100% found this document useful (1 vote)
393 views2 pages

Icl 009 PLC Panel

This 2-page document provides a checklist for inspecting the installation of a PLC panel. The checklist contains 27 items to check, including verifying that the panel is installed according to approved drawings and specifications, cables are routed and labeled correctly, electrical connections are properly terminated and marked, adequate clearances are provided, the enclosure is sealed and cleaned, and earthing is done as per the approved layout. Spaces are provided to note observations and remarks for each check. The document also includes spaces for the subcontractor and Sterling & Wilson representative to sign off on the inspection.

Uploaded by

samwel kariuki
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
393 views2 pages

Icl 009 PLC Panel

This 2-page document provides a checklist for inspecting the installation of a PLC panel. The checklist contains 27 items to check, including verifying that the panel is installed according to approved drawings and specifications, cables are routed and labeled correctly, electrical connections are properly terminated and marked, adequate clearances are provided, the enclosure is sealed and cleaned, and earthing is done as per the approved layout. Spaces are provided to note observations and remarks for each check. The document also includes spaces for the subcontractor and Sterling & Wilson representative to sign off on the inspection.

Uploaded by

samwel kariuki
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Document No.

:
STERLING AND INSTALLATION CHECKLIST FOR
SW-SEPC-ICL-PLC-068A, Rev: 00
WILSON PLC PANEL
PROJECT NAME & LOCATION:

Drawing / Specification No.:


Site Location / Area: Inspection Date:

OBSERVATIONS
SR. NO. CHECKS REMARKS
YES NO
Check PLC Panel & Make as per approved drawings /
1
specifications
2 Check for physical damage of equipment
Panel installed at correct location & identified with
3
labels as per drawings/SLD
4 Check proper grouting & coupling of panel
Check for correct position & alignment of PLC panel as
5
per SLD/drawings
Cables installed should be of correct type and routed in
6
correct section as per drawing / SLD
Check the cable bending radius strictly as per
8
Specifications (Avoid sharp cable bends)
Cables protected & secured from physical damage and
9
at all sharp edges
Busbars, Cable terminations tightened as per
11 manufacturer torque specifications (Using Nut-bolt &
spring washers)
Electrical connections/terminations should be clearly
12
marked as per SLD/drawing
Cables correctly labeled as per drawing/specifications
14
Check for the adequate clearance in between busbars
15
as per drawing/Panel layout
Check for partition provided between the panel
16
compartments
17 Check for the continuity of the cables
Check the hume pipe bends used are uniform & free
20
from kinks
Check that proper pipe fittings used (i.e. Rain Tight at
21
wet locations) and adequately tightened
Check that hume pipe ends are closed & sealed as per
22
specifications
Enclosure should be sealed to cover any openings or
23
leaks observed
24 Enclosure cleaned out & vacuumed
25 Touch up painting applied if required
26 Labels installed on enclosure as per drawing
Panel earthing done as per approved earthing layout
27

Page 1 of 2
Document No.:
STERLING AND INSTALLATION CHECKLIST FOR
SW-SEPC-ICL-PLC-068A, Rev: 00
WILSON PLC PANEL
PROJECT NAME & LOCATION:

Drawing / Specification No.:


Site Location / Area: Inspection Date:

OBSERVATIONS
SR. NO. CHECKS REMARKS
YES NO
COMMENTS/REMARKS:

Checked By Subcontractor: Witnessed By S&W:


(Date & Sign) (Date & Sign)

Page 2 of 2