOLT & All Sizes Stud Bolt with A193-B7 (GAL) : Bolt
NUT Heavy Hex Nut A194-2H (GAL) : Nut
GATE NONE
GLOBE NONE
REMARKS
1)Long Radius(1.5D) Elbows shall be generally used for all piping, Unless otherwise noted.
72/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 73 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
73/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 74 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
CORROSION
CLASS NO. : CSRL Class Rating : 150 ALLOWANCE :
0 mm
SCHEDULE / TYPE /
ITEM SIZE (DN) MATERIAL REMARKS
RATING CONNECTION
PIPE 25 to 50 SCH.80 SMLS-PE A106Gr.B + 3mm R/L
65 to 150 SCH.40 SMLS-BE A53Gr.B + 3mm R/L
74/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 75 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
75/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 76 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
CORROSION
CLASS NO. : PA3 Class Rating : 300 ALLOWANCE :
2.54mm
SCHEDULE / TYPE /
ITEM SIZE (DN) MATERIAL REMARKS
RATING CONNECTION
PIPE 25 to 50 SCH.80 SMLS-BE A335-P11
65 to 350 STD SMLS-BE A335-P11
650 XS WELD-BE A691-2.25Cr-22 1)
1000 12 AWT WELD-BE A691-2.25Cr-22 2)
1250 20 AWT WELD-BE A691-2.25Cr-22 3)
FITTING 25 to 50 SCH.80 BW A182-F11
65 to 350 STD BW A234-WP11
650 XS BW A234-WP22W 1)
1000 12 AWT BW A234-WP22W 2)
1250 20 AWT BW A234-WP22W 3)
FLANGE 100 to 150 300# WN-RF A182-F11
GASKET NONE
REMARKS
1) Start-up Bypass Downstream line (straight pipe)
2) HP/LP Pressure Reducing & Desuperheating Station Downstream line (straight pipe)
3) Turbine Steam Seal Desuperheater downstream line (straight pipe)
1) Long Radius(1.5D) Elbows shall be generally used for all piping, Unless otherwise noted.
76/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 77 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
77/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 78 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
78/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 79 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
79/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 80 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
80/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 81 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
CORROSION
CLASS NO. : HPA3 Class Rating : 300 ALLOWANCE :
1.50mm
SCHEDULE / TYPE /
ITEM SIZE (DN) MATERIAL REMARKS
RATING CONNECTION
PIPE 25 to 50 SCH.80 SMLS-BE A335-P22
65 to 400 STD SMLS-BE A335-P22
REMARKS
1)Long Radius(1.5D) Elbows shall be generally used for all piping, Unless otherwise noted.
81/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 82 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
82/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 83 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
CORROSION
CLASS NO. : PA6 Class Rating : 600 ALLOWANCE :
2.54mm
SCHEDULE / TYPE /
ITEM SIZE (DN) MATERIAL REMARKS
RATING CONNECTION
PIPE 25 to 50 SCH.80 SMLS-BE A335-P22
65 to 150 SCH.80 SMLS-BE A335-P22
FLANGE NONE
GASKET NONE
REMARKS
1)Long Radius(1.5D) Elbows shall be generally used for all piping, Unless otherwise noted.
83/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 84 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
84/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 85 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
CORROSION
CLASS NO. : PA15 Class Rating : 1500 ALLOWANCE :
2.54mm
SCHEDULE / TYPE /
ITEM SIZE (DN) MATERIAL REMARKS
RATING CONNECTION
PIPE 25 to 50 SCH.160 SMLS-BE A335-P91
65 to 80 SCH.160 SMLS-BE A335-P91
100 to 600 SCH.120 SMLS-BE A335-P91
650 41 MWT SMLS-BE A335-P91
FLANGE NONE
GASKET NONE
REMARKS
1)Long Radius(1.5D) Elbows shall be generally used for all piping, Unless otherwise noted.
85/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 86 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
86/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 87 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
CORROSION
CLASS NO. : HPA25 Class Rating : 2500 ALLOWANCE :
1.5mm
SCHEDULE / TYPE /
ITEM SIZE (DN) MATERIAL REMARKS
RATING CONNECTION
PIPE 25 to 50 SCH.160 SMLS-BE A335-P91
65 to 80 SCH.160 SMLS-BE A335-P91
FLANGE NONE
GASKET NONE
GATE NONE
GLOBE NONE
STOP&CHECK NONE
REMARKS
1)Long Radius(1.5D) Elbows shall be generally used for all piping, Unless otherwise noted.
87/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 88 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
88/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 89 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
CORROSION
CLASS NO. : 316L1 Class Rating : 150 ALLOWANCE :
1.25mm
SCHEDULE / TYPE /
ITEM SIZE (DN) MATERIAL REMARKS
RATING CONNECTION
PIPE 15 to 50 SCH.40S SMLS-PE A312-TP316L
65 to 100 SCH.10S SMLS-BE A312-TP316L
150 to 550 SCH.10S WELD-BE A312-TP316L
REMARKS
1)Long Radius(1.5D) Elbows shall be generally used for all piping, Unless otherwise noted.
89/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 90 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
90/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 91 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
91/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 92 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
92/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 93 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
93/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 94 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
CORROSION
CLASS NO. : 316L2 Class Rating : 150 ALLOWANCE :
1.25 mm
SCHEDULE / TYPE /
ITEM SIZE (DN) MATERIAL REMARKS
RATING CONNECTION
PIPE 15 to 50 SCH.40S SMLS-PE A312-TP316L
65 to 100 SCH.10S SMLS-BE A312-TP316L
150 to 500 SCH.10S WELD-BE A312-TP316L
REMARKS
1)Long Radius(1.5D) Elbows shall be generally used for all piping, Unless otherwise noted.
2)Check Valves at pump discharge shall be of the balanced disc type.(Pan Check)
Swing type check valves are installed for all other services.
94/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 95 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
95/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 96 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
CORROSION
CLASS NO. : 316L3 Class Rating : 300 ALLOWANCE :
1.25mm
SCHEDULE / TYPE /
ITEM SIZE (DN) MATERIAL REMARKS
RATING CONNECTION
PIPE 15 to 250 SCH.40S SMLS-BE A312-TP316L
REMARKS
1)Long Radius(1.5D) Elbows shall be generally used for all piping, Unless otherwise noted.
96/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 97 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
97/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 98 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
Service - Fuel Gas Final Filter Outlet to GT Gas Supply Skid Inlet
98/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 99 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
99/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 100 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
CORROSION
CLASS NO. : 316L15 Class Rating : 1500 ALLOWANCE :
1.25mm
SCHEDULE / TYPE /
ITEM SIZE (DN) MATERIAL REMARKS
RATING CONNECTION
PIPE 15 to 25 SCH.80S SMLS-BE A312-TP316L
REMARKS
1)Long Radius(1.5D) Elbows shall be generally used for all piping, Unless otherwise noted.
100/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 101 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
101/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 102 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
CORROSION
CLASS NO. : 316SS1 Class Rating : 150 ALLOWANCE :
1.25mm
SCHEDULE / TYPE /
ITEM SIZE (DN) MATERIAL REMARKS
RATING CONNECTION
PIPE 15 to 25 SCH.40S SMLS-PE A312-TP316
GLOBE NONE
CHECK NONE
REMARKS
1)Long Radius(1.5D) Elbows shall be generally used for all piping, Unless otherwise noted.
102/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 103 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
103/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 104 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
104/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 105 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
105/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 106 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
CORROSION
CLASS NO. : 316SS3 Class Rating : 300 ALLOWANCE :
1.25mm
SCHEDULE / TYPE /
ITEM SIZE (DN) MATERIAL REMARKS
RATING CONNECTION
PIPE 15 to 25 SCH.40S SMLS-BE A312-TP316
GLOBE NONE
CHECK NONE
REMARKS
1)Long Radius(1.5D) Elbows shall be generally used for all piping, Unless otherwise noted.
106/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 107 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
107/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 108 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
108/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 109 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
CORROSION
CLASS NO. : 316SS6 Class Rating : 600 ALLOWANCE :
1.25mm
SCHEDULE / TYPE /
ITEM SIZE (DN) MATERIAL REMARKS
RATING CONNECTION
PIPE 15 to 25 SCH.40S SMLS-BE A312-TP316
GLOBE NONE
CHECK NONE
REMARKS
1)Long Radius(1.5D) Elbows shall be generally used for all piping, Unless otherwise noted.
109/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 110 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
110/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 111 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
111/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 112 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
112/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 113 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
CORROSION
CLASS NO. : 316SS15 Class Rating : 1500 ALLOWANCE :
1.25mm
SCHEDULE / TYPE /
ITEM SIZE (DN) MATERIAL REMARKS
RATING CONNECTION
PIPE 15 to 25 SCH.80S SMLS-BE A312-TP316 3)
GLOBE NONE
CHECK NONE
REMARKS
1) 1500# SPCL class shall be applied to HRSG feedwater pump discharge line.
2)Long Radius(1.5D) Elbows shall be generally used for all piping, Unless otherwise noted.
113/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 114 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
114/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 115 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
115/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 116 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
EQUATION PⅹDo
(ASME B31.1)
t m= +A
2(SE+Py)
116/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 117 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
CORROSION
CLASS NO. : GRP1 Class Rating : 150 ALLOWANCE :
1.5mm
SCHEDULE / TYPE /
ITEM SIZE (DN) MATERIAL REMARKS
RATING CONNECTION
PIPE 25 to 2100 Manufacturer's Butt & Strap GRP
standards
117/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 118 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
118/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 119 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
CORROSION
CLASS NO. : PEHD1 Class Rating : 150 ALLOWANCE :
0mm
SCHEDULE / TYPE /
ITEM SIZE (DN) MATERIAL REMARKS
RATING CONNECTION
PIPE 25 to 50 STD PE PEHD Heat fusion
65 to 200 STD PE PEHD Jointing
Polypropylene/EPDM BALL
CHECK 15 to 200 150# FF
Polypropylene/PTFE SWING
A216 Gr. WCB LUGGED
GATE 40 to 100 150# -
Disc. A351-CF8M WAFER
A182-F316 REDUCING
BALL 15 to 50 600# NPT
or P.P BORE
Polypropylene/EPDM
DIAPHRAGM 15 to 250 150# FF WEIR
or Polypropylene/PTFE
PSV 15 to 150 150# FF P.P FLANGED
REMARKS
1)Long Radius(1.5D) Elbows shall be generally used for all piping, Unless otherwise noted.
119/120
DOC. NO. : CNE/001/2006-W-EQ-M-T-13001
AS-BUILT REV.0
Project Name : Jebel Ali Power and Desalination Station 'M' 120 of 120
Subject : Piping Material Specification 2014-02-19
Doc. No. : CNE/001/2006-W-31-M-T-13001 Rev. 1
CORROSION
CLASS NO. : CH2 Class Rating : PN16 ALLOWANCE :
1.5mm
SCHEDULE / TYPE /
ITEM SIZE (DN) MATERIAL REMARKS
RATING CONNECTION
PIPE 15 to 50 SCH.80 SMLS-PE A106-B
GATE SCREWED
15 to 50 PN16 NPT Bronze
BONNET
65 to 800 PN16 FF Cast iron BB, NRS
GLOBE 15 to 50 PN16 NPT Bronze
BALL 15 PN16 NPT Bronze
50 PN16 NPT Ductile Iron
CHECK SCREWED CAP,
15 to 50 PN16 NPT Bronze Disc
SWING
65 to 400 PN16 FF Cast Iron BC, SWING 2)
BUTTERFLY 65 to 400 PN16 LUG Ductile Iron
REMARKS
1) Long Radius(1.5D) Elbows shall be generally used for all piping, Unless otherwise noted.
2) The check valve (DN 400) installed in CHB Pump discharge line shall be of Triple duty valve type with moc
(material of construction) of A536 Gr.65-45-12.
120/120