Installation Manual Model 4000 15000 C

Download as pdf
Download as pdf
You are on page 1of 34
INSTALLATION MANUAL MODEL 4000C 6000 C 8000 C 8000 C 2T 10000 C 12000 C 15000 C HydroHoist Boat Lifts ga P.O, Box 1286 / Claremore, OK 74018 SBS Phone (918) 341-6811 « 3/89 CAUTION PLEASE READ AND UNDERSTAND ALL INSTRUCTIONS INCLUDED IN THIS MANUAL BEFORE ASSEMBLNG LIFT. Assembly, installation, or repair of HydroHoist boat lifts should only be performed by an authorized HydroHoist technician. Assembly, installation, or repair performed by any others could result in personal injury, or in property damage to the lift, boat, or dock. Te To AERA IF YOU HAVE ANY QUESTIONS ABOUT THE ASSEMBLY OF THE LIFT PLEASE CONTACT: HYDROHOIST INTERNATIONL, INC. CUSTOMER SERVICE veme.con 1-800-825-3379 *** DISCLAIMER *** *** CAUTION **# Assembly, installation, or repair of HydroHoist boat lifts should only be performed by an authorized HydroHoist technician, Assembly, installation, or repair performed by any others ‘could result in personal injury, or in property damage to the lit, boat, or dock. IN THE EVENT THAT ANY UNAUTHORIZED PERSON ATTEMPTS TO ASSEMBLE, INSTALL, OR REPAIR A HYDROHOIST BOAT LIFT, HYDROHOIST INTERNATIONAL, INC. HEREBY DISCLAIMS ANY AND ALL WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING BUT NOT LIMITED TO HYDROHOIST’S NORMAL LIFT WARRANTY, AND THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. INTRODUCTION \This manual contains the assembly, installation, adjustment, and y ‘operating instructions for Models 4000C, 6000C, s8000C, s00Qc-2T, 10000C, 12000C, and 15000C HydroHoists. All paragraphs that apply to a specific model are identified at the beginning of that paragraph (4=4000C, @=8000c, etc.). All paragraphs identified (ALL) apply to all ¢ models. All references to left and right are considered to be looking forward from the rear of the hoist. All numbers in parentheses () after part names refer to the iten numbers on the exploded view illustration of that mode:. The manual is divided into four sections as follows: ction T -~ Assembly Section II -~ Installation Section III -- Operation Section IV -~ Do's and Don'ts Assembly should be done on a trailer. A flat bed trailer is preferred but a boat trailer with planks across the frame will work. Make certain the trailer assembly surface is flat and level. — Model Tank Dimensions 4000C 24" x 16" A 123" 6000C. 2 | 24" x 16" A 1454" 1 24" x 16" A 14 535"" 8000C 4 24" x 16" A 145%" 8000C2 2 32" x 16° A 10000C 2 32" x23! B oy 12000C iz 32" x 23" B ea" : 32" x 16' A 15000C ud 32" x 23' B Ba" TANK BAND LOCATIONS 2. (ALL) 2. (ALL) 3. (ALD) 4. (ALE) SECTION I A Ly Inspect the slip in which the hoist will be installed. a. The slip should have good, sturdy structure, either wood or steel, on each side, b. The dock brackets, which will be mounted two on each side of the slip, have a minimum gripping distance of four inches and a maximum of 2: inches. Measure the width of the slip. Measure at both front and rear to determine that slip fingers are parallel. Make note of the width. It will be used during assembly. Install upper (1) and lower (2) tank brackets and attach with 3/8 x - 1/2 inch bolts, nuts, and lockwashers. With the air injection nipple (in the front end cap) UP the upper tank brackets must be level and parallel. Locate tank brackets front to rear as shown in the matrix on next page. Do not tighten. Align the tanks parallel and approximately four feet narrower, outside to-outside, than the slip, and with the tank bands aligned. If the hoist has more than two tanks set the middle tanks equidistant between the outside ones. 5.(4,8,8,8-2T) Place a long (7'11") channel (3) on the right rear tank bracket (1) with the flanges forward. Leave four holes exposed outboard of the tank bracket. Attach with two 1/2 x 11/2" bolts, nuts, and lockwashers, Do not tighten. 6.(4,6,8,82t) Place a short (6'8") channel(4) on the left rear tani: bracket (1) with the flanges to the rear. Leave four holes exposed outboard of the tank bracket. Attach with two 1/2 x 11/2 bolts, nuts, and lock washers. Do not tighten. 7.(4,8,8,82t) Move the tanks in or out until the channels (3) and (4), 8.(6,8) end to end, are 15 to 18" narrower than the slip. Align the center tank or tanks equidistant between the outside tanks with the flanges sandwiched between the channels. Install as in previous steps. a) Freure 1, 4C00C exeropep view (2) CABLE POST INSTALLATION ( 4, 6, 8, 8-2T ) C3) 10, ll. 12. 1s. 14, (4,6,8,8-27) Repeat steps 5-8 at the front, placing the long (7'11") channel (3) on the right with flanges forward and the short (6'8") channel (4) on the left with the flanges to the rear. (4,6,8,8-27) Sandwich the vee bracket (5) between channels (3) and (4) centered at the front of the hoist. Attach with two 1/2 x 11/2 inch bolts, nuts, and lockwashers. Do not tighten. (10,12,15) Install a keel spanner (37. 1/2") channel (6) on the front and rear outboard tank brackets (1). The front spanners (6) have flanges facing rearward and the rear spanners (6) have flanges facing forward. Leave four holes exposed outboard of the tank brackets. (1) and attach each spanner (6) with two 1/2 x 1 1/2 inch bolts, nuts, and lockwashers. Do not tighten. (10,12,15) Move the tanks “in or out until the spanners (6) end-to-end are 15" to 18" narrower than the slip. (10,12,15) Install end channel (7) across the tenk brackets (1) both front and rear, The rear end channel should have flanges facing rearward and the front should face forward, Attach with six 1/2 x 1 1/2 inch bolts, nuts, and lockwashers using those installed in step 11 as necessary. Do not tighten. (12) Center the middle tank (8) and attach to the rear end channel (1) using three 1/2 x 1 1/2 inch bolts, nuts, and lockwashers. Do not tighten. a) Figure 2, 6000C/80000 exPLopeD VIEW 5) 18. (15) Center the middle tank (8) and attach to the front (7) and rear end channels using six 1/2 x 11/2" bolts, nuts, and lockwashers, 16.(10,12,18) Install a cable support assembly (9) on the end channel 37. (4,6,8 18. (ALL) 19.(10) 20.(10) 21.(10) (6) at each corner of the hoist. Make certain that on each side of the hoist the side rail attach flanges are pointing toward each other. Attach each cable support with two 1/2 x 11/2" blot, nut flatwasher and lockwasher. Flatwashers against the slot. Do not tighter: ,82t; Install a cable support assembly (9) on the channels (3,4) at each corner. Make certain that the bottom pulley of the cable support assembly that guides the cable across the lift is located between the front and rear channels of the lift. If not remove and install pulley on oppocite side of the post. Attach cable pest to end channel as in step 16. Install a side rail (10) between the cable stpports (#) on each side of tne hoist. Attach each with fou: 1/2 xi 1/2" bolt, nut, flatwasher, and lockwasher. Do not tighten. Install 2 center channel mount (11) to each side channel (10) to align with the middle tank brackets. Refer to figure 4 and note that the mounts face in the opposite direction Attach. Install long (7' 11") center channel (14) to the right bracket (i:) with the bracket between the flanges of the channel(14). Attach with one 1/2 x 1 1/2 bolt, nut, flatwasher, lockwasher. Install @ short (6'8") center channel (15) to the left bracket between the flanges of the channel. attach as in step 20. (6) Figure 3, 8000C-2T EexPLODED VIEW C7) Figure 4. O0Q00C EXPLODED VIEW rieure 5, 12000C/15000C EXPLODED VIEW 22. 23. 24. 25. 26. 27, (10) Sandwich the tank bracket (1) flanges between the channels (14) and (15) and install three 1/2 x 1 1/2 inch bolts, nuts, and lockwashers through each tank bracket and one in each end of the channel overlap. Do aot tighten. (12,18) Install a center channel mount (11) to each side channel (10) to align with the middle tank brackets (1). Refer to Figure $ and note that both mounts face aft. Attach each with two 1/2 x 1 1/2 inch bolts, nuts, and lockwashers. Do not tighten. (12,15) Attach a keel spanner (12) to each mount with the flanges forward. Attach each with one 1/2 x 1 1/2 inch bolt, nut, and lockwasher. Do not tighten. (22,15) Install an end channel (13), across the tank brackets (1) with the flanges toward the rear. Install three 1/2 x 11/2 inch bolts, nuts, and lockwashers through each tank bracket (1) and the channels (12). Do not tighten. (ALL) Beginning at the left rear corner, route the cable (16) as shown in Figure 6. Join the ends with turnbuckle (27), two thimbles (18), and four cable clamps (19). Leave loose and do not install the cable attach brackets (20). (4) Install transom pads (21) to the rear side of the rear end channels (3 § 4), Pads should be installed with the long brace leg toward the outside of the hoist. Position pads approximately 33 to 39 inches apart, but they may have to be moved later (See step 11-32). Attach the pads with 1/2 x 3 inch bolts, nuts, lockwashers, and flat washers. 2 28. 29. 30. 31. 32. 33. (6,8,8-27,10,12.15) Install four hull support columns (22) as shown in Figure 2-5, using eight 1/2 x 1 1/2 inch bolts. nuts, and lockwashers. Make certain the flat side of each column is facing forward and the brace leg is outboard. Do not tighten. (6,8,8-2T) Install the hull support pads (25) to the tops of the columns (22) with the long end to the rear and the angles toward the center of the hoist. Attach each with two 1/2 x 51/2 inch bolts, nuts, and lockwashers. Tighten snug. (6,8,8-2T) Install a brace (24) between the rear of each pad (23) and hull support column (22). Attach to columns (22) with 1/2 x 1 1/2 inch bolt, nut, and lockwasher, and to pad with 1/2 x $ 1/2 inch bolt, nut, and lockwasher. Tighten 1/2 x $ 1/2 inch snug. (10,12,15) Install a riser (25) to each forward hull support column (22) so the tops of front and rear columns will be level. Make certain”bevel is down toward center of hoist. Attach each with two 1/2 x 1 1/2 inch bolts, nuts, and lockwashers. (10,12,15) Install the hull support pads (23) to the tops of the columns (22) with the long angle toward the center of the hoist. Attach each with two 2x 51/2 inch bolts, nuts, and lockwashers. Tighten snug. (10,12,15) Install hull support pad braces (24) between the hull support pads (23) and the columns (22). Attach to pads with two 1/2 x 51/2 inch bolts, nuts, and lock- washers, and to columns with two 1/2 x 1 1/2 inch bolts, nuts, and lockwashers. Do not tighten. ayy 34. 35. 36. 37- 38. 39. 40, 41. (10,12,15) Install the vee bracket (5) centered in the front (ALL) (ALL) (ALL) (ALL) (ALL) (ALL) (ALL) end channel (7) using six 1/2 x 1 1/2 inch bolts, nuts, and lockwashers, Tighten to approximately 75 ft 1b torque. While standing at the rear of the hoist, sight across the rear end channels to the front ones to make sure the front and rear are parallel and that there is no twist or warp in the hoist. If one corner is low, block up that tank to align the hoist. Tighten all tank band bolts to approximately 35 ft. lbs. torque. Tighten all 1/2 x 5 1/2" bolts snug. Tighten all 1/2 x 11/2" and 1/2 x 3 1/2" bolts to approximately 75 €t. lbs. torque. Refer to Figure 7 and make the necessary hose recon- nections between the tanks and the point marked (x) on the drawing. Cap the fittings at poiht (X) using crutch tips or equivelant, Attach a tether line to the hoist. Slowly back the trailer into the water to float the hoist. Do this slowly so the front of the tanks will not pivot hard into the trailer, Slowly tow the hoist to the installation location. m3 ey 4oo0c 000C-2T 60000 8000C 4 ie x Xx x 10000 12000C 15000€ FIGURE 7, HOSE CONNECTIONS chy (ALL) (at) (ALL) (ALL) (atb) (AcE) (ath) (10, SECTION IT INSTALLATION Move the boat into the slip and position it with the bow about 12 inches back from the front of the slip. Hold boat 4n this position. Locate any mark, on the dock, the location of the bottom of the boat's transom. Move the boat out of the slip and move in the hoist. Position the hoist with the rear of the transom pads (21) or the hull support pads (23) even with the mark made in step 2. Mark on the dock, the location for all four dock brackets. Note that the right side dock brackets are five inches forward of those on the left side. Remove angle (26) or strut (31) from all four dock brackets (27). Retain angle or strut and hardware for reinstallation. (Figure 8, 9) Install the four dock brackets using two grip tabs (30) and two 1/2 x 1 carriage bolts, nuts, and lockwashers as shown in figure 8. Tighten the 5/8 inch nuts on the allthread rods snug (one or more dock brackets may have to be noved slightly later). 12, 15) Reinstall the angles (26), removed in step 6, with the beveled end down. (15) 9. (10, 12, 16) (See Figure 6) Insert two 5/8 x 1 1/2 inch bolts through each cable bracket (20) with the threads toward the flat side. 10. (10, 12, 15) (See Figure 6) Using two cable clamps (28) for each cable bracket (20) attach the brackets loosely to cable (16). Do not tighten. Note that the left side brackets attach to the forward cables and the right side attach to the rear cables, 11. (10, 12, 18) Install a guide bracket (29) to each cable bracket (20), capturing the cable support (9). Attach each with two 1/2 x 1 1/2 inch bolts, nuts, and lockwashers. 12. (10, 12, 15) Loosen the cable support (9) attach bolts and slide the cable supports out equidistance until the cable brackets (20) are against the dock bracket angle (26). 19. (10, 12, 15) Tighten the cable support (9) attach bolts, making certain the cable supports are still vertical and parallel, 44. (10, 12, 15) Slide the brackets (20) down the cables (16) until they are against the stops on cable supports (9). 15. (4, 6, 8, 82T) Reinstall the strut (31) back onto dock brackets (27) with opening of strut facing to the front of the slip on the left side and to the rear of the slip on the right side. 16. (4, 6, 8, 8-2T) (See Figure 10) Using two cable clamps (28) for each cable bracket (32), place cable bracket around slide rod with flag away from the strut (31) and attach to cable, Do not tighten. Note that the left side brackets attach to ae) az. 18. 19. 20. 21. (ALL) (ALL) (ALL) (a a, the forward cables and the right side attach to the rear cables. Install spacer (34) into cable bracket with 1/2" % 21/2" bolts, lockwashers and b-line nuts (33). Do not tighten. Remove the cover from the control assembly and attach the internal portion to the floor of the deck. It should be mounted within sy reach of the bow of the boat. (See Figure 7) Complete the hose connections between the points marked X and the control assembly. Note that there are two valves provided for the 10, 12, and 15 thousand hoists. The left is for the front compartments and the right is for the rear. Connect the control unit to a 115 VAC source and momentarily actuate the switch to verify that power is available. 8, 8-27) Move the valve control handle to LAUNCH and lower year of hoist until approximately seven inches of tank re- mains out of the water. Close the valve. 8, 8-27) Attach the rear cable brackets (32) to the dock bracket by sliding the B-line nuts attached to the brackets into the struts until they reach the stops on the cable supports. Tighten the B-line nuts to 60 ft. lbs. These nuts are self-aligning in the strut. Note, brackets should be positioned the same distance from the water. (17) 22. (4, 6, &, 8-27) Re at Steps 20 & 21 at the front of the hoist. 23. (10, 12, 15) Move both valve control handles to LAUNCH and lower rear of hoist until approximately nine inches of tank remains out of the water, Close the valves. 24. (10, 12, 15) Attach the REAR cable brackets (20) to the dock bracket angle (26) using the two 6/8 inch bolts inserted in step 9, and two 5/8 inch nuts and lockwashers. Locate cable brackets approximately the same distance from the water. 25. (10, 12, 15) Repeat steps 23 & 24 at the front of the hoist. 26. (ALL) Blow the hoist up until it is snug against the stops. 27. (ALL) Using turnbuckle (17), tighten the cable until it can be deflected easily three to five inches. 28. (ALL) Tighten cable clamps \(28). 29. (ALL) Lower the hoist enough to allow the boat to pass over the pads (SEE OPERATION). 90. (ALL) Bring the boat back into the slip and position it as it was in step 1. 31. (ALL) Hold the boat in position and start raising the hoist. (SEE OPERATION) . 32. (ALL) Raise the hoist approximately 12 inches and stop the blower and close the valves. (18) a3. 34. as. 36. 37. 38. 39. 40. 41. az. 43. (ALL) (ALL) (atL) (ALL) (ALL) (ALL) (ALL) (ALL) (10, (ALL) (ALL) Measure from the water surface to a common point at all four corners to make certain the hoist is still level within one inch. If not, lower the hoist and move the boat either forward or aft. Repeat steps 31, 32, 33 until hoist is level. Continue raising the hoist until it is snug against the stops. Make certain it is against all four stops. If not, vemove boat and raise the hoist. Move all four stops an equidistance toward water. Raise boat again. Check that the pads fit the hull properly and are not on a lifting strake. They may need to be moved in or out. Lower the hoist until just before the boat floats free. Stop the hoist. Form a loop (6-8 inches) in one end of each guide rope. Pull each rope as tight as possible and tie to a post on each side of the slip, as near the bow of the boat as possible, and about five feet above the water. NOTE If no posts are available, an alternate method is to tie to the front crossmember of the hoist. Raise the boat back full up. Install the control assembly cover. 12, 18) Install the cable support shields. Tighten all dock brackets (27). Lag bolt (or equivalent) the upper dock brackets to the dock floor. (19) SECTION III OPERATION NOTE Operation of the hoist is very simple and easy, Just follow the steps below. TO LAUNCH THE BOAT lL. a. Move the valve control handle (or handles) to LAUNCH. When the hoist is completely down (no more air exhausting from the control) remove the guide ropes from the rear cleats and lay them on the dock, The boat is now free in the slip and you are ready to go boating. TO LIFT THE BOAT When you return from boating bring the boat back into the slip. Place the loops in the guide ropes over the rear cleats on the boat. Gently push back on the bow of the boat until the guide ropes are taut. This will properly locate the boat over the hoist. While pressing back on the boat, place the blower switch to ON. When the hoist contacts the boat turn loose of the boat. When the hoist is up solid against the stops, place the switch to OFF and move the valve control handle (or handles) to DRY DOCK. The boat is now in a "dry dock" condition. (20) 5. SECTION IV DO'S AND DON'TS DO. Always use the guide ropes. ‘They are required for proper positioning of the boat and if they are not used your warranty is voided. DO. Always raise the hoist if it is not to be used for an extended period of time (more than a day) whether the boat is on it or not. The hoist will survive storms and rough weather much better in the up position. DO. Leave your boat on the hoist during the winter if you desire. Stationary ice will not damage the hoist if it is up. DO, Follow the instructions in this manual and your hoist will give you many years of trouble-free service. DON'T, Operate the blower with the valve closed. Blower damage will result. DON'T. Start the blower while launching the boat. Only open the valve. DON'T. Attempt to raise any boat other than the one the hoist was adjusted for. Hoist damage could result. If you trade boats, contact your hoist dealer and he wil have your hoist readjusted. DON'T. Pushback excessively on the boat while lifting. Push back just enough to tighten both guide ropes and only until the hoist contacts the boat. (21h PARTS LIST Item Part Number Nonenclature 26 FD-491 Vertical Angle 27 MA-479 Dock Bracket Assembly - HD consists of WA-3067 Upper Bracket WA-3080 Lower Bracket D491 Vertical Angle 30 FD-a12 Grip Tab V4 ecceocceocooeceoe2e02e» Tavaposcouseoasesoe Fraure 8 DOCK BRACKET INSTALLATION (1, 2, 5) WA-3067 oo0000aY ° SP-aa3-1 FIGURE 9. DOCK BRACKET-BL. (4, 6, 8, 8-27) (23) B Live Por 4fo[e ever mpsoa7 wo ele { ma 3037 Pe § pee anres r8 ) pnsen¥o 7 Fioure 10 10 sey 12 43 14 1s 16 wy 18 19 2 22 23 24 25 26 27 28 29 30 31 32 33 PART NUNBER Wa-SOL FD-596 FD-$06-10 FD-S06-20 MA-251-5 4309700 MA-3027. WA-3041-10 _SP-9040-42 SP-9016-2 SP-9015-1 SP-9014-1 MA- 206 MA-206-1 SP-9014-1 FD-3013 SP-933-1 WA-3091 SP-931 WA-3092 PARTS LIST monet 4000C NOMENCLATURE Upper Tank Bracket - 24" Lower Tank Bracket - 24" x 2" End Channel - 7°11" End Channel - 6'8" V-Bracket Assembly w/Plate Not Used Not Used Not Used Cable Support Assembly Side Rail - 1144" Not Used Not Used Not Used Not Used Not Used &!' Stainless Steel Cable x 86" LG Turnbuckle Cable Thimble - %' Cable Clamp - 4" Transom Pad Assembly - LH Transom Pad Assembly - RH Not Used Not Used Not Used Not Used Not Used Not Used Cable Clamp + 4" Not Used see Figure 8 Strut Cable Bracket B-Line Nut Bracket Spacer (2s) see Figure 10 4 8 a 2 1 TEM PART NUMBER waraneune 10 a 12 13 14 1s 16 7 18 19 2. 22 WA-SO1 FD-596 FD- 506-10 FD- 506-20 MA-270 MA~3027 WA-3041-20 SP-9040-43 SP-9016-2 SP-9015-1 SP-9014-1 WA-301 WA-301-1 MA-256 FD-317 SP-9014-1 FD-3013 SP-933-1 WA-3091 SP-931 WA-3092 PARTS LIST ‘monet 6000C/8000C NOMENCLATURE Upper Tank Bracket - 24" Lower Tank Bracket - 24" x 2" End Channel - 7*11" End Channel - 6'8* V-Bracket Assembly Not Used Not Used Not Used Cable Support Assembly - Side Rail - 137" Not Used Not Used Not Used Not Used Not Used 4" Stainless Steel Cable x 94' LG Turnbuckle Cable Thimble - Cable Clamp - Not Used Hull Support Column - Li Hull Support Column - Ri Hull Support Pad - 14° Huli Support Brace - 27%" Not Used Not Used Not Used Cable Clamp + 4" Not Used See Figure 8 Strut Cable Bracket B-Line Nut Bracket Spacer see Figure 10 ow. 12 eevousune 10 12 13 14 1s 16 17 18 19 21 22 23 24 25 26 27 28 29 30 3 32 33 34 PART NUMBER WA-$97 FD-$93 FD-S06-10 FD-S06-20 MA-270 MA-3027 WA-3041-20 SP-9040-45 SP-9016-2 SP-9015-2 SP-9014-1 WA-301 WA-301-1 MA-256 FD-317 SP-9014-1 FD-3013 SP-933-1 WA-3091 SP-931 WA-5092 PARTS LIST mover 8000C2T NOMENCLATURE Upper Tank Bracket - 32" Lower Tank Bracket - 32" End Channel - 7'11" End Channel - 6' V-Bracket Assembly Not Used Not Used Not Used Cable Support Assembly Side Rail - 137" Not Used Not Used Not Used Not Used Not Used 4h Stainless Steel Cable x 94° LG Turnbuckle Thimble - 4" Cable Clamp - \" Not Used Hull Support Column - LH Hult Support Column - RH Hull Support Pad - 14" Hull Support Brace - 274" Not Used Not Used Not Used Cable Clamp - Not Used See Figure 8 Strut Cable Bracket B-Line Nut Bracket Spacer (27) see Figure 10 4 4 2 2 1 soe PARTS LIST mover 10000C ITEM PART NUMBER NOMENCLATURE 1 WA-S97 Upper Tank Bracket 6 2 FD-593 Lower Tank Bracket 6 3 Not Used 4 Not Used 5 MA-290 V-Bracket 1 6 —-FD-560 Keel Spanner Channel - 37%" 4 7 FD-S003-10 End Channel - 5" x 9'2" 2 8 Not Used 9 MA-3003 Cable Support Assembly - LH 2 MA- 3002 Cable Support Assembly - RH 2 10 FD-3015 Side Channel - 3" x 184" 2 11 WA-30Si Center Channel Mount 2 12 Not Used 1s Not Used 14 FD-$06-10 Center Channel - 7'11" 1 15 FD-S06-20 Center Channel - 6'8" 1 16 “SP-9040:20 3/8" Stainless Steel Cable x 125' LG 1 17 SP-9016-1 Turnbuckle 1 18 SP-9015-2 Thimble - 3/8" 2 19 SP-9014-2 Cable Clamp - 3/8" 4 20 WA-3014 Cable Bracket 4 21 Not Used 22 WA-301 Hull Support Column - LH 2 WA-302-1 Hull Support Column - RH 2 23 MA-252 Hull Pad - 9! 2 24 FD-317 Hull Support Brace 2 25 = FD-323 Hull Support Riser - LH 1 FD-323-1 Hull Support Riser - RH 1 26 See Figure 8 a7 See Figure 8 28 SP-9014-2 Cable Clamp - 3/8" 8 29° FD-3015 Guide Bracket rf 30 See Figure 8 | _| 40-302 Bock BRET aris | UPPER 13518 OD LOWER 935/803 a a | a flat of 3” channel Tab Faocs ths dutom End !f SINGLE UNIVERSAL POST (8, 10, 12, and 15 *C’~MODELS) Sy MA~31 25, KA-9156 KIT BAG WA-3123 FD-3119 oa CIN PARTS BAG) ~~ ies WA-3123-11 KIT K123 SINGLE UNIVERSAL POST RH ASSEMBLY SHOWN

You might also like