OBJECTIVE
To work in a professionally run organization and contribute to its growth and enhance customer satisfaction levels with
the experience gained in successful companies
EDUCATION
From Dec 2018 till now: WAPCOS Ltd(A Government of India Undertaking)
(Re-joined) Chennai,Tamil Nadu,India
Role:- Project In-Charge for APSPDCL (ie,Andra Pradesh,Southern Region) covering Eight Circles for carrying out the
Third Party Concurrent Evaluation Agency(TPCEA) inspection for the Semi-Turnkey Projects under IPDS awarded by
Power Finance Corporation
Three Stages inspections to be carried out for the IPDS projects on intimation by the utilities. Following activities to
be carried out: Completed the 2nd stage TPCEA inspection in Feb,19.
Responsibility:
1. Follow-up for the call letter with the Discom for stage wise inspection.
2. Meeting the Incharge of Discom Project Division for IPDS works and collect the required related documents
to the scope of works before starting the inspection ie, LOA,MQP,FQP,PO,GTP,Drawing,MIR,Circle wise in-
charge details etc.
3. Plan the resources for carrying out the inspection.
4. Inform the in-charge of the utility of each circle to confirm the date of inspection.
5. Collect the town-wise completed quantity from the utility of each circle.
6. Plan with utility of each circle and carryout the inspection in respective circle.
7. Defect observed during inspections are recorded with photographs.
8. Preparation of reports as per specified format and forwarded to our HO for finalisation for submission to PFC.
9. Regular meetings with CMD/DT/CGM/GM of Discom.
10. Submission of weekly reports, monthly reports & Annual Reports
From July 2018 to September 2018 : WAPCOS Ltd(A Government of India Undertaking)
Chennai,Tamil Nadu,India
Role:- Project In-Charge for APSPDCL (ie,Andra Pradesh,Southern Region) covering Eight Circles for carrying out the
Third Party Concurrent Evaluation Agency(TPCEA) inspection for the Semi-Turnkey Projects under IPDS awarded by
Power Finance Corporation
Three Stages inspections to be carried out for the IPDS projects on intimation by the utilities. Following activities to
be carried out: Completed the 1st stage TPCEA inspection in July,18
Scope of Work to be inspected
1) New 33/11KV Substation
2) Additional / Enhancement of Power Transformers
3) New 33KV / 11KV Feeder / LT Line
4) Re-conductoring of 33KV / 11KV/ LT Lines
5) Ariel Bundled cables
6) New Distribution Transformers & Enhancement for capacity of DTR
7) Feeder / DTR / Consumers Meters
8) Solar Panels
Responsibility:
1. Follow-up for the call letter with the Discom for stage wise inspection.
2. Meeting the Incharge of Discom Project Division for IPDS works and collect the required related documents
to the scope of works before starting the inspection ie, LOA,MQP,FQP,PO,GTP,Drawing,MIR,Circle wise in-
charge details etc.
3. Plan the resources for carrying out the inspection.
4. Inform the in-charge of the utility of each circle to confirm the date of inspection.
5. Collect the town-wise completed quantity from the utility of each circle.
6. Plan with utility of each circle and carryout the inspection in respective circle.
7. Defect observed during inspections are recorded with photographs.
8. Preparation of reports as per specified format and forwarded to our HO for finalisation for submission to PFC.
9. Regular meetings with CMD/DT/CGM/GM of Discom.
10. Submission of weekly reports, monthly reports & Annual Reports
Studying the MEP IFC drawings issued by Client/Consultant and any Technical query are raised in form of
RFI/CVI for Client/Consultant approval and cost implication will be submitted.
Reviewing and Finalising the MEP programme in coordination with the Main Contractor Planning Team.
Reviewing,forwarding and obtaining approvals of all Material Approval Sheet,Method Statement and shop
drawings submitted by MEP Contractor‘s & other specialist contractors(Lift,BMS,ELV system,IT network
etc) from Client/Consultant.
Compliance statement is made for all approved with comments MEP documents for regularisation.
Arranging Site office and store space for the MEP Contractor’s through the Main Contractor as per the
contract.
Organising HSE induction through Main Contractor HSE team to explain the HSE policy for MEP Staff,
worker and other specialist contractor’s before executing the MEP works at site.
Follow and make arrangement with MEP Contractor’s to mobilise their staff, Technicians and store keeper at
site as per the Manpower histogram.
Follow and organise MEP Materials are ordered and the same are reaching the site in time for smooth
functioning of the project in line with the programme.
All MEP materials delivered at site are inspected by submission of Material Inspection Request form enclosed
with all relevant documents as per the approval MAS. Each material’s will be checked as per approval and
also for proper stacking/protection and easy access. After inspection the document will be forwarded to
Client/Consultant for approval.
Factory inspection are made for the local Manufacturer of HV/LV Panels and Materials received from outside
country will have the Factory test certificate which will be attached along with MIR.
Coordinate with Main Contractor for the sequencing of concrete pouring for organising the materials required
for the first fix installation in line with the approved working drawing and as per QA/QC check list
documents.
Submission of Daily Manpower Report of MEP Contractor’s which will be complied with Main Contractor
report and will be submitted to Client/Consultant.
Each MEP installation activities are inspected while installation in progress and after completion Inspection
Request is raised for each MEP activities for inspection and approval are obtained from Client/Consultant.
If, any installation are not carried out as per approved shop drawings and not brought notice NCR will be
issued to rectify the same.
Organise Weekly Internal meeting with MEP Contractor’s and Main Contractors to discuss the site related
issue and remedy action are taken immediately. If, any technical issue these will be brought notice to
Client/Consultant for approval.
Timely Submission of MEP progress reports which will be complied with Main Contractors progress report
and will be submitted to Client/Consultant before the progress review meeting.
Attending to Client/Consultant progress review meeting on Bi-monthly to discuss the progress of works,
Approval Status, Manpower, Technical issues.
Follow with the MEP Contractors and submit the monthly progress billing as per the material delivery and
work done at site which will checked by Main contractor QS team before submission to Client/Consultant.
Coordinating with other Specialist contractors i.e., false ceiling, Joinery, Marble etc. to ensure that there is no
any discrepancy / clashing with MEP works.
Auditing are conducted every three months by Main Contractor to check all the MEP documents, Stores &
Instruments (calibration certificate) are properly in place. If, any discrepancy NCR will be issued.
Follow and Obtain Authority approvals from Muncipality, Ministry of Electricity, Water and Telecom for
functioning and handing over of the project.
Approval will be obtained for the MEP equipment’s/Installation Spare parts list before placing order.
Final inspection is raised by the MEP contractor’s after completion of all MEP works inspected and
forwarded for Consultant/Client approval.
Final fixtures will be installed after completion of Final painting, marble polishing etc.
Organising for Testing & Commissioning of MEP Equipment’s through the specialist.
Preparing the final snags along with Consultant for MEP works and forwarded to MEP contractors for
rectification and re-submission for inspection.
Organising for demonstration of MEP Equipment’s to Maintenance personnel for Handing over of the
systems.
Reviewing and forwarding of As-built drawings, O&M Manuals and spare parts list for Consultant/Client
final approval.
After approval, Final sets submissions of O&M Manuals, As-built drawings and spare parts are handed over
to Consultant/Client and same will be handed over to End-User for availing the completion certificate.
PROJECT’S HANDLED:
S.No. Projects MEP Client Designation Project
Value Completion
(OMR)
1 My City Centre Sur- Majid Al Futtaim, Sultanate of Oman:- 4.2millio Majid Al MEP On-going
Jan 2017 to Nov 2017(LEED Project) n Futtaim Co-ordinator
3x400ton Aircooled Chiller/CHW pumps/AHU’s with
ducting /Chilled water pipng /4x2000kva transformer/LV
Panels/ELV Systems/Fire –fighting system/cold water supply
system/Drainage system/Rain water system/Final fixing of MEP
items
2 Royal Opera House,Muscat,Sultanate of Oman:- June 2016 6million Royal Court MEP On-going
to Jan2017 Affairs-The Co-ordinator
3x300ton Aircooled Chiller/CHW pumps/AHU’s with Palace
ducting/Chilled water piping/2x2000kva transformer/LV
Panels/ELV Systems/Fire –fighting system/cold water supply
system/Drainage system/Rain water system/Final fixing of MEP
items
3 Sultan Qaboos Mosque,Sohar,Sultanate of Oman:- Feb 2013 4million Royal Court MEP Completed
to June 2016 Affairs-The Co-ordinator
Roof top Aircooled system with AHU with refrigerant Palace
piping/VRV system/Roof top package units/Split units/CHW
pumps/AHU’s with ducting/5x1000kva transformer/LV
Panels/ELV Systems/Fire –fighting system/cold water supply
system/Drainage system/Rain water system/Final fixing of MEP
items
4 VVIP Office,Royal Dining & Associates Building at Bait 3million Royal Court MEP Completed
Bahjat Al Andaar, Sohar,Sultanate of Oman:-Nov 2011 to Affairs-The Co-ordinator
Jan 2013 Palace
Low side works(CHP,Ducting,Ventilation system)/AHU’s/LV
Panels/ELV Systems/Fire –fighting system/cold water supply
system/Drainage system/Rain water system/Final fixing of MEP
items
5 New Library & New Guest Residence at His’n Al Shumookh 2million Royal Court MEP Completed
and Royal Oman Police-Nizwa,Sultanate of Oman:- April Affairs-The Co-ordinator
2010 to Nov 2011 Palace
Low side works(CHP,Ducting,Ventilation system)/AHU’s/LV
Panels/ELV Systems/Fire –fighting system/cold water supply
system/Drainage system/Rain water system/Final fixing of MEP
items
6 Royal Philharmonic Orchestra- Bait Al Barka,Sultante of 3million Royal Court HVAC Completed
Oman:- Sep 2009 to April 2010 Affairs-The Co-ordinator
3x350ton Aircooled Chiller/CHW pumps/AHU’s with Palace
ducting /Chilled water pipng /3x1000kva transformer/LV
Panels/ELV Systems/Fire –fighting system/cold water supply
system/Drainage system/Rain water system/Final fixing of MEP
items
7 Villa No.2 Palace at Bait Al Mamurah,Salalah,Sultanate of 6million Royal Court HVAC Completed
Oman:- Oct 2007 to Sep 2009 Affairs-The Co-ordinator
2x800ton Watercooled Chiller/CHW pumps/AHU’s with Palace
ducting /Chilled water pipng /6x1000kva transformer/LV
Panels/ELV Systems/Fire –fighting system/cold water supply
system/Drainage system/Rain water system/Final fixing of MEP
items
From Nov 2006 to Jul 2007 : Genetco (Towell Group)
Muscat, The Sultanate of Oman
FIELD & WORK SHOP ACTIVITIES (Air-conditioning / Home Appliances & Electronics)
Jun 2001 – Aug 2006 Oman Trading Establishment (Sheikh Suhail Bahwan Group)
Muscat, The Sultanate of Oman
FIELD & WORK SHOP ACTIVITIES (Air-conditioning / Home Appliances & Electronics)
a) Detail engineering of complete Projects, Bill of Quantity, Selection & Scheduling of Equipments, Selection
& finalization of bought out items and Accessories etc.
b) Negotiation and finalization of Vendors & Contractors for Project Works.
c) Follow-up and co-ordination with Consultant, Architect and Main contractor on Approvals of Drawings for
fast completion of project.
d) Review, Monitor and Control of Project schedule with our contractors on progress, Quality and Safety.
e) Commissioning Report will be made for each project after testing, Air balancing & temperature reading as
per agreement.
f) Processing of contractors and vendors payments after verification.
g) Developing new dealers, new contractors and vendors.
h) Preparing cost variance report for each project.
i) Collecting cuss at letters from customers after completion of each project.
j) Highest Achieved Annual Billing Target of Rs 2.2 crore on completion of projects.
k)
List of Major Customers in Kerala :
Successfully Supplied, Installed, Tested and Handed Over of Major prestigious projects like
Bhima Jewellery,All India Radio,City Centre(Trichur),Federal banks,Tom Nicholson(NRI)
Villa,P&T, Cochin Stock Exchange,Liesie Hospital,Allapatt Jewellery,Josco Jewellery,Allukkas
Jewellery,MES-CE(NAVY).
From Dec 91- June 1995: Aercool Services Pvt Ltd, Chennai, India
(Authorized Dealer for VOLTAS LTD)
a) Generating sales enquiry and finalizing the sale deal with customer.
b) Design, Detail Engineering of complete Projects, Bill of Quantity, Selection & Scheduling of Equipments,
Selection & finalization of bought out items and Accessories etc.
c) Planning, Preparation of Detail Project Completion Schedule will be submitted to Consultant, Architect and
Main contractors for their approval.
d) Ordering of machines with our principles for timely delivery.
e) Negotiation and finalization of Vendors & Contractors for Project Works.
f) Review, Monitor and Control of Project schedule with our contractors on progress, Quality and Safety.
g) Commissioning Report will be made for each project after testing, Air balancing & temperature reading as
per agreement.
h) Processing of contractors and vendors payments after verification.
i) Collecting cuss at letters from customers.
j) Achieved yearly target set by our principle.