The document provides an overview of IEC 61850, an international standard for communication networks and systems in substations. It discusses the history and requirements that led to the development of IEC 61850. The standard is organized into multiple parts that define logical models and interfaces, the configuration language SCL, abstract communication services, and over 350 data classes. IEC 61850 aims to support interoperability, flexible configuration, and long-term stability for substation automation systems.

Uploaded by

Tamilventhan_s
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
188 views42 pages

08 - IEC 61850 Overview

The document provides an overview of IEC 61850, an international standard for communication networks and systems in substations. It discusses the history and requirements that led to the development of IEC 61850. The standard is organized into multiple parts that define logical models and interfaces, the configuration language SCL, abstract communication services, and over 350 data classes. IEC 61850 aims to support interoperability, flexible configuration, and long-term stability for substation automation systems.

Uploaded by

Tamilventhan_s
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 42

IEC 61850 overview

Presentation on IEC 61850


One more protocol ...

¾Substation protocols
ƒModbus
ƒCourrier
ƒLoan
ƒProfibus
ƒInterbus
ƒCAN
ƒT103 VDEW
ƒSEL protocol
ƒGE protocols
ƒ… and many others
3 > Title of presentation – IEC 61850 3
History

X UCA : Utility Communications Architecture

4 > Title of presentation – IEC 61850 4


Evolution of communication in SAS

… in comparison with currently used protocols


5 > Title of presentation – IEC 61850 5
Requirements for the Standard

Interoperability The ability for IED’s from one or several


manufacturer to exchange information and use the information
for the their own functions.

Free configuration The standard shall support different


philosophies and allow a free allocation of functions e.g. it must
work equally well for centralized (RTU like) or decentralized
(SCS like) systems.

Long term stability The standard shall be future proof, i.e. it


must be able to follow the progress in communication technology
as well as evolving system requirements.

High level benefits

6 > Title of presentation – IEC 61850 6


Communication requirement

X Communication services:
Š How to transfer data ?
X Communication objects
Š How to address data ?
X Configuration
Š How to share data addresses between applications
X Testing
Š How to organize communication tests ?

Conventional communication standard mainly address


the communication services

7 > Title of presentation – IEC 61850 7


IEC 61850 Standard - Organization

8 > Title of presentation – IEC 61850 8


IEC 61850 Standard - Parts 1,2,3,4

X Parts 1
Š Introduction, glossary, but also some project management
requirements (quality, versions, system life cycle)
X Parts 2
Š glossary
X Part 3
Š quality insurance
X Part 4
Š ... also some project management requirements

9 > Title of presentation – IEC 61850 9


IEC 61850 Standard - Part 5

X Part 5
Š Defines logical allocation of functions and interfaces

10 > Title of presentation – IEC 61850 10


IEC 61850 Standard - Part 5

X Rules definition for functions


a) Function description including the decomposition into LNs.
z Task of the function, Starting criteria , Result or impact, Performance, Function
decomposition.

b) Logical node description including the exchanged PICOMs.


z grouping according to their most common application area
z short textual description of the functionality
z IEEE device function number if applicable (for protection and some protection related
logical nodes only
z abbreviation/acronym used within the documents of the IEC 61850 series
z relation between functions and logical nodes in tables and in the function description
z exchanged PICOMs described in tables

c) PICOM description including the attributes.


Piece of Information for COMmunication describing an information transfer on a given
logical connection with given communication attributes between two logical nodes.
z semantics
z logical point-to-point connection
z performance requirements
z type of data

11 > Title of presentation – IEC 61850 11


IEC 61850 Standard - Part 5

X Logical Node and Logical Link concept

12 > Title of presentation – IEC 61850 12


IEC 61850 Standard - Part 5

X Logical Node and Logical Link concept - Example

13 > Title of presentation – IEC 61850 13


IEC 61850 Standard - Part 6
Substation Configuration Language (SCL)

X Description language for communication in electrical


substations related to the IEDs

X XML based language that allows a formal description of


Š Substation automation system and the switchyard and the
relation between them
z IED configuration

Substation Configuration Language (SCL)

ƒ SSD: System Specification Description.


XML description of the entire system.

ƒ SCD: Substation Configuration Description.


XML description of a single substation.

ƒ ICD: IED Capability Description.


XML description of items supported by an IED.

ƒ CID: Configured IED Description.


XML configuration for a specific IED.

14 > Title of presentation – IEC 61850 14


IEC 61850 Standard - Parts 7-x

X Part 7-1
Š Principles and models
Introduces ALL the features detailed in 7-2, 7-3, 7-4

15 > Title of presentation – IEC 61850 15


IEC 61850 Standard - Parts 7-2

X Abstract Communication Service Interface (ACSI)


Š Core of IEC 61850 standard
Š Abstract to respect “long term stability” requirement
Š Interface defined in terms of services and objects

16 > Title of presentation – IEC 61850 16


IEC 61850 Standard - Parts 7-2

X ACSI requirements
Š real-time data access and retrieval,
Š device control,
Š event reporting and logging,
Š publisher/subscriber,
Š self-description of devices (device data dictionary),
Š data typing and discovery of data types
Š file transfer.

17 > Title of presentation – IEC 61850 17


IEC 61850 Standard - Parts 7-2

Conceptual service model


18 > Title of presentation – IEC 61850 18
ACSI Models

Server

Logical Device
Logical Node Reporting
& Logging
Data
Control
Data Set GOOSE
Substitution Object Sampled
Settings Values

Association Time Synchronization File Transfer

Detailed functions are not specified, only interfaces


Setting is for group only, detailed setting not addressed

19 > Title of presentation – IEC 61850 19


IEC 61850 Standard - Parts 7-2

ACSI classes
20 > Title of presentation – IEC 61850 20
IEC 61850 Standard - Parts 7-3

– Data classes and example

21 > Title of presentation – IEC 61850 21


IEC 61850 Standard - Parts 7-3

FC are
families

22 > Title of presentation – IEC 61850 22


IEC 61850 Standard - Parts 7-4

– 355 Data classes

23 > Title of presentation – IEC 61850 “UCA & 61850 for Dummies.” – Douglas 23
Proudfoot
IEC 61850 Class Model

Name SERVER Physical Device:


ObjectName access by network address
ObjectReference
1
1..*

LOGICAL-DEVICE Enables data from multiple


devices to be aggregated
1 into a single physical device
1..* (data concentrator)
LOGICAL-NODE

1
1..*

DATA

1
1..*

DataAttribute

24 > Title of presentation – IEC 61850 24


IEC 61850 Logical Node

Logical Nodes

X A named grouping of data and associated services that is


logically related to some power system function.

dddXCBR1
Logical Node Instance #
Logical Node Name per
IEC 61850-7-4 (breaker)
Optional Application Specific Prefix

25 > Title of presentation – IEC 61850 25


IEC 61850 Logical Node Description

SPS

Mandatory/Optional
Common Data Class
Data Name Description

26 > Title of presentation – IEC 61850 26


IEC 61850 Object Name Structure

Relay1/XCBR1$ST$Loc$stVal
Attribute
Data
Functional Constraint
Logical Node
Logical Device

27 > Title of presentation – IEC 61850 27


IEC 61850 Reporting

XUnbuffered Reporting is equivalent to UCA2 reports

XBuffered reporitng enables the server to retain data if


associations are lost enabling the client to retrieve ALL data.

28 > Title of presentation – IEC 61850 28


IEC 61850 Key Benefits
X Speed: 100 Mbps instead of few 10 kbps
Š More data for a better operation & maintenance
X Peer-to-peer: No extra hardware
Š Design of innovative automation schemes, late tuning
X Conditional report instead of polling
Š Optimal performances
X IP (Internet Protocol) routing: Ubiquitous data access
Š Capability to extend the system outside of the substation
X Client-server: Instead of master-slave
Š Flexible designs easy to upgrade
X Pre-defined names: Single vocabulary between users
Š Easier engineering between teams
X XML references: Formal interfaces
Š Consistency between engineering tools

A true step forward

29 > Title of presentation – IEC 61850 29


Data mapping

What is “rose”?

X Modelling is essential
when integrating
applications. a flower?

X Model mismatch implies


translation and usually
(at first) a color?
miscommunication

a paint?

Non trivial tests

30 > Title of presentation – IEC 61850 30


Logical architecture: Scope
TRADITIONNAL (> 80%) IEC 61850 POTENTIAL IMPACT

Maintenance
Dispatching Dispatching Maintenance
Center
Center
WAN WAN
Station
SAS
SAS
Process Bay

Process
bus
WAN

Primary Other Primary Other


devices substations devices substations

Scalable & adaptable:


Substation centric
from process bus to
Pretty Monolithic
network automation

IEC 61850: Think out of the box !


31 > Title of presentation – IEC 61850 31
Communication services

32 > Title of presentation – IEC 61850 32


Peer-to-peer

X Capability to have a direct


communication exchange
between any two devices
connected on the network
Š Unlike conventional master-slave GOOSE
Receiver
Š Enable the development of fast
automation
Device Y
GOOSE
Sender
Device X

Ethernet
GOOSE
Receiver
Device Z

33 > Title of presentation – IEC 61850 33


Client-server vs. Master-slave

X In a master-slave relation only one master is acting as a time


Š The master pools the various clients then distribute the
information to the applications
Š If the master fails then a back-up master may be used

X In a client-server relation each application (client) request in


parallel what the exactly need to each server
Š Client are typically HMI and Gateway, server are typically bay
controller, protection, measurement center
Š Applications do not go through a central point therefore get the
information on a faster and more reliable way
Š Failure of a client does not affect the other clients
Š A new client might be added without changing the existing
communications

34 > Title of presentation – IEC 61850 34


Report vs. polling

X Report is transmitting data based on a condition being met


Š Ex: Change of state, value, quality attribute, time-out

X Report is more efficient than polling


Š Data are transmitted only when there is a need to transmit them,
therefore reducing network and application load
Š Polling cycle might be too long compared to the application
dynamic and loose event, contrary to report

X Report is fully compatible with client-server mode


Š It can be emulated on master-slave mode but less eficiently

35 > Title of presentation – IEC 61850 35


Self-describing data

X A client can discover the


device server’s capabilities
X Comparable to the services of
a web browser

X Used initially when defining the


system configuration or during
tuning/maintenance of the
system

36 > Title of presentation – IEC 61850 36


Communication data modelling

– Logical groupings – Devices, nodes, classes and data.

37 > Title of presentation – IEC 61850 “UCA & 61850 for Dummies.” – Douglas Proudfoot 37
Example

LN function-related in the substation Control


Q0/CSWI
Q8/CSWI
Q9/CSWI
Bay-HMI
IHMI
Earthing Switch
Q8_L1/XSWI
Gas density mon.
Q8_L1/SIMG

Secondary
Isolator
Q9_L1/XSWI
technology
Gas density mon.
Q9_L1/SIMG

Circuit Breaker
Q0_L1/XCBR Distance
Gas density mon. Protection
Q0_L1/SIMG
Primary technology PDIS

See IEC 61850-5, 7-4


38 > Title of presentation – IEC 61850 38
Logical Node Classes

– Logical Nodes – 92 Logical Node Classes

39 > Title of presentation – IEC 61850 “IEC61850-7–1 standard” 39


Reference model for the configuration process

IED Capabilities System specification


(LN, DO, …) (Single line, LNs, …)
IED System
DB ICD Configurator SSD

SCD Associations,
relation to single line,
preconfigured reports, ...
IED
Engineering Configurator
Workplace
Engineering environment File transfer
CID remote
SA system
File transfers and parameterization
File transfer
Substation with IEC61850 services
Local gateway

IED IED IED

40 > Title of presentation – IEC 61850 40


Testing Terminology

X PICS
Š Protocol Implementation Conformance Statement
X MICS
Š Model Implementation Conformance Statement
X PIXIT
Š Protocol Implementation eXtra Information for Testing

Conformance testing only, i.e. vs. a reference simulator


Not interoperability not functional testing

41 > Title of presentation – IEC 61850 41


IEC 61850: Basic applications and possible
extensions
ƒ Telecontrol of substations “sTCA”
in discussion, IEC TC57 / Ad Hoc Working Group 07
ƒ Addendum Power Quality, Monitoring
under way, IEC 57/624/NP
ƒ Product standard for switchgear equipment
under way, IEC 62271-003
ƒ Control and monitoring of wind power plants
under way, IEC 61400-25
ƒ Control and monitoring of distributed power stations
under way, IEC 57/660/NP
ƒ Control and monitoring of hydroelectric power plants
under way, IEC 57/661/NP
ƒ Metering (EPRI, IEEE), Gas, Water
in discussion
ƒ Several other WG within:
ƒIEEE PSRC H5: Setting, etc.
ƒUCA International: Testing, etc.
ƒCIGRE B5.11: Use of IEC 61850 in substation, etc.
ƒDKE/VDN (Germany): Recommendations
42 > Title of presentation – IEC 61850 42
Where we are – Where we go

Market Control
IEC 61970 EMS Centre 2
EC, EDI Participant Power
ISO 9735 Plant
Server
IEC 60870-6 (TASE.2)
IEC 61850
IEC 61968 DMS
Control Centre 1

IEC 61850 IEC 6


1400
-25
IEC 62210
IE
IEC 61850 C
62
05
6
Substation 1 Substation 2

IEC 61850 IEC 61850

Metering
CT CT
VT VT Billing

43 > Title of presentation – IEC 61850 43