0% found this document useful (0 votes)
75 views

Manual Calculation

Uploaded by

Chh Song Zpermz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views

Manual Calculation

Uploaded by

Chh Song Zpermz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 67

DeepEX 2017: Report Output

Copyright@2009 - 2017 Deep Excavation LLC: www.deepexcavation.com A


program for the evaluation of deep excavations Deep Excavation LLC,
Astoria, New York, www.deepexcavation.com

Project: My Project

Company: My Company
Prepared by engineer: Engineer
File number: 1
Time: 5/23/2021 11:18:59 AM

THIS PROGRAM IS PROTECTED BY U.S. COPYRIGHT LAWS AS DESCRIBED IN THE EULA. UNAUTHORIZED
COPYING IS PROHIBITED. LICENSED TO: Deep Excavation LLC BY DEEP EXCAVATION LLC UNDER SPECIFIC
LICENCE. This report has printed because the user has accepted responsibility as described in the disclaimer and EULA
File: D:\I5\DESTOP\Soil DATA Kru Pov\Wall database\passs.DEEP
Project: My Project
Results for Design Section 0: Base model
3/67

Equations for design section: Base model


Equations for stage: Stage 0
4/67
5/67
6/67
7/67
8/67
9/67
10/67
11/67
12/67
13/67
14/67
15/67
16/67
17/67
18/67
19/67
20/67
21/67
22/67
23/67
24/67

Equations for stage: Stage 1


25/67
26/67
27/67
28/67
29/67
30/67
31/67
32/67
33/67
34/67
35/67
36/67
37/67
38/67
39/67
40/67
41/67
42/67
43/67
44/67

Critical equations for supports in design section: Base model


Equations for support at El. 0

Equations for wall CBP 800 design section: Base model, stage: Stage 0
45/67
46/67
47/67
Project: My Project
Results for Design Section 1: 0: EC7, 2007: DA-1, Comb.
1: A1 + M1 + R1
49/67

Equations for design section: 0: EC7, 2007: DA-1, Comb. 1: A1 + M1 + R1


Critical equations for supports in design section: 0: EC7, 2007: DA-1, Comb
Equations for support at El. 0

Equations for wall CBP 800 design section: 0: EC7, 2007: DA-1, Comb. 1: A1 + M1 + R1, stage: Stage 0
50/67
51/67
Project: My Project
Results for Design Section 2: 0: EC7, 2007: DA-1, Comb.
2: A2 + M2 + R1
53/67

Equations for design section: 0: EC7, 2007: DA-1, Comb. 2: A2 + M2 + R1


Critical equations for supports in design section: 0: EC7, 2007: DA-1, Comb
Equations for support at El. 0

Equations for wall CBP 800 design section: 0: EC7, 2007: DA-1, Comb. 2: A2 + M2 + R1, stage: Stage 0
54/67
55/67
Project: My Project
Results for Design Section 3: 0: EC7, 2007: DA-2: A1 +
M1 + R2
57/67

Equations for design section: 0: EC7, 2007: DA-2: A1 + M1 + R2


Critical equations for supports in design section: 0: EC7, 2007: DA-2: A1 +
Equations for support at El. 0

Equations for wall CBP 800 design section: 0: EC7, 2007: DA-2: A1 + M1 + R2, stage: Stage 0
58/67
59/67
Project: My Project
Results for Design Section 4: 0: EC7, 2007: DA-3: (A1*
or A2+) + M2 + R3
61/67

Equations for design section: 0: EC7, 2007: DA-3: (A1* or A2+) + M2 + R3


Critical equations for supports in design section: 0: EC7, 2007: DA-3: (A1*
Equations for support at El. 0

Equations for wall CBP 800 design section: 0: EC7, 2007: DA-3: (A1* or A2+) + M2 + R3, stage: Stage 0
62/67
63/67
Project: My Project
Results for Design Section 5: 0: EC7, 2007: EQU: M2 +
R1
65/67

Equations for design section: 0: EC7, 2007: EQU: M2 + R1


Critical equations for supports in design section: 0: EC7, 2007: EQU: M2 +
Equations for support at El. 0

Equations for wall CBP 800 design section: 0: EC7, 2007: EQU: M2 + R1, stage: Stage 0