Ovr Dossier.

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 93

SURIA ENGINEERING

DOSSIER FOR OVR STRUCTURE

EDC/VCM EXTENTION

09TH July 2020

CLIENT:

M/S ENGRO POLYMER & CHEMICALS PVT LTD,

PORT QASIM, KARACHI - PAKISTAN

D – 50 TEXTILE AVENUE S.I.T.E


KARACHI – PAKISTAN.
Call: 92 2 1 32584377
Fax: 92 21 32588802
Cell: 92 300 8238213 / 92 321 2159684
[email protected]

www.suriaengineering.com

1
+

TABLE OF CONTENTS
DOC NO.:-QC-FIL-001

Sr. No. DOCUMENTS DESCRIPTION

1. QUALITY INSPECTION PLAN (QIP) 4

2. SUMMARY FOR BILL OF MATERIAL 6

3. MATERIAL TEST CERTIFICATES 8-19

4. WPS & WQT 21-31

5. DPT PROCEDURE REPORT 33-35

6. DPT TESTING REPORT 36-37

7. DIMENSIONAL INSPECTION REPORT. 39-56

8. SAND BLASTING AND PAINT APPLICATION PROCEDURE 58-61

9. FIT UP LAYOUT AND RANDOM PICTURES 63-75

10. LOCAL BEAMS LOCATION DRAWING 77-91

2
3
1. QUA
LITY
INPE
CTIO
N
PLA
N

4
5
2. BOQ SUMMARY REPORT

6
7
3. MATERIAL TEST CERTIFICATE

8
9
10
IDENTIFICATION MARK ON BEAM

MTC Document:

11
IDENTIFICATION MARK ON BEAM

MTC Document:

12
IDENTIFICATION MARK ON BEAM

MTC Document:

13
IDENTIFICATION MARK ON BEAM

MTC Document:

14
IDENTIFICATION MARK ON BEAM

15
MTC Document:

12MM PLATE

16
17
16MM PLATE

10MM PLATE

18
30MM PLATE

19
20
40MM PLATE

21
4. WPS & WQT

22
S U R IA E N G IN E E R IN G

W E L D IN G P R O C E D U R E S P E C IF IC A T IO N (W P S )

26-March-20
C lie n t: EPCL D a te :
W e l d in g P r o c e d u r e S p e c ific a tio n N o . : SE-QC-WPS-MS36B-03F Project: EPCL (OVR STRUCTURE)
R e v is io n : S u p p o rtin g P Q R N o .: S E -Q C -P Q R -M S 3 6 B -0 1 A
W e l d in g P r o c e s s ( e s ) : SM A W T y p e (s ) : M anual
C ode / S TD : A s p e r A S M E S e c tio n IX

N o te :
R o o t, F illin g a n d c a p p in g to b e d o n e b y S M A W p r o c e s s
P la te T h ic k n e s s M a x im u m 4 0 m m
S h e ll to S h e ll a n d F ille t w e ld a ll th ic k n e s s e s .

to P .N o . 1 G rou p N o. 1
P .N O . 1 G ro u p N o . 1
B A S E M E T A L ( Q W .4 0 3 ) O R

S p e c ific a tio n ty p e a n d G r a d e A S T M S A -3 6 G ra d e B
to S p e c ific a tio n ty p e a n d G r a d e A S T M S A -3 6 G ra d e B
O R

B a s e M e ta l : G ro ove 2~4m m F ille t F ille t A ll th ic k n e s s


B a s e P la te SA 36 16m m F ille t
O th e r: P i p e D ia r a n g e u n l im it e d F ille t

F IL L E R M E T A L S PO STW ELD H E A T TR EA TM E N T
( Q W .4 0 4 ) (Q W .4 0 7 )
SM A W SM AW
R O O T H O T PA SS F IL L /C A P R O O T F IL L CA P T e m p eratu re R an g e : N /A
S p e c. N o . (S F A ) 5 .1 5 .1 T im e R a n g e : N /A
A W S N o . (C la s s ) E -7 0 18 E -7 0 18 S o a k in g T im e a t M a x T e m p : N /A
F .N o . 4 4
A . N o. 1 1
S iz e o f F ille r M e ta ls 3 .2 m m / 4 m m 3 .2 m m / 4 m m G A S
W e ld M e ta l F /C -E 7 0 18 E 7018 (Q W -4 0 8 )
F ille t A ll T h ic k n e s s A ll T h ic k n e s s S h ie ld in g G a s ( e s ) :
E le c tr o d e F lu x (C la s s ) P ercen t :
F lu x T r a d e N a m e F lo w :
C o n s u m a b le I n s e r t ` G as : N /A
O th er T r a ilin g S h ie ld in g G a s C o m p o s it io n : N /A
E a c h b a s e & fille r m e ta l c o m b in a t io n s h o u ld r e c o r d in d iv id u a lly

P O S I T I O N S ( Q W .4 0 5 ) P O S T W E L D H E A T T R E A T M E N T ( Q W .4 0 7 )
P o s it io n ( s ) o f G r o o v e V e r tic a l T e m p e ra tu re R a n g e
W e ld in g P o s itio n : U p 3 G T im e R a n g e
P o s it io n ( s ) o f F ille t A L L

P R E H E A T (Q W .4 0 6 ) G A S (Q W .4 0 8 )
P e rc e n t C o m p o s itio n
P re h e a t T e m p . M in . 55 D eg C G a s(e s) (M ix tu r e ) F lo w R a t e
I n te r p a s s T e m p M a in ta in . 250 D eg C S h ie ld in g
P r e h e a t M a in te n a n c e (I f R e q u ir e d ) B y P r o p a n e T o r c h T r a ilin g - - -
B a k in g o f e le c t r o d e 250 D eg C B a c k in g - - -

E L E C T R I C A L C H A R A C T E R I S T I C S ( Q W .4 0 9 )
C u rren t A C o r D C D C SM AW S T -(E N )
P o la r it y
A m p s. (R a n g e ) SM AW 8 0 -2 0 0 R E V (E P )
V o lts (R a n g e ) 1 8 -2 8

E le c tr o d e w ir e fe e d s p e e d 4” – 6”
E le c t r o d e S iz e a n d T y p e 2 .3 m m -4 m m

T E C H N I Q U E (Q W .4 1 0 )
S trin g o f W e a v e B e a d A ll S tr in g
O r ific e o r G a s C u p S iz e N /A
I n itia l a n d in t e r p a s s C le a n in g ( B r u s h in g , G r in d in g , e tc .) B r u s h in g & G r in d in g / P o w e r g r in d in g

M e th o d o f B a c k G o u g in g P ow er B ru sh
O s c illa t io n P o w e r G r in d in g
C o n ta c t T u b e to W o r k D is ta n c e N /A
M u lt ip le o r S in g le P a s s ( p e r s id e ) M u ltip le s
M u lt ip le o r S in g le E le c t r o d e s S i n g le
T ra v e l S p e ed (R a n g e ) 4 " -6 "
P e n n in g
O th e r

F ille r M e t a l C u rren t
W e ld T ype A m p V o lt T ravel O th e r
L ayers P ro cess C la s s D ia . P o la r R ange R ange Speed
R O O T SM A W E 70 18 3 .2 / 4 D .C 8 0 -2 0 0 1 8 -2 8 4 "- 6 "
H O T P A S S (I f R e q .) SM A W E 70 18 3 .2 / 4 D .C 8 0 -2 0 0 1 8 -2 8 4 "- 6 "
F IL L IN G 1 SM A W E 70 18 3 .2 / 4 D .C 8 0 -2 0 0 1 8 -2 8 4 "- 6 "
FILLING 2(If Req.) SM A W E 70 18 3 .2 / 4 D .C 8 0 -2 0 0 1 8 -2 8 4 "- 6 "
C A P P IN G SM A W E 70 18 3 .2 / 4 D .C 8 0 -2 0 0 1 8 -2 8 4 "- 6 "

Prepared By Approved By
SURIA ENGINEERING SURIA ENGINEERING
Name: Altaf Khan Name:

Signature: Signature:

Date: 26/3/2020 Date: 26/3/2020

23
SURIA ENGINEERING
Welder Qualification
WPS NO. SE-QC-WPS-MS36B-03F Test Date 13-01-2020

Name:Muhammad Idrees S/O Mushtaq Ahmad NIC#31304-9226576-1

Project: De-Bottel Necking of EDCVCM PLANT(PORT QASIM,KARACHI)

ACTUAL VALUES
QUALIFICATION RANGE
VARIABLE USED IN
ASME IX
QUALIFICATION
Process SMAW SMAW
Process Type MANUAL MANUAL
Backing Yes Yes
Material Specification SA-36 SA-36
P No. & Group No. (QW-423) P.No 1 & Gr.1 P.No.1 to 15F
Thickness 16mm 40mm
Diameter N/A N/A
Groove 60 DEGREE 60 DEGREE
Fillet ALL ALL
Filler Metal Space SFA No. 5.1 5.1
Filler Metal Class E-7018 E-7018
Filler Metal No. 4 3&4
Deposited Weld Thickness 12MM 12MM
Position 3G 3G
Welding Progression UPHILL UPHILL
Shielding Gas N/A N/A
Backing Gas N/A N/A
Current Amp 105-155 105-155
Polarity DC+VE DC+VE

For SURIA ENGINEERING:QA/QC ENGINEER For SURIA ENGINEERING:


NAME: Altaf Khan NAME: Noman Suria
Signature: Signature:
Date: Date:

24
25
SURIA ENGINEERING
Welder Qualification
WPS NO. SE-QC-WPS-MS36B-03F Test Date 19-11-2019

Name:M.Naveed S/O Abdul Satter NIC#43402-0460376-1

Project: De-Bottel Necking of EDCVCM PLANT(PORT QASIM,KARACHI)

ACTUAL VALUES
QUALIFICATION RANGE
VARIABLE USED IN
ASME IX
QUALIFICATION
Process SMAW SMAW
Process Type MANUAL MANUAL
Backing Yes Yes
Material Specification SA-36 SA-36
P No. & Group No. (QW-423) P.No 1 & Gr.1 P.No.1 to 15F
Thickness 10mm 20mm
Diameter N/A N/A
Groove 60 DEGREE 60 DEGREE
Fillet ALL ALL
Filler Metal Space SFA No. 5.1 5.1
Filler Metal Class E-7018 E-7018
Filler Metal No. 4 3&4
Deposited Weld Thickness 10MM 10MM
Position 3G 3G
Welding Progression UPHILL UPHILL
Shielding Gas N/A N/A
Backing Gas N/A N/A
Current Amp 105-155 105-155
Polarity DC+VE DC+VE

For SURIA ENGINEERING:QA/QC ENGINEER For SURIA ENGINEERING:


NAME: Altaf Khan NAME: Noman Suria
Signature: Signature:
Date: Date:

26
27
SURIA ENGINEERING
Welder Qualification
WPS NO. SE-QC-WPS-MS36B-03F Test Date 19-11-2019

Name:Salman S/O Niaz Muhammad NIC#42401-2947214-7

Project: De-Bottel Necking of EDCVCM PLANT(PORT QASIM,KARACHI)

ACTUAL VALUES
QUALIFICATION RANGE
VARIABLE USED IN
ASME IX
QUALIFICATION
Process SMAW SMAW
Process Type MANUAL MANUAL
Backing Yes Yes
Material Specification SA-36 SA-36
P No. & Group No. (QW-423) P.No 1 & Gr.1 P.No.1 to 15F
Thickness 10mm 20mm
Diameter N/A N/A
Groove 60 DEGREE 60 DEGREE
Fillet ALL ALL
Filler Metal Space SFA No. 5.1 5.1
Filler Metal Class E-7018 E-7018
Filler Metal No. 4 3&4
Deposited Weld Thickness 10MM 10MM
Position 3G 3G
Welding Progression UPHILL UPHILL
Shielding Gas N/A N/A
Backing Gas N/A N/A
Current Amp 105-155 105-155
Polarity DC+VE DC+VE

For SURIA ENGINEERING:QA/QC ENGINEER For SURIA ENGINEERING:


NAME: Altaf Khan NAME: Noman Suria
Signature: Signature:
Date: Date:

28
29
SURIA ENGINEERING
Welder Qualification
WPS NO. SE-QC-WPS-MS36B-03F Test Date 13-01-2020

Name:M.Hassan S/O Allah Rakha NIC#36603-3364708-1

Project: De-Bottel Necking of EDCVCM PLANT(PORT QASIM,KARACHI)

ACTUAL VALUES
QUALIFICATION RANGE
VARIABLE USED IN
ASME IX
QUALIFICATION
Process SMAW SMAW
Process Type MANUAL MANUAL
Backing Yes Yes
Material Specification SA-36 SA-36
P No. & Group No. (QW-423) P.No 1 & Gr.1 P.No.1 to 15F
Thickness 16mm 40mm
Diameter N/A N/A
Groove 60 DEGREE 60 DEGREE
Fillet ALL ALL
Filler Metal Space SFA No. 5.1 5.1
Filler Metal Class E-7018 E-7018
Filler Metal No. 4 3&4
Deposited Weld Thickness 12MM 12MM
Position 3G 3G
Welding Progression UPHILL UPHILL
Shielding Gas N/A N/A
Backing Gas N/A N/A
Current Amp 105-155 105-155
Polarity DC+VE DC+VE

For SURIA ENGINEERING:QA/QC ENGINEER For SURIA ENGINEERING:


NAME: Altaf Khan NAME: Nauman SURIA
Signature: Signature:
Date: Date:

30
31
SURIA ENGINEERING
Welder Qualification
WPS NO. SE-QC-WPS-MS36B-03F Test Date 13-01-2020

Name:Tabassam Hussain S/O Munnawar Hussain NIC#31304-3840895-3

Project: De-Bottel Necking of EDCVCM PLANT(PORT QASIM,KARACHI)

ACTUAL VALUES
QUALIFICATION RANGE
VARIABLE USED IN
ASME IX
QUALIFICATION
Process SMAW SMAW
Process Type MANUAL MANUAL
Backing Yes Yes
Material Specification SA-36 SA-36
P No. & Group No. (QW-423) P.No 1 & Gr.1 P.No.1 to 15F
Thickness 16mm 40mm
Diameter N/A N/A
Groove 60 DEGREE 60 DEGREE
Fillet ALL ALL
Filler Metal Space SFA No. 5.1 5.1
Filler Metal Class E-7018 E-7018
Filler Metal No. 4 3&4
Deposited Weld Thickness 12MM 12MM
Position 3G 3G
Welding Progression UPHILL UPHILL
Shielding Gas N/A N/A
Backing Gas N/A N/A
Current Amp 105-155 105-155
Polarity DC+VE DC+VE

For SURIA ENGINEERING:QA/QC ENGINEER For SURIA ENGINEERING:


NAME: Altaf Khan NAME: Nauman Suria
Signature: Signature:
Date: Date:

32
33
5. DPT PROCEDURE & REPORT

34
1.0 Scope.

This Procedure Provides a System of general conditions and Specific Instructions to perform Liquid
Penetrant Examination in accordance with the applicable ASME code edition for Examination of
Carbon Steel, Stainless Steel, Welds and on Porous Material.

2.0 Equipment and Material.

2.1 Penetrant Material used Shall be water Washable, Visible Colour contrast of the
Following Specifications
2.1.1 Brand
Magnaflux Spot Check
2.1.2 Material Specifications
Penetrant SLK-SPI in aerosol can.
Cleaner SKC-S in aerosol can.
Developer SKD-S2 in aerosol can.
2.2 Any change in Material from the above list shall require requalification of Procedure
2.3 Intermixing of Penetrant Materials of different manufacturers is not permitted.

3.0 Procedure.

3.1 Surface Preparation.

Surfaces to be Examined may be in the as Welded, as rolled condition Grinding may be


necessary in certain cases where surface Irregularities Could Mask unacceptable
Discontinuities.

3.2 Pre-Examination Cleaning.

3.2.1 Prior to Penetrant application the Surface to be Examined and all the adjacent Areas
Within 25mm Shall be Cleaned by Mechanical Means and Solvent to remove dirt, grease
Scale, Welding flux or other matter which could interfere with the Examination
3.2.2 Operations that may Close the opening and Compromise the integrity of the Examination
Such as sand blasting are not recommended when these operations are being performed.
3.2.3 A Minimum of five minutes Shall be allowed for drying the surface to be Examined
Accomplished by evaporation before applying Penetrant.

35
3.3 Techniques for Standard Temperature.

3.3.1 The Temperature of the Penetrant and the Surface of the part to be Examined Shall
not be below 5˚c nor above 52˚c, Local Heating or Cooling is permitted.

3.3.2 Penetrant Application.

The Penetrant Shall be Applied by Spraying, so that all Surface under Examination
Shall be Thoroughly and uniformly covered by Penetrant.

3.3.3 Penetrant Dwell Time.

After Application excess Penetrant is drained out from the part allowing suitable Dwell
Time of minimum 5 minutes. The area to be examined Shall remain covered by Penetrant
throughout the Dwell time.

3.4 Penetrant Removal.

3.4.1 After Dwell time the Penetrant on the Surface Shall be Removed by using Clean with
Cloth This operation Shall Continue until most traces of Penetrant on the surface is
Removed.
3.4.2 The Remaining Traces of Penetrant Shall be Removed be wiping the Surface Clean
with Cloth moistened with solvent remover, to Minimize removal of Penetrant from
discontinues, care Shall be taken to avoid excess Solvent Remover.
3.4.3 Flushing the surface with solvent remover following application of the penetrant and
prior to developing is strictly prohibited.

3.5 Application of Developer.

3.5.1 The developer is of Solvent, Suspended wet type and shall be applied as soon as possible
after excess penetrant has been removed and part is dried Developer Shall be Sprayed in
such a manner to assure complete coverage with a thin uniform film. The Second coat
may be applied across the first coat.

4.0 interpretation of indication.

4.1 All examination Shall be performed in ordinary sun light


4.2 Observation of the formation of indications Shall be performed during the application of
Developer. If defects are present they will show up as red indications on white Developer
Coating.

36
5.0 Acceptance standards

5.1 The Following acceptance standards shall apply which have been referred from ASME
Sec-I, Sec VIII Division -I
5.2 All Welds Such as Longitudinal and Circumferential seams, including fillet weld
Pressure Parts. Joining of Nipples. Header Shall be Free of all relevant Indication
5.2.1 All Cracks. Lack of fusion and relevant imperfections

x______________________________________x

37
38
39
6. DIMENSIONAL INSPECTION

40
ELEVATION.102.400
Beam to beam distance found as per drawing.

41
ELEVATION.103.700
Beam to beam distance found as per drawing.

ELEVATION.105.500
Beam to beam distance found as per drawing.

42
ELEVATION.106.690
Beam to beam distance found as per drawing.

ELEVATION.106.800
Beam to beam distance found as per drawing.

43
ELEVATION.108.000
Beam to beam distance found as per drawing.

44
ELEVATION.108.700
Beam to beam distance found as per drawing.

45
ELEVATION.109.990
Beam to beam distance found as per drawing.

46
ELEVATION.
EL-111.000, EL-111.673, EL-114.000 Numbering
Beam to beam distance found as per drawing.

47
ELEVATION. 112.000 Numbering
Beam to beam distance found as per drawing.

48
ELEVATION.116.800
Beam to beam distance found as per drawing

49
ELEVATION.119.100
Beam to beam distance found as per drawing

50
ELEVATION.118.600
Beam to beam distance found as per drawing

51
7. DIMENSIONAL REPORT

52
DOCUMENT NO – DVD-010-016
REV- 00
DATE- 15-11-2019
PAGE- 01 of 06

DIMENSIONAL INSPECTION REPORT


CLIENT- ENGRO POLYMER ITEM DESCRIPTION – STEEL STRUCTURE
DRAWING NO- 8326-09-009-D1332-001 STAGE INSPECTION – CONNECTIONS DIMENSION
SHOP MANUFACTURE NO.- VCL FINAL INSPECTION - YES
REV NO- 0 INSPECTION AGENCY: ENGRO POLYMER
ATTACHMENT: SKETCH: DRAWING: DIMENSION UNITS- MILLIMETERS INCHES

Size (mm)
Serial No. Location Description QTY. Remarks
Drawing Accepted Rejected
01 COLUMN HEB320 1 14850 Accepted
02 COLUMN HEB320 1 19100 Accepted
03 COLUMN HEB260 1 8215 Accepted
04 COLUMN HEB320 1 14850 Accepted
05 COLUMN HEB320 1 19100 Accepted
06 EL+102.575 IPE240/SR 1 8215 Accepted
07 EL+104.000 IPE300/SS 1 2350 Accepted
08 EL+104.000 HEB260/EMH1 1 6000 Accepted
09 EL+104.000 HEA160/PSB 1 4000 Accepted
10 EL+105.000 IPE300/SS 1 1000 Accepted
11 EL+105.000 IPE300/SS 1 6000 Accepted
12 EL+105.000 IPE240/SS 1 6000 Accepted
13 EL+105.000 IPE240/SS 1 3000 Accepted
14 EL+105.000 IPE240/SS 1 3000 Accepted
15 EL+105.000 IPE240/SS 1 3000 Accepted
16 EL+105.000 IPE300/SS 1 3000 Accepted
17 EL+105.000 IPE200/SS 1 6000 Accepted
18 EL+105.000 IPE200/SS 1 1450 Accepted
19 EL+105.000 IPE200/SS 1 1400 Accepted
20 EL+105.000 IPE240/SR 1 1450 Accepted
21 EL+105.000 IPE450/EM 1 2350 Accepted
22 EL+105.000 IPE200/SS 1 3000 Accepted
23 EL+105.000 IPE450/EM 1 3000 Accepted
24 EL+105.000 IPE200/SS 1 3000 Accepted
25 EL+105.000 IPE400/EM 1 4000 Accepted
26 EL+105.000 IPE200/SS 1 4000 Accepted
27 EL+105.000 IPE200/SS 1 1000 Accepted
28 EL+105.000 IPE300/SS 1 1090 Accepted
29 EL+105.000 IPE200/SS 1 2900 Accepted
30 EL+105.000 IPE200/SS 1 1000 Accepted
31 EL+105.000 IPE400/EM 1 1090 Accepted
32 EL+105.000 IPE200/SS 1 2900 Accepted
33 EL+105.000 IPE200/SS 1 810 Accepted
34 EL+105.000 UPN200/SR 1 1075 Accepted
35 EL+105.000 CT150/LT 1 3970 Accepted
36 EL+105.000 CT150/LT 1 3970 Accepted
37 EL+105.000 L90/LT 1 1844 Accepted
QC INSPECTOR SURIA QUALITY DEPT.
SIGNATURE SIGNATURE
NAME ALTAF KHAN NAME
DATE 23-03-2020 DATE

53
DOCUMENT NO – DVD-010-016
REV- 00
DATE- 15-11-2019
PAGE- 02 of 06

DIMENSIONAL INSPECTION REPORT


CLIENT- ENGRO POLYMER ITEM DESCRIPTION – STEEL STRUCTURE
DRAWING NO- 8326-09-009-D1332-001 STAGE INSPECTION – CONNECTIONS DIMENSION
SHOP MANUFACTURE NO.- VCL FINAL INSPECTION - YES
REV NO- 0 INSPECTION AGENCY: ENGRO POLYMER
ATTACHMENT: SKETCH: DRAWING: DIMENSION UNITS- MILLIMETERS INCHES

Size (mm)
Serial No. Location Description QTY. Remarks
Drawing Accepted Rejected
38 EL+105.000 L90/LT 1 1844 Accepted
39 EL+108.215 IPE300/SS 1 6000 Accepted
40 EL+108.215 IPE300/SS 1 6000 Accepted
41 EL+108.215 IPE300/SS 1 6000 Accepted
42 EL+108.215 HEA400/SS 1 6000 Accepted
43 EL+108.215 IPE300/SS 1 1900 Accepted
44 EL+108.215 IPE300/SS 1 1900 Accepted
45 EL+108.215 IPE300/SS 1 1900 Accepted
46 EL+108.215 IPE300/SS 1 2000 Accepted
47 EL+108.215 IPE300/SS 1 2000 Accepted
48 EL+108.215 IPE300/SS 1 2000 Accepted
49 EL+108.215 IPE200/SS 1 850 Accepted
50 EL+108.215 IPE200/SS 1 850 Accepted
51 EL+108.215 IPE200/SS 1 850 Accepted
52 EL+108.215 IPE200/SS 1 850 Accepted
53 EL+108.215 IPE200/SS 1 1250 Accepted
54 EL+108.215 IPE200/SS 1 1200 Accepted
55 EL+108.215 IPE200/SS 1 1250 Accepted
56 EL+108.215 IPE200/SS 1 1250 Accepted
57 EL+108.215 IPE200/SS 1 1200 Accepted
58 EL+108.215 IPE200/SS 1 1250 Accepted
59 EL+108.215 IPE240/SR 1 2350 Accepted
60 EL+108.215 IPE400/EM 1 3000 Accepted
61 EL+108.215 IPE200/SS 1 1100 Accepted
62 EL+108.215 IPE200/SS 1 900 Accepted
63 EL+108.215 IPE400/EM 1 3000 Accepted
64 EL+108.215 IPE200/SS 1 4000 Accepted
65 EL+108.215 IPE400/EM 1 4000 Accepted
66 EL+108.215 IPE400/SSD2 1 4000 Accepted
67 EL+108.215 IPE400/SSD2 1 4000 Accepted
68 EL+108.215 IPE400/SSD2 1 4000 Accepted
69 EL+108.215 IPE400/SSD2 1 4000 Accepted
70 EL+108.215 IPE400/EM 1 4000 Accepted
71 EL+108.215 IPE200/SS 1 4000 Accepted
72 EL+108.215 IPE400/SS 1 6000 Accepted
73 EL+108.215 L90/LT 1 1202 Accepted
74 EL+108.215 L90/LT 1 1202 Accepted
QC INSPECTOR SURIA QUALITY DEPT.
SIGNATURE SIGNATURE
NAME ALTAF KHAN NAME
DATE 25-03-2020 DATE

54
DOCUMENT NO – DVD-010-016
REV- 00
DATE- 15-11-2019
PAGE- 03 of 06

DIMENSIONAL INSPECTION REPORT


CLIENT- ENGRO POLYMER ITEM DESCRIPTION – STEEL STRUCTURE
DRAWING NO- 8326-09-009-D1332-001 STAGE INSPECTION – CONNECTIONS DIMENSION
SHOP MANUFACTURE NO.- VCL FINAL INSPECTION - YES
REV NO- 0 INSPECTION AGENCY: ENGRO POLYMER
ATTACHMENT: SKETCH: DRAWING: DIMENSION UNITS- MILLIMETERS INCHES

Size (mm)
Serial No. Location Description QTY. Remarks
Drawing Accepted Rejected
75 EL+108.215 CT150/LT 1 3889 Accepted
76 EL+108.215 CT150/LT 1 3889 Accepted
77 EL+108.215 L90/LT 1 1697 Accepted
78 EL+108.215 L90/LT 1 1202 Accepted
79 EL+108.215 L90/LT 1 1202 Accepted
80 EL+108.215 IPE300/SS 1 935 Accepted
81 EL+108.215 IPE300/SS 1 652 Accepted
82 EL+108.215 IPE300/SS 1 1076 Accepted
83 EL+108.215 IPE300/SS 1 793 Accepted
84 EL+108.215 IPE300/SS 1 793 Accepted
85 EL+108.215 IPE300/SS 1 935 Accepted
86 EL+108.215 IPE300/SS 1 935 Accepted
87 EL+108.215 IPE300/SS 1 1076 Accepted
88 EL+108.215 L90/LT 1 1500 Accepted
89 EL+108.215 IPE200/SS 1 700 Accepted
90 EL+108.215 IPE200/SS 1 700 Accepted
91 EL+109.500 UPN200/SS 1 3800 Accepted
92 EL+109.500 UPN200/SR 1 1200 Accepted
93 EL+109.500 UPN200/SR 1 1200 Accepted
94 EL+109.500 UPN200/SS 1 3800 Accepted
95 EL+109.500 UPN200/SS 1 1200 Accepted
96 EL+109.500 L90/LT 1 2122 Accepted
97 EL+109.500 L90/LT 1 2122 Accepted
98 EL+109.500 HEA160/PSC 1 1285 Accepted
99 EL+109.500 HEA160/PSC 1 1285 Accepted
100 EL+109.500 L90/LT 1 1393 Accepted
101 EL+109.500 L90/LT 1 1393 Accepted
102 EL+109.500 HEA160/PSC 1 1285 Accepted
103 EL+109.500 HEA160/PSC 1 1285 Accepted
104 EL+109.500 L90/LT 1 1393 Accepted
105 EL+109.500 L90/LT 1 1393 Accepted
106 EL+111.652 IPE300/SS 1 6000 Accepted
107 EL+111.652 IPE300/SS 1 6000 Accepted
108 EL+111.652 IPE300/EM 1 3000 Accepted
109 EL+111.652 IPE300/EM 1 3000 Accepted
110 EL+111.652 IPE240/SR 1 2350 Accepted
111 EL+114.850 IPE400/SS 1 6000 Accepted
QC INSPECTOR SURIA QUALITY DEPT.
SIGNATURE SIGNATURE
NAME ALTAF KHAN NAME
DATE 15-03-2020 DATE

55
DOCUMENT NO – DVD-010-016
REV- 00
DATE- 15-11-2019
PAGE- 04 of 06

DIMENSIONAL INSPECTION REPORT


CLIENT- ENGRO POLYMER ITEM DESCRIPTION – STEEL STRUCTURE
DRAWING NO- 8326-09-009-D1332-001 STAGE INSPECTION – CONNECTIONS DIMENSION
SHOP MANUFACTURE NO.- VCL FINAL INSPECTION - YES
REV NO- 0 INSPECTION AGENCY: ENGRO POLYMER
ATTACHMENT: SKETCH: DRAWING: DIMENSION UNITS- MILLIMETERS INCHES

Size (mm)
Serial No. Location Description QTY. Remarks
Drawing Accepted Rejected
112 EL+114.850 IPE240/SS 1 2210 Accepted
113 EL+114.850 IPE240/SS 1 2210 Accepted
114 EL+114.850 IPE240/SS 1 2210 Accepted
115 EL+114.850 IPE240/SS 1 2210 Accepted
116 EL+114.850 IPE240/SS 1 2210 Accepted
117 EL+114.850 IPE240/SS 1 2210 Accepted
118 EL+114.850 HEA260/SSD1 1 1580 Accepted
119 EL+114.850 HEA260/SSD1 1 1580 Accepted
120 EL+114.850 IPE400/SS 1 6000 Accepted
121 EL+114.850 UPN200/SS 1 1000 Accepted
122 EL+114.850 IPE240/SR 1 2350 Accepted
123 EL+114.850 UPN220/SS 1 1510 Accepted
124 EL+114.850 IPE400/EM 1 3000 Accepted
125 EL+114.850 IPE200/SS 1 750 Accepted
127 EL+114.850 IPE200/SS 1 750 Accepted
128 EL+114.850 IPE200/SS 1 750 Accepted
129 EL+114.850 HEA260/SS1 1 3000 Accepted
130 EL+114.850 HEA260/SS1 1 3000 Accepted
131 EL+114.850 IPE200/SS 1 750 Accepted
132 EL+114.850 IPE200/SS 1 750 Accepted
133 EL+114.850 IPE200/SS 1 750 Accepted
134 EL+114.850 IPE400/EM 1 3000 Accepted
135 EL+114.850 IPE240/SR 1 1275 Accepted
136 EL+114.850 IPE240/SR 1 1275 Accepted
137 EL+114.850 CT150/LT 1 1927 Accepted
138 EL+114.850 CT150/LT 1 2164 Accepted
139 EL+114.850 CT150/LT 1 2116 Accepted
140 EL+114.850 CT150/LT 1 2164 Accepted
141 EL+114.850 L90/LT 1 1870 Accepted
142 EL+114.850 UPN200/SS 1 1000 Accepted
143 EL+119.100 HEA160/PSC 1 4250 Accepted
144 EL+119.100 HEA160/PSC 1 4250 Accepted
145 EL+119.100 IPE240/SS 1 1700 Accepted
146 EL+119.100 UPN200/SS 1 950 Accepted
147 EL+119.100 IPE200/SS 1 850 Accepted
148 EL+119.100 IPE240/SS 1 1700 Accepted
149 EL+119.100 IPE200/SS 1 1025 Accepted
QC INSPECTOR SURIA QUALITY DEPT.
SIGNATURE SIGNATURE
NAME ALTAF KHAN NAME
DATE 15-03-2020 DATE

56
DOCUMENT NO – DVD-010-016
REV- 00
DATE- 15-11-2019
PAGE- 05 of 06

DIMENSIONAL INSPECTION REPORT


CLIENT- ENGRO POLYMER ITEM DESCRIPTION – STEEL STRUCTURE
DRAWING NO- 8326-09-009-D1332-001 STAGE INSPECTION – CONNECTIONS DIMENSION
SHOP MANUFACTURE NO.- VCL FINAL INSPECTION - YES
REV NO- 0 INSPECTION AGENCY: ENGRO POLYMER
ATTACHMENT: SKETCH: DRAWING: DIMENSION UNITS- MILLIMETERS INCHES

Size (mm)
Serial No. Location Description QTY. Remarks
Drawing Accepted Rejected
150 EL+119.100 IPE240/EMT1 1 3000 Accepted
151 EL+119.100 IPE200/SS 1 3000 Accepted
152 EL+119.100 IPE240/EMT1 1 3000 Accepted
153 EL+119.100 L90/LT 1 2267 Accepted
154 EL+119.100 L90/LT 1 2267 Accepted
155 LINE FRAME A CT150/LT 1 4243 Accepted
156 LINE FRAME A CT150/LT 1 4243 Accepted
157 LINE FRAME A CT150/LT 1 4386 Accepted
158 LINE FRAME A CT150/LT 1 6177 Accepted
159 LINE FRAME A L90/LT 1 1697 Accepted
160 LINE FRAME A L90/LT 1 1697 Accepted
161 LINE FRAME A CT150/LT 1 1980 Accepted
162 LINE FRAME B L90/LT 1 1450 Accepted
163 LINE FRAME B CT150/LT 1 2722 Accepted
164 LINE FRAME B CT150/LT 1 2352 Accepted
165 LINE FRAME B CT150/LT 1 4243 Accepted
166 LINE FRAME B CT150/LT 1 4263 Accepted
167 LINE FRAME B L90/LT 1 1414 Accepted
168 LINE FRAME B L90/LT 1 1697 Accepted
169 LINE FRAME B L90/LT 1 1697 Accepted
170 LINE FRAME B CT150/LT 1 1980 Accepted
171 LINE FRAME B CT150/LT 1 3551 Accepted
172 LINE FRAME B CT150/LT 1 3551 Accepted
173 LINE FRAME C L90/LT 1 1450 Accepted
174 LINE FRAME C CT150/LT 1 2722 Accepted
175 LINE FRAME C CT150/LT 1 2722 Accepted
176 LINE FRAME C CT180/LT 1 4243 Accepted
177 LINE FRAME C CT180/LT 1 4243 Accepted
178 LINE FRAME C CT150/LT 1 1891 Accepted
179 LINE FRAME C CT150/LT 1 4243 Accepted
180 LINE FRAME C CT150/LT 1 4243 Accepted
181 LINE FRAME C CT150/LT 1 1577 Accepted
182 LINE FRAME C CT150/LT 1 4243 Accepted
183 LINE FRAME C CT150/LT 1 4243 Accepted
184 LINE FRAME 1 CT150/LT 1 3325 Accepted
185 LINE FRAME 1 CT150/LT 1 3325 Accepted
186 LINE FRAME 2 L90/LT 1 1803 Accepted
QC INSPECTOR SURIA QUALITY DEPT.
SIGNATURE SIGNATURE
NAME ALTAF KHAN NAME
DATE 21-03-2020 DATE

57
DOCUMENT NO – DVD-010-016
REV- 00
DATE- 15-11-2019
PAGE- 06 of 06

DIMENSIONAL INSPECTION REPORT


CLIENT- ENGRO POLYMER ITEM DESCRIPTION – STEEL STRUCTURE
DRAWING NO- 8326-09-009-D1332-001 STAGE INSPECTION – CONNECTIONS DIMENSION
SHOP MANUFACTURE NO.- VCL FINAL INSPECTION - YES
REV NO- 0 INSPECTION AGENCY: ENGRO POLYMER
ATTACHMENT: SKETCH: DRAWING: DIMENSION UNITS- MILLIMETERS INCHES

Size (mm)
Serial No. Location Description QTY. Remarks
Drawing Accepted Rejected
187 LINE FRAME 1 CT150/LT 1 3323 Accepted
188 LINE FRAME 1 CT150/LT 1 3323 Accepted
189 LINE FRAME 1 CT150/LT 1 2122 Accepted
190 LINE FRAME 1 L90/LT 1 1520 Accepted

QC INSPECTOR SURIA QUALITY DEPT.


SIGNATURE SIGNATURE
NAME ALTAF KHAN NAME
DATE 21-03-2020 DATE

58
8. SAND BLASTING AND
PAINTING PROCEDURE

59
.
Purchaser: Engro Polymer & Chemical
PO:
Limited. S a n d B l a s ti n g a n d P a i n ti n g A p p l i c a ti o n
Doc. No.: SE/EPCL/001
Project: EDC/VCM EXTENSION P ro ce d u re
Rev.:00

Painting Procedure

DOCUMENT CHANGE RECORD

Page Rev. Date Rev: Description Reviewed by A p p ro v e d b y


M .R G.M

0 04-01-2020 As per client comments

Name Designation Signature

Prepared By Altaf Khan QC Engineer

Approved By Nauman Suria

60
Purchaser: Engro Polymer & Chemical
PO:
Limited. Sand Blasting and Painting Application
Doc. No.: SE/EPCL/001
Project: EDC/VCM EXTENSION Procedure
Rev.:00

1) General:

This procedure covers the outline of procedure adapted for the sand blasting
and primer application for structure.

2) Surface Preparation:

 Surface preparation shall be carried out by sand blasting and shall be


carried out after completion of fabrication.

 Sand blasting method shall be adopted for surface preparation. Before


blasting it shall be ensured that all weld spatters, flux and slag are removed
from weld beads.

 It shall be ensured that blasting nozzle pressure is suitable for achievement of


require profile of the blasted surface.

 Sand blasting could be done in late hours of a day but subject to weather condition.
Sand blasting shall not be done when surface temperature is less than 3°C above
the dew point and relative humidity is greater than 85% or there is a possibility that
blasted surface shall be subject to wetting before application of primer.

 Before blasting, oil, grease or other oily objects, if any, shall be removed with the
help of any detergent wash.

 All painted identification marks on parts of equipment shall be marked


permanently with the help of “Hard Punching”.

 To prevent the appearance of rust on blasted surface, primer shall be applied


within 3-4 hrs time.

61
Purchaser: Engro Polymer & Chemical
PO:
Limited. Sand Blasting and Painting Application
Doc. No.: SE/EPCL/001
Project: EDC/VCM EXTENSION Procedure
Rev.:00

3) PAINT APPLICATION:

Before starting of painting activities, "Manufacturer’s Data Sheets" will be reviewed


for type of components and their mixing ratio, pot life, coverage against DFT,
recommended thinner and drying time for over coating.

Activities involved in primer application are as below:

3.1) Primer Mixing:

Base will be stirred thoroughly to homogenize. Then hardener will be added to base
in recommended ratio as mentioned in “Manufacturer's Data Sheet” with constant
stirring. A
recommended solvent shall be mixed for required thinning of primer.

3.2) Primer Application:

3.2.1) Primer Application Method:

Roller and or brush shall be used for application of Primer, if not restricted by Primer
Specification Sheets” by manufacturer.

3.2.2) Production Painting (Primer Coats):

 After sand blasting primer shall be applied within 3 to 4 hours of blasting activity.

 After each coat, surface will be left for a period recommended for drying and recoating.

 Such quantity of primer shall be removed from containers and mixed with
hardeners and thinner, which must be consumed same day and with-in the Pot-life
time.

 Recommended quantity of thinner shall be added to achieve required flow ability of


primer.

 While applying the primer care shall be taken that paint should not be dripped,
sagged, skipped or dripped-off during application or immediately after application, if
these defects are detected then immediately be dressed with brush. If defect is not cured
then primer shall be removed completely and re-coated with the same system.

62
Purchaser: Engro Polymer & Chemical
PO:
Limited. Sand Blasting and Painting Application
Doc. No.: SE/EPCL/001
Project: EDC/VCM EXTENSION Procedure
Rev.:00

4) INSPECTIONS:

During surface preparation and primer application following inspection shall be carried out.

 For Surface Preparation:

Profile to be checked with the help of profile gauge. Profile reading


shall be as recommended for Sa. 2.5 standard.

 DFT of each coat:

DFT of each coat shall be 80-100 Microns and should be measured at 5 spots per 9
SQ.M, and for area less than 9 SQ.M; at least 3 spots shall be measured.

Average of these readings shall be with in range of average DFT recommendation


by paint manufacturer.

5) Paint System:

Following paint system shall be adopted for structure including (ladder /Platforms):

S.No. Description Make


1 RED OXIDE PRIMER NIPPON

63
9. FIT UP LAYOUT & RANDOM
PICTURES

64
65
66
67
68
69
70
71
72
73
74
75
76
77
10. LOCAL BEAMS LOCATION
DRAWING

78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93

You might also like