Design Standard
Basic Plumbing System Design
Revisions Log:
Purpose:
This design standard has the purpose of creating a consistent application of plumbing
system design throughout the East Side Union High School District. The intent is to
achieve a standard of quality for maintenance, water efficiency, energy efficiency and
reliability throughout all renovation and new building projects.
Design Standard:
Codes – Systems will be designed in accordance with the latest edition of the following
codes:
• International Building Code; California Building Code.
• International Mechanical Code; California Mechanical Code.
• International Plumbing Code; California Plumbing Code.
• International Fire Code; California Fire Code.
• National Electrical Code; California Electrical Code.
• State of California Code of Regulations (CCR).
• Energy Efficiency Standards and Title 24 Regulations.
Standards – The following reference standards shall be used for the design:
• ANSI – American National Standards Institute.
• ASME – American Society of Mechanical Engineers.
Page 1 of 10
Division 22 00 00
Basic Plumbing System Design
Version 2b.2015.0525
Water Piping:
• Electrical Equipment Clearances: Do not route piping through electrical rooms,
transformer vaults, elevator equipment rooms, and other electrical or electronic
equipment spaces and enclosures. Within mechanical or plumbing equipment
rooms, provide minimum 3 feet lateral clearance from sides of electric switchgear
panels, MCC’s, etc. Do not route piping above any electric power or lighting
panel, switchgear, or similar electric device. Coordinate exact pipe routing with
electrical design to provide proper clearance with such items.
• Welding Qualification: Qualify welding procedures, welders and operators in
accordance with ANSI B31.9 for shop and project site welding of piping work.
• All piping shall meet the piping material requirements set forth:
o Equipment: Provide pipe, tube and fittings of the type, fitting requirements,
grade, class, size and weight indicated or required for each service, as
indicated in other Division 22 Specifications, codes and standards,
whichever is most stringent.
o Piping: Piping shall conform to ASTM or ANSI Standards and be approved
by the governing Code for the application intended.
o Excavation: Perform necessary excavation and backfill required for the
installation of the plumbing work.
Page 2 of 10
Division 22 00 00
Basic Plumbing System Design
Version 2b.2015.0525
Page 3 of 10
Division 22 00 00
Basic Plumbing System Design
Version 2b.2015.0525
Storm Piping
• Rainwater Leaders and Storm Drains: Compute rainwater quantity on the basis of
1.5" rainfall per hour minimum (.935 gallons per hour/square foot horizontal
drainage area). Size all piping per CPC.
Page 4 of 10
Division 22 00 00
Basic Plumbing System Design
Version 2b.2015.0525
• Grade interior piping, above grade, at 1/4" per foot minimum as required by
California Plumbing Code (CPC).
• Insulate underbodies and horizontal mains.
Page 5 of 10
Division 22 00 00
Basic Plumbing System Design
Version 2b.2015.0525
the design professional shall specify a double bowl sink with one bowl meeting
ADA requirements, and then install the disposal at the other bowl. The switch shall
be placed on a reachable wall or on the front of the casework. Provide garbage
disposals in home-like educational settings such as a Life Skills lab.
Page 6 of 10
Division 22 00 00
Basic Plumbing System Design
Version 2b.2015.0525
• Provide a hose bib for wash down at exterior courtyards, quads and plazas.
• Hose bibs may be supplied from a reclaimed or industrial water system, or have
separate reduced pressure device or vacuum breaker and backflow preventer on
each hose bib. However, hose bibs located near exterior eating areas will be used
to wash down tables, and should dispense potable water.
Disinfection of Water Systems
• Clean and disinfect the domestic hot and cold water systems, including fire systems
connected to the domestic water systems, in accordance with the generally accepted
standards and Codes.
Plumbing Isolation Valves
• Show all valves on drawings.
• Arrange and valve all utility services so that, as a minimum, each floor may be
isolated.
• Arrange and valve domestic hot and cold water piping so that toilet rooms can be
isolated without interrupting service to other parts of the building.
• Show sectionalizing valves in top center and bottom of risers in hot water supply
and return systems.
• Place valves on each side of backflow or check valve to permit servicing.
• Show valves on all services left for future connections (tees, stubs, etc.) unless they
are in a valved zone, or isolated by other valves, that permits only a minor loss of
pipe contents when opened.
Pipe Installation
• Specify a proper corrosion preventive wrapping for any black steel piping installed
below grade (bituminous and paper wrapping or extruded plastic).
• Provide water hammer arrestors in water lines to equipment or fixtures having
quick closing or flush valves and any equipment that might produce water hammer.
Water hammer arrestors shall be certified by the Plumbing and Drainage Institute
(PDI). Show location and size of all water hammer arrestors on plans and access for
maintenance or replacement. Provide access panels if required.
• Show clean-outs in sewer lines as required by code. In addition, vertical to
horizontal changes in main risers that occur above furred ceilings shall have a
clean-out extended from the base to a floor clean-out or a wall clean-out above the
change in direction.
• Do not embed piping in concrete.
Page 7 of 10
Division 22 00 00
Basic Plumbing System Design
Version 2b.2015.0525
Page 8 of 10
Division 22 00 00
Basic Plumbing System Design
Version 2b.2015.0525
design and certifications with the Facilities Director during the project’s
programming phase, in order to make a recommendation and seek the Director’s
approval for pursuit of certifications and incentive grants.
Documentation
• Construction Layout Drawings: Direct the contractor to prepare and submit layout
drawings to coordinate installation and location of plumbing equipment.
Page 9 of 10
Division 22 00 00
Basic Plumbing System Design
Version 2b.2015.0525
Approved Manufacturers:
o Elster Perfection Clearflow© Dielectric Waterway Fittings
Substitutes Allowed:
Yes, if performance and quality equivalency can be evidenced.
End of Document