Lab 13: Busbar Transfer With Interruption of The Power Supply To The Consumer

This document provides the procedure for a lab experiment on transferring a load between two busbars while interrupting the power supply. The equipment used includes an overhead line model, resistive load, transformer, power supply, circuit breakers, ammeters, and voltmeters. The procedure involves assembling the circuit, setting voltages and loads, initially powering the system from busbar 1, then transferring the load to be powered from busbar 2 using a specific switching sequence that briefly interrupts the load's power supply in the process. Voltages and currents are measured at each step to verify the load is receiving power from the intended busbar.

Uploaded by

Ali Imtiaz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
82 views1 page

Lab 13: Busbar Transfer With Interruption of The Power Supply To The Consumer

This document provides the procedure for a lab experiment on transferring a load between two busbars while interrupting the power supply. The equipment used includes an overhead line model, resistive load, transformer, power supply, circuit breakers, ammeters, and voltmeters. The procedure involves assembling the circuit, setting voltages and loads, initially powering the system from busbar 1, then transferring the load to be powered from busbar 2 using a specific switching sequence that briefly interrupts the load's power supply in the process. Voltages and currents are measured at each step to verify the load is receiving power from the intended busbar.

Uploaded by

Ali Imtiaz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

EE-02316 POWER DISTRIBUTION AND UTILIZATION STUDENT LAB WORK BOOK THE UNIVERSITY OF

LAHORE

Lab 13: Busbar transfer with interruption of the power supply to


the consumer.

Equipment Used:

 1 IS-6002 Overhead Line Model  1 IS-6004 Resistive Load  1 IS-6003 Three-Phase Transformer  1
IS-6017 Three-Phase Power Supply  4 IS-6019 Power Circuit Breaker  3 IS-6035 Moving-Coil
Ammeter (2.5 A)  2 IS-6037 Moving-Iron Voltmeter (600 V)
Procedure:

 Assemble the circuit in accordance with the foregoing topographic diagram.


 Special care must be taken to ensure that the individual phases are connected correctly in order to
avoid later shortcircuits.
 In order to fully utilize the possibilities of the double busbar system, the busbars should be
supplied from two different voltages: the voltage at the beginning of the overhead line model
(busbar 1) and the voltage at the end of the line model (busbar 2).
 Set primary-side of the threephase transformer in delta connection 380V and set the secondary-
side to star UN-15%. Insert all plugs connecting the capacitances to the line model. Connect the
three-phase balanced ohmic load to outgoing power circuit breaker and set the load resistance
value to R5: the load must be supplied alternatively from busbar 1 or from busbar 2 as desired.
 Initially switch on the main switch in order to supply the three-phase transformer and the line
model.
 First of all, a connection is to be established between busbar 1 and the load. Switching sequence:
1. Initially activate the disconnectors Q1 and Q3. 2. Then activate the power circuit breaker K1:
the bus bar 1 is alive. 3.
 Now activate the power circuit breaker K3: the busbar 1 feeds the load. 4. Finally activate in
sequence the disconnector Q2 and the power circuit breaker K2: the busbar 2 is alive also.
 Measure the busbar voltages: U1 = .......... (V) U2 = .................... (V)
 Measure the circuit currents: I1 = ............ (A) I2 = ...........(A) I = ...............(A) It must result I1 =
I and I2 = 0: busbar 1 feeds the load. Now carry out a bus transfer so that the supply of the load is
performed from busbar 2.
 The switching sequence in order to transfer the load from the busbar 1 to busbar 2 is: 1. Initially
switch off the power circuit breaker K3.
 The load is isolated: this phenomenon normally does not occur in practice with regard to network
operation. 2.
 Then switch off the disconnector Q3. 3. Now switch on the disconnector Q4. 4. Finally switch on
again the power circuit breaker K3.
 Measure the voltage at both busbars: U1 = ............(V) U2 = ................. (V)
 Measure the circuit currents: I1 = .............(A) I2 = .................(A) I = ..................(A)
 It must result I1 =0 and I2 = I: now busbar 2 feeds the load.