RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)

DOCUMENT TRANSMITTAL

Ref. No: 9686-TR-OT-8868


Date: 14 January 2021

To: Zhang Zhi | China Petroleum Pipeline Engineering Co., Ltd.| RMCOP Project – Phase 1
Email: [email protected]
cc: Xing Hang | Project Manager | China Petroleum Pipeline Engineering Co., Ltd.

Transmittal Title: PROCEDURES & ITP - EXPANSION AND TIE IN SPOOL FABRICATION

Documents For:
☒ A – Action ☐ IFR – Review ☐ IFA – for Approval

☐ IFI – Information ☐ IFD – Design ☐ IFB – Bid

☐ IFU – Use ☐ IFP – Purchase ☐ IFCH –Construction with Holds

☐ IFQ – Quotation ☐ IFC – Construction ☐ O – Others

☐ IFF – Fabrication ☐ IFV – Void

☐ IAS – Final As-Built ☐ IR –Record

Response Required: Yes

DOCUMENTS

ITEM DOCUMENT/DRAWING
NO. NO. DESCRIPTION/TITLE Rev Status

9686-6130-ITP-100-0103 ITP FOR FABRICATION AND WELDING - B1 CODE 3


1. EXPANSION AND TIE IN SPOOL
FABRICATION

9686-6130-ITP-100-0104 ITP FOR WELDER QUALIFICATION TESTS - B1 CODE 3


2. EXPANSION AND TIE IN SPOOL
FABRICATION

9686-6130-PR-100-0124 WELDER QUALIFICATION PROCEDURE - B1 CODE 3


3. EXPANSION AND TIE IN SPOOL
FABRICATION

9686-6130-PR-100-0126 MAGNETIC PARTICLE EXAMINATION B1 CODE 3


4. PROCEDURE - EXPANSION AND TIE IN
SPOOL FABRICATION

9686-6130-PR-100-0127 WELDING CONSUMABLE CONTROL B1 CODE 3


5. PROCEDURE - EXPANSION AND TIE IN
SPOOL FABRICATION

9686-TR-OT-8868 Page 1 of 2
RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)
DOCUMENT TRANSMITTAL

9686-6130-PR-100-0129 ULTRASONIC EXAMINATION PROCEDURE B1 CODE 3


6. - EXPANSION AND TIE IN SPOOL
FABRICATION

REMARKS
CPP to revise the subject document as per Company comments in attached mark -up document and copy all
Company comments into CRS and provide item -wise response.

ORIGINATOR DOCUMENT CONTROL CENTRE RECEIVER

NAME James Orzales NAME Ronald Gonzales NAME Zhang Zhi

SIGN SIGN SIGN

DATE 14 Jan 2021 DATE 14 Jan 2021 DATE

9686-TR-OT-8868 Page 2 of 2