0% found this document useful (0 votes)
145 views2 pages

Amp Netconnect Amp-Twist 6S SL Jacks 1711160-2 and 1711342-2

Blindados Instructivo

Uploaded by

8cesar5
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
145 views2 pages

Amp Netconnect Amp-Twist 6S SL Jacks 1711160-2 and 1711342-2

Blindados Instructivo

Uploaded by

8cesar5
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

AMP NETCONNECT* Instruction Sheet

AMP-TWIST* 6S SL Jacks 408-131900


1711160-2 and 1711342-2 13 NOV 15 Rev A1

Wiring Slots Universal


Wiring Label

Part Number Performance Standard Dust Cover Option


1711342-2
1711160-2 TIA-568-C.2 Cat 6A / ISO 11801 Class EA with Dust Cover
1711342-2 TIA-568-C.2 Cat 6A / ISO 11801 Class EA without Dust Cover 1711160-2
Figure 1

1. INTRODUCTION
This instruction sheet provides termination procedures for the modular jacks given in Figure 1. The SL Series
Jack Tool (1725150-3) is required for proper termination of the jacks covered by this procedure.

2. DESCRIPTION
Each modular jack accepts 4-pair, twisted-pair cable with solid conductor sizes 26 through 22 AWG (0.40 mm
to 0.60 mm diameter) or stranded conductor sizes 26 through 24 AWG with a conductor insulation diameter
range of 0.8 mm to 1.6 mm [.03 in. to .06 in.], and cable jacket outer diameter range 5.0 mm to 9.0 mm [.20 in.
to .35 in.]. The modular jack features a universal wiring label used to aid in proper wire color coding and a
wiring block that terminates the wire. The AMP-TWIST Jack fits into an SL Series panel opening.

3. CABLE PREPARATION, JACK ASSEMBLY AND TERMINATION

 S/FTP and F/FTP (Compact) cable: Prepare the cable and  Color coding according to T568A or T568B as
cut the pair foils as shown. required.

 Push the cable clamp to open it.  Insert the cable through the cable clamp hole
until pair foil is visible on the opposite side.
Release the cable clamp, ensuring that the
clamp makes good contact with the cable shield.
NOTE
The metal braid (S/FTP),
metal foil (F/FTP), and
drain wire (if any) must be
in contact with the clamp.

Figure 2 (continued)

© 2015 CommScope, Inc. 1 of 2


All rights reserved
408-131900

 Sort the wires and place them into  Push the rear housing into the front
slots according to relevant color housing until engaged.
coding.
NOTE
To avoid damage the dust
cover and/or connector, the
dust cover must be opened
prior to insertion into the tool.

Open Dust Cover


before next step

 Position the pre-assembled jack into  The wires are cut automatically. With the SL  The connector is now
the SL Tool (1725150-3). Squeeze the Tool handle in the closed position, remove terminated and ready to be
handle until the rear housing latches to the excess wires and discard. installed into the application.
the front housing.

Figure 2 (end)

4. JACK DISASSEMBLY

 To re-open the jack, carefully insert a small screwdriver into  Use the small screwdriver to gently pry the rear housing away
the slots at the rear of the jack (on both sides of the jack). from the front housing.

Figure 3

5. REPLACEMENT
Do not use damaged or defective product. These modular jacks are not repairable.

6. REVISION SUMMARY
 US version: Initial release.
 Please see 411-93007 for international version of this instruction sheet.
 Revision A1 corrects document security classification error (change from Class 3 to Class 1).

Rev A1 2 of 2

You might also like