Clases de Java
Clases de Java
Disciplinas Tareas
Environment
● Launch Development Process ● Tailor the Development
● Support Development Process for the Project
Implementation
● Analyze Runtime Behavior ● Integrate System
● Execute Developer Tests ● Plan Subsystem Integration
● Implement Design Elements ● Plan System Integration
● Implement Developer Test ● Review Code
● Integrate Subsystem ● Structure the Implementation
Model
Project Management
● Acquire Staff ● Iteration Evaluation Criteria
● Assess Iteration Review
● Conduct Review ● Iteration Plan Review
● Define Project Organization and Staffing ● Organize Review
● Develop Business Case ● Plan Phases and Iterations
● Develop Iteration Plan ● Project Approval Review
● Identify and Assess Risks ● Project Planning Review
● Initiate Iteration ● Report Status
● Initiate Project ● Schedule and Assign Work
Requirements
● Capture a Common Vocabulary ● Elicit Stakeholder Requests
● Detail a Use Case ● Find Actors and Use Cases
● Detail the Software Requirements ● Prioritize Use Cases
● Develop Supplementary Specifications ● Review Requirements
● Develop Vision ● Structure the Use-Case Model
Test
● Assess and Advocate Quality ● Identify Test Ideas
● Define Test Approach ● Implement Test Suite
● Determine Test Results ● Structure the Test
● Execute Test Suite Implementation
Fases Actividades Tareas
Prepare Project Prepare Environment for Project Créate Project Configuration Management
Environments (CM) Environments
Prepare
Environment for ● Launch Development Process
an Iteration
Monitor and
Control Project ● Schedule and Assign Work ● Organize Review
● Report Status ● Conduct Review
Manage the
Scope of the ● Develop Visión
System ● Prioritize Use Cases
Define the
System ● Develop Vision ● Develop Supplementary
● Capture a Common Vocabulary ● Specifications
● Find Actors and Use Cases
Perform
Architectural ● Architectural Analysis
Synthesis ● Construct Architectural
Proof-of-Concept
● Assess Viability of Architectural
Proof-of-Concept
Define
Evaluation ● Identify Test Ideas
Mission ● Define Test Approach
Manage
Iteration ● AcquireStaff ● Identify and Assess Risks
● Initiate Iteration ● Assess Iteration
● Iteration Evaluation Criteria
Review
Plan for Next
Iteration ● Develop Iteration Plan
● Develop Business Case
● Iteration Plan Review
Elaboration Prepare
Environment for ● Launch Development Process
an Iteration
Revise and Plan the Project Plan Project Configuration & Change
Complete Control
Project Plans ● Define Project Organization and
Staffing Plan the Integration
● Plan Phases and Iterations
● Project Planning Review ● Plan System Integration
Refine the
System ● Detail a Use Case
Definition ● Develop Supplementary
Specifications
● Detail the Software Requirements
Define a
Candidate ● Architectural Analysis
Architecture ● Use-Case Analysis
Refine the
Architecture ● Identify Design Mechanisms ● Structure the Implementation
● Identify Design Elements Model
● Incorporate Existing Design ● Describe the Run-time
Elements Architecture
● Describe Distribution
● Review the Architecture
Develop Analyze Behavior Design the Database
Components
● Identify Design Elements ● ClassDesign
● Use-Case Analysis ● Database Design
● Design the User Interface ● Review the Design
● Prototype the User-lnterface ● Plan Subsystem Integration
● Review the Design ● Implement Design Elements
● Analyze Runtime Behavior
● Implement Developer Test
Design Components ● Execute Developer Tests
● Review Code
● Use-Case Design
● Subsystem Design
● CIass Design
● Review the Design
Integrate and Verify Test Approach Test and Evaluate [within Scope]
Test
● Implement Test Suite ● Test and Evaluate
● Implement Test Suite
Integrate and Validate Build ● Execute Test Suite
● Structure the Test Implementation
● Integrate each Subsystem ● Identify Test Ideas
● Implement Developer Test ● Determine Test Results
● Execute Developer Tests ● Achieve Acceptable Mission
● Integrate Subsystem ● Assess and Advocate Quality
● Integrate the System ● Determine Test Results
● Integrate System ● Improve Test Assets
● Validate Build Stability ● Define Test Approach
● Execute Test Suite ● Structure the Test Implementation
● Determine Test Results ● Identify Test Ideas
● Assess and Advocate Quality ● Implement Test Suite
Construction Prepare
Environment for ● Launch Development Process
an Iteration
Ongoing Manage Iteration Manage Change Requests
Management
and Support ● AcquireStaff ● Submit Change Request
● Initiate Iteration ● Review Change Requests
● Iteration Evaluation Criteria ● Confirm Duplicate or Rejected CR
Review ● Schedule and Assign Work
● Identify and Assess Risks
● Assess Iteration
Support Environment During an Iteration
Monitor & Control Project
● Support Development
● Schedule and Assign Work
● Report Status
● Organize Review Change and Deliver Configuration ítems
● Conduct Review Manage Baselines & Releases
Monitor & Report Configuration Status
Manage Changing Requirements
Integrate and Verify Test Approach Test and Evaluate [within Scope]
Test
● Implement Test Suite ● Test and Evaluate
● Implement Test Suite
Integrate and Validate Build ● Execute Test Suite
● Structure the Test Implementation
● Integrate each Subsystem ● Identify Test Ideas
● Implement Developer Test ● Determine Test Results
● Execute Developer Tests ● Achieve Acceptable Mission
● Integrate Subsystem ● Assess and Advocate Quality
● Integrate the System ● Determine Test Results
● Integrate System ● Improve Test Assets
● Validate Build Stability ● Define Test Approach
● Execute Test Suite ● Structure the Test Implementation
● Determine Test Results ● Identify Test Ideas
● Assess and Advocate Quality ● Implement Test Suite
Transition Prepare
Environment for ● Launch Development Process
an Iteration
Fix Defects in
Components ● Plan Subsystem Integration ● Implement Developer Test
● Implement Design Elements ● Execute Developer Tests
● Analyze Runtime Behavior ● Review Code
CIose-Out
Project
Analysts Requirements
Specifier ● Detail a Use Case ● Actor
● Detail the Software Requirements ● Software Requirement
● Software Requirements
Specification
● Use Case
Stakeholder
System
Analyst ● Capture a Common Vocabulary ● Glossary
● Develop Supplementary Specifications ● Stakeholder Requests
● Develop Vision ● Storyboard
● Elicit Stakeholder Requests ● Supplementary
● Find Actors and Use Cases Specifications
● Structure the Use-Case Model ● Use-Case Model
● Vision
Developers Database
Designer ● Database Design ● Data Model
Designer
● Class Design ● Analysis Class
● Subsystem Design ● Design Class
● Use-Case Analysis ● Design Package
● Use-Case Design ● Design Subsystem
● Use-Case Realization
Implementer
● Analyze Runtime Behavior ● Developer Test
● Execute Developer Tests ● Implementation Element
● Implement Design Elements ● Implementation
● Implement Developer Test Subsystem
Integrator
● Integrate Subsystem ● Build
● Integrate System ● Integration Build Plan
● Plan Subsystem Integration
● Plan System Integration
Software
Architect ● Architectural Analysis ● Analysis Model
● Assess Viability of Architectural ● Architectural
Proof-of-Concept Proof-of-Concept
● Construct Architectural ● Deployment Model
Proof-of-Concept ● Design Model
● Describe Distribution ● Implementation Model
● Describe the Run-time Architecture ● Reference Architecture
● Identify Design Elements ● Software Architecture
● Identify Design Mechanisms Document
● Incorporate Existing Design Elements
● Prioritize Use Cases
● Structure the Implementation Model
User-lnterface
Designer ● Design the User Interface ● Navigation Map
● Prototype the User-lnterface ● User-Interface Prototype
Review
Coordinator ● Organize Review ● Review Record
Reviewer
● Conduct Review
Stakeholder
Technical
Reviewer ● Review Code
● Review Requirements
● Review the Architecture
● Review the Design
Configuration
Manager ● Set Up Configuration Management ● Project Repository
(CM) Environment
Management
Reviewer ● Iteration Evaluation Criteria Review
● Iteration Plan Review
● Project Approval Review
● Project Planning Review
Project Manager
● Acquire Staff ● Business Case
● Assess Iteration ● Iteration Assessment
● Define Project Organization and Staffing ● Iteration Plan
● Develop Iteration Plan ● Risk List
● Identify and Assess Risks ● Software Development
● Initiate Iteration Plan
● Initiate Project ● Status Assessment
● Schedule and Assign Work ● Work Order
System
Administrator ● Support Development ● Development
Infrastructure
Test Manager
● Assess and Advocate Quality ● Test Evaluation Summary
System
Administrator ● Support Development ● Development
Infrastructure
Test Designer
● Define Test Approach ● Test Strategy
● Structure the Test Implementation ● Test Suite
Test Manager
● Assess and Advocate Quality ● Test Evaluation Summary
Tester
● Execute Test Suite ● Test Log
● Implement Test Suite
AUP (Proceso Unificado Ágil)
Develop Database
● Evolve Database
Schemas
● Manage Access
Rights
Test Initial test Manage Verification and Project plan
planning Validation Efforts Requirements ● Project
Review initial Model Manager
project ● Define Test Design Model ● Tester
management Requirements Test Strategy ● Stakeholder
work products ● Plan Testing Installation Scripts ● Reviewer
Review initial Efforts Regression Test
models ● Define Suite
Assessment And Defect Report
Traceability Source Code
Needs System
● Assess and Requirements
Advocate Quality Model
Artifact(s)
Verify Guidance
Review Record
● Implement Test
● Implement Test
Suite
● Execute System
Tests
● Analyze Test
Results
● Manage
Dependencies
Validate
● Acceptance Test
the System
● Pilot Test the
System
● Review
Deployment Identify the Plan Project Plan
potential Release Notes ● Project
release ● Plan Deployment Installation Scripts Manager
window ● Write Release Requirements ● Deployer
Begin Notes Model ● Developer
high-level Design Model ● Technical
deployment Distribute System Writer
planning Support ● Stakeholder
Documentation
● Develop
User
Installation
Documentation
Scripts
Training Material
● Package System
Operations
● Deploy to
Documentation
Pre-Production
Environment
● Deploy to
Production
Document
● Write Support
Documentation
● Write User
Documentation
● Write Operations
Documentation
● Write Training
Material
● Create
Workspace
● Check Out
Artifact
● Check In Artifact
● Resolve Check-in
Conflicts
● Create Baseline
Project Start building Manage People
Management the team ● Anyone
Build ● Manage Team Human Resources ● Project
relationships ● Protect Team Guidance Manager
with your ● Hold Daily Individual Estimate ● Stakeholder
project Stand-up Meeting Hardware /
stakeholders ● Estimate Software
Determine Individual’s Work Funding
project Facilities
feasibility Manage Technical Aspects Requirements
Develop a Model
high-level Design Model
● Identify and
schedule for Iteration Plan
Assess Risks
the entire Project Schedule
● Schedule
project Risk list
Iteration
Estimate
● Measure Velocity
Budjet
● Obtain
Resources
● Develop Project
Develop a
Budget
detailed
● Report Project
iteration plan
Status
for the
upcoming
Manage Project Lifecycle
iteration
Manage risk
Obtain ● Initiate Project
stakeholder ● Determine
support and Project Feasibility
funding ● Close Out Phase
Close out the ● Close Out Project
phase ● Schedule Project
Support Tools
● Select and
Acquire Tools
● Setup Tools
● Support
Identify the
Development
project
Teams
category
Elaboration Model Initial, Understand the Project Enterprise Mission
high-level Statement ● Agile Modeler
requirements ● Identify Goals Enterprise Vision ● Stakeholder
modeling and Vision Project overview ● Project
Initial, ● Asses Target Change Request Manager
high-level Organization Enterprise Business ● Developer
architectural Model
modeling Explore the Problem Enterprise
Domain Architecture Model
Reference
Architecture
● Model Business
Modeling Guidance
Processes
Usability Guidance
● Model Business
Enterprise
Rules
Development
● Capture a
Guidance
Common
Proof-of-Concept
Vocabulary
Prototype
● Manage
Use Case Model
Dependencies
Acceptance Tests
● Identify
Automation
Automation
Opportunities
Opportunities
User Interface
● Model the
Model
Organization
Organization Model
● Model the
Business Rule
Business Domain
Specification
● Define
Business Process
Acceptance Test
Model
● Model Usage
Domain Model
● Model Technical
Project Glossary
Requirements
Technical
● Explore Usability
Requirements
Object Model
Model the Solution
Physical Data
Model
● Define Candidate User Interface
Architecture Model
● Construct Security Threat
Proof-of-Concept Model
Prototype Deployment Model
● Identify Reuse System Overview
Opportunities Document
● Analyze
Requirements
● Design the User
Interface
● Design Database
● Manage
Dependencies
● Design Security
Aspects
● Model Hardware
and Middleware
● Analyze Legacy
Assets
● Design Business
Functionality
● Write System
Overview
Documentation
● Prioritize
Requirements
Develop Database
● Evolve Database
Schemas
● Manage Access
Rights
Test Initial test Manage Verification and Project plan
planning Validation Efforts Requirements ● Project
Review initial Model Manager
project ● Define Test Design Model ● Tester
management Requirements Test Strategy ● Stakeholder
work products ● Plan Testing Installation Scripts ● Reviewer
Review initial Efforts Regression Test
models ● Define Suite
Assessment And Defect Report
Traceability Source Code
Needs System
● Assess and Requirements
Advocate Quality Model
Artifact(s)
Verify Guidance
Review Record
● Implement Test
● Implement Test
Suite
● Execute System
Tests
● Analyze Test
Results
● Manage
Dependencies
Validate
● Acceptance Test
the System
● Pilot Test the
System
● Review
Deployment Identify the Plan Project Plan
potential Release Notes ● Project
release ● Plan Deployment Installation Scripts Manager
window ● Write Release Requirements ● Deployer
Begin Notes Model ● Developer
high-level Design Model ● Technical
deployment Distribute System Writer
planning Support ● Stakeholder
Documentation
● Develop
User
Installation
Documentation
Scripts
Training Material
● Package System
Operations
● Deploy to
Documentation
Pre-Production
Environment
● Deploy to
Productton
Document
● Write Support
Documentation
● Write User
Documentation
● Write Operations
Documentation
● Write Training
Material
● Create
Workspace
● Check Out
Artifact
● Check In Artifact
● Resolve Check-in
Conflicts
● Create Baseline
Project Start building Manage People
Management the team ● Anyone
Build ● Manage Team Human Resources ● Project
relationships ● Protect Team Guidance Manager
with your ● Hold Daily Individual Estimate ● Stakeholder
project Stand-up Meeting Hardware /
stakeholders ● Estimate Software
Determine Individual’s Work Funding
project Facilities
feasibility Manage Technical Aspects Requirements
Develop a Model
high-level Design Model
● Identify and
schedule for Iteration Plan
Assess Risks
the entire Project Schedule
● Schedule
project Risk list
Iteration
Estimate
● Measure Velocity
Budjet
● Obtain
Resources
● Develop Project
Budget
● Report Project
Develop a
Status
detailed
iteration plan
Manage Project Lifecycle
for the
upcoming
iteration ● Initiate Project
Manage risk ● Determine
Obtain Project Feasibility
stakeholder ● Close Out Phase
support and ● Close Out Project
funding ● Schedule Project
Close out the
phase
Support Tools
● Select and
Acquire Tools
● Setup Tools
● Support
Identify the
Development
project
Teams
category
Construction Model Initial, Understand the Project Enterprise Mission
high-level Statement ● Agile Modeler
requirements ● Identify Goals Enterprise Vision ● Stakeholder
modeling and Vision Project overview ● Project
Initial, ● Asses Target Change Request Manager
high-level Organization Enterprise Business ● Developer
architectural Model
modeling Explore the Problem Enterprise
Domain Architecture Model
Reference
Architecture
● Model Business
Modeling Guidance
Processes
Usability Guidance
● Model Business
Enterprise
Rules
Development
● Capture a
Guidance
Common
Proof-of-Concept
Vocabulary
Prototype
● Manage
Use Case Model
Dependencies
Acceptance Tests
● Identify
Automation
Automation
Opportunities
Opportunities
User Interface
● Model the
Model
Organization
Organization Model
● Model the
Business Rule
Business Domain
Specification
● Define
Business Process
Acceptance Test
Model
● Model Usage
Domain Model
Project Glossary
Model the Solution
Technical
Requirements
● Define Candidate Object Model
Architecture Physical Data
● Construct Model
Proof-of-Concept User Interface
Prototype Model
● Identify Reuse Security Threat
Opportunities Model
● Analyze Deployment Model
Requirements System Overview
● Design the User Document
Interface
● Design Database
● Manage
Dependencies
● Design Security
Aspects
● Design Business
Functionality
● Write System
Overview
Documentation
● Prioritize
Requirements
Implementation Technical Develop Requirements
prototyping Model ● Stakeholder
User interface ● Write Unit Tests Design Model ● Developer
prototyping ● Write Production Usability Guidance ● Agile Modeter
Code Enterprise ● Agile DBA
● Run Tests Development
● Profile System Guidance
Performance Proof-of-Concept
● Manage prototype
Dependencies Defect Report
Installation Scripts
Build Regression Test
Suite
Source Code
● Build the System
System
● Promote to
Data Schemas
Project
Design Model
Integration
Environment
Develop Database
● Evolve Database
Schemas
● Manage Access
Rights
Validate
● Acceptance Test
the System
● Pilot Test the
System
● Review
Document
● Write Support
Documentation
● Write User
Documentation
● Write Operations
Documentation
● Write Training
Material
● Create
Workspace
● Check Out
Artifact
● Check In Artifact
● Resolve Check-in
Conflicts
● Create Baseline
Project Start building Manage People
Management the team ● Anyone
Build ● Manage Team Human Resources ● Project
relationships ● Protect Team Guidance Individual Manager
with your ● Hold Daily Estimate ● Stakeholder
project Stand-up Meeting Hardware /
stakeholders ● Estimate Software
Determine Individual’s Work Funding
project Facilities
feasibility Requirements
Develop a Manage Technical Aspects Model
high-level Design Model
schedule for Iteration Plan
● Identify and
the entire Project Schedule
Assess Risks
project Risk list
● Schedule
Estimate
Iteration
Budjet
● Measure Velocity
● Obtain
Resources
● Develop Project
Budget
● Report Project
Status
Develop a
detailed
Manage Project Lifecycle
iteration plan
for the
upcoming ● Initiate Project
iteration ● Determine
Manage risk Project Feasibility
Obtain ● Close Out Phase
stakeholder ● Close Out Project
support and ● Schedule Project
funding
Close out the
phase
Support Tools
● Select and
Acquire Tools
● Setup Tools
● Support
Identify the
Development
project
Teams
category
Transition Model Initial, Understand the Project Enterprise Mission
high-level Statement ● Agile Modeler
requirements ● Identify Goals Enterprise Vision ● Stakeholder
modeling and Vision Project overview ● Project
Initial, ● Asses Target Change Request Manager
high-level Organization Enterprise Business ● Developer
architectural Model
modeling Explore the Problem Enterprise
Domain Architecture Model
Reference
Architecture
● Model Business
Modeling Guidance
Processes
Usability Guidance
● Model Business
Enterprise
Rules
Development
● Capture a
Guidance
Common
Proof-of-Concept
Vocabulary
Prototype
● Manage
Use Case Model
Dependencies
Acceptance Tests
● Identify
Automation
Automation
Opportunities
Opportunities
User Interface
● Model the
Model
Organization
Organization Model
● Model the
Business Rule
Business Domain
Specification
● Define
Business Process
Acceptance Test
Model
● Model Usage
Domain Model
● Model Technical
Project Glossary
Requirements
Technical
● Explore Usability
Requirements
Object Model
Physical Data
Model the Solution
Model
User Interface
● Define Candidate Model
Architecture Security Threat
● Construct Model
Proof-of-Concept Deployment Model
Prototype System Overview
● Identify Reuse Document
Opportunities
● Analyze
Requirements
● Design the User
Interface
● Design Database
● Manage
Dependencies
● Design Security
Aspects
● Prioritize
Requirements
Implementation Technical Develop Requirements
prototyping Model ● Stakeholder
User interface ● Write Unit Tests Design Model ● Developer
prototyping ● Write Production Usability Guidance ● Agile Modeter
Code Enterprise ● Agile DBA
● Run Tests Development
● Profile System Guidance
Performance Proof-of-Concept
● Manage prototype
Dependencies Defect Report
Installation Scripts
Build Regression Test
Suite
Source Code
● Build the System
System
● Promote to
Data Schemas
Project
Design Model
Integration
Environment
Develop Database
● Evolve Database
Schemas
● Manage Access
Rights
Validate
● Acceptance Test
the System
● Pilot Test the
System
● Review
Document
● Write Support
Documentation
● Write User
Documentation
● Write Operations
Documentation
● Write Training
Material
● Create
Workspace
● Check Out
Artifact
● Check In Artifact
● Resolve Check-in
Conflicts
● Create Baseline
Project Start building Manage People
Management the team ● Anyone
Build ● Manage Team Human Resources ● Project
relationships ● Protect Team Guidance Manager
with your ● Hold Daily Individual Estimate ● Stakeholder
project Stand-up Meeting Hardware /
stakeholders ● Estimate Software
Determine Individual’s Work Funding
project Facilities
feasibility Manage Technical Aspects Requirements
Develop a Model
high-level Design Model
● Identify and
schedule for Iteration Plan
Assess Risks
the entire Project Schedule
● Schedule
project Risk list
Iteration
Estimate
● Measure Velocity
Budjet
● Obtain
Resources
● Develop Project
Budget
● Report Project
Status
Develop a
Manage Project Lifecycle
detailed
iteration plan
for the ● Initiate Project
upcoming ● Determine
iteration Project Feasibility
Manage risk ● Close Out Phase
Obtain ● Close Out Project
stakeholder ● Schedule Project
support and
funding
Close out the
phase
Support Tools
● Select and
Acquire Tools
● Setup Tools
● Support
Identify the
Development
project
Teams
category
OpenUP
Disciplinas Tareas
Architecture
● Refine the Architecture ● Envision the Architecture
Deployment
● Develop Product Documentation ● Execute Deployment Plan
● Develop User Documentation ● Package the Release
● Develop Support Documentation ● Verify Successful Deployment
● Deliver end user Training ● Develop Backout Plan
● Deliver Support Training ● Develop Release
● Develop Training Materials Communications
● Deliver Release Communications ● Install and Validate
● Execute Backout Plan (if necessary) Infrastructure
● Plan Deployment
● Review and Conform to
Release Controls
Development
● Implement Developer Tests ● Integrate and Create Build
● Implement Solution ● Design the Solution
● Run Developer Tests
Environment
● Deploy the Process ● Set Up Tools
● Tailor the Process ● Verify Tool Configuration and
Installation
Project Management
● Assess Results ● Plan Project
● Manage Iteration ● Request Change
● Plan Iteration
Requirements
● Identify and Outline Requirements ● Detail System-Wide
● Detail Use-Case Scenarios Requirements
● Develop Technical Vision
Test
● Create Test Cases ● Run Tests
● Implement Tests
Identify and
Refine ● Identify and Outline Requirements
Requirements ● Derail Use-Case Scenarios
● Detail System-Wide Requirements
● Create Test Approach
Agree on
Technical ● Envision the Architecture
Approach
Identify and
Refine ● Identify and Outline Requirements
Requirements ● Derail Use-Case Scenarios
● Detail System-Wide Requirements
● Create Test Approach
Develop the
Architecture ● Develop Solution Increment ● Refine the Architecture
● Design the Solution
● Implement Solution
● Run Developer Test
● Integrate and Create Build
Develop Solution
Increment ● Design the Solution
● Implement Developer Test
● Implement Solution
● Run Developer Test
● Integrate and Create Build
Test Solution
● Implement Tests
● Run Tests
Ongoing Tasks
● Request Change
Identify and
Refine ● Identify and Outline Requirements
Requirements ● Derail Use-Case Scenarios
● Detail System-Wide Requirements
● Create Test Cases
Develop Solution
Increment ● Design the Solution
● Implement Developer Test
● Implement Solution
● Run Developer Tests
● Integrate and Create Build
Test Solution
● Implement Tests
● Run Tests
Ongoing Tasks
● Request Change
Develop Product
Documentation ● Develop Product Documentation
and Training ● Develop User Documentation
● Develop Support Documentation
● Develop Training Materials
Develop Solution
Increment ● Design the Solution
● Implement Developer Test
● Implement Solution
● Run Developer Tests
● Integrate and Create Build
Test Solution
● Implement Tests
● Run Tests
Finalize Product
Documentation ● Develop Product Documentation
and Training ● Develop User Documentation
● Develop Support Documentation
● Develop Training Materials
Prepare for
Release ● Review and Conform to Release
Controls
● Install aún Validate Infrastrutture
● Develop Backout Plan
● Develop Release Communications
Provide Product
Training ● Deliver and user Training
● Deliver Support Training
Ongoing Task
● Request Change
Deploy Release
to Production ● Package the Release
Analyst
● Assess Results ● Glossary
● Create Test Cases ● System-Wide Requirements
● Design the Solution ● Use case
● Envision the Architecture ● Use-Case Model
● Implement Tests ● Vision
● Manage Iteration ● Work Items List
● Plan Iteration
● Plan Project
Architect
● Envision the Architecture ● Architecture Notebook
● Refine the Architecture
● Assess Results
● Design the Solution
● Detail Use-Case Scenarios
● Develop Technical Vision
● Identify and Outline Requirements
● Manage Interaction
● Plan Iteration
● Plan Project
Course
Developer ● Develop Training Materials ● Training Materials
Deployment
Engineer ● Deliver Release Communications ● Backout Plan
● Develop Release Communications ● Deployment Plan
● Execute Backout Plan (if necessary) ● Release
● Execute Deployment Plan ● Release Communications
● Install and Validate Infrastructure ● Infrastructure
● Outline Deployment Plan
● Verify Successful Deployment
● Develop Backout Plan
● Package the Release
Developer
● Design the Solution ● Build
● Develop Backout Plan ● Design
● Implement Developer Tests ● Developer Test
● Implement Solution ● Implementation
● Install and Validate Infrastructure ● Backout Plan
● Integrare and Create Build ● Infrastructure
● Package the Release ● Release
● Review and Conform to Release Controls ● Test Log
● Run Developer Tests
● Assess Results
● Create Test Cases
● Deliver Release Communications
● Detail System-Wide Requirements
● Detail Use-Case Scenarios
● Develop Product Documentation
● Envision the Architecture
● Execute Backout Plan (if necessary)
● Execute Deployment Plan
● Identify and Outline Requirements
● Implement Tests
● Manage Iteration
● Outline Deployment Plan
● Plan Iteration
● Verify Successful Deployment
Process
Engineer ● Deploy the Process ● Project Defined Process
● Tailor the Process
Product
Owner ● Develop Product Documentation
Project
Manager ● Assess Results ● Iteration Plan
● Manage Iteration ● Project Plan
● Plan Iteration ● Risk List
● Plan Project ● Work Items List
● Develop Technical Vision
● Envision the Architecture
● Refine the Architecture
Stakeholder
● Assess Results
● Create Test Cases
● Design the Solution
● Detail System-Wide Requirements
● Detail Use-Case Scenarios
● Develop Technical Vision
● Envision the Architecture
● Identify and Outline Requirements
● Implement Solution
● Implement Tests
● Manage Iteration
● Plan Iteration
● Plan Project
Technical
Writer ● Develop Product Documentation ● Product Documentation
● Develop Support Documentation ● Support Documentation
● Develop User Documentation ● User Documentation
Tester
● Create Test Cases ● Test Case
● Implement Tests ● Test Log
● Run Tests ● Test Script
● Assess Results
● Design the Solution
● Detail System-Wide Requirements
● Detail Use-Case Scenarios
● Identify and Outline Requirements
● Implement Developer Tests
● Implement Solution
● Manage Iteration
● Plan Iteration
● Plan Project
Tool Specialist
● Set Up Tools ● Tools
● Verify Tool Configuration and Installation
Trainer
● Deliver end user Training
● Deliver Support Training
EnterpriseUP
Operation &
● Inception
Support ● Usage Reports
Strategic
● Asset Project ● Retirement
Reuse
● Robust
● Contract
People ● Benefits Package
Management ● Staffing Forecast
● Position Definitions
● Training Materials
Software Process
Improvement
Roles Actividades Tareas