4na - Assembly & Disassembly - Flypartsguy - Com - 1.2019
4na - Assembly & Disassembly - Flypartsguy - Com - 1.2019
4na - Assembly & Disassembly - Flypartsguy - Com - 1.2019
www.FlyPartsGuy.com
Purpose
This manual is intended to inform customers on how to assemble and disassemble the Weichai
America 4 Liters naturally aspirated engine. This document will be provided to customer so they
can incorporate this information into their manuals and service documents.
Maintenance Providers
Maintenance and repair services may be performed by you or any qualified engine service
provider that you choose. However, your engine warranty does not cover damage or failure
caused by improper maintenance or repairs.
Store this Owner’s Manual and Maintenance Records in a safe, visible place by your engine.
The maintenance log must be updated whenever your engine is serviced. If repairs are being
done under warranty be sure to follow proper warranty procedures. (see Weichai America Corp
Warranty Procedure Manual)
Contents
1 Disassembly & Assembly of Engine ..................................................................................... 5
1.1 Safety Precautions............................................................................................................ 5
1.2 Environmental Protection Measures ................................................................................. 5
1.3 Notes for Disassembly and Assembly of Engine ............................................................... 5
2 Engine block group .............................................................................................................. 6
2.1 Engine block group assembly and disassembly ................................................................ 6
2.2 Engine block assembly and disassembly .......................................................................... 9
2.3 Gear housing group assembly and disassembly ............................................................. 12
2.4 Piston nozzle assembly and disassembly ....................................................................... 15
2.5 Thrust plate assembly and disassembly ......................................................................... 16
2.6 Front & rear oil seal assembly and disassembly ............................................................. 17
2.7 Flywheel housing assembly and disassembly ................................................................. 19
2.8 oil pan assembly and disassembly .................................................................................. 21
2.9 Cylinder head assembly and disassembly ...................................................................... 23
2.10 valve cover assembly and disassembly ................................................................ 27
2.11 Lifting lug assembly and disassembly ................................................................... 28
2.12 CCV system assembly and disassembly .............................................................. 29
2.13 CCV breather assembly and disassembly .............................................................. 2
3 Crank-rod mechanism.......................................................................................................... 3
3.1 Crank-rod mechanism assembly and disassembly ........................................................... 3
3.2 Crankshaft group assembly and disassembly ................................................................... 4
3.3 Main bearing assembly and disassembly .......................................................................... 6
3.4 Balance mechanism assembly and disassembly .............................................................. 7
3.5 flywheel and gear assembly and disassembly ................................................................ 10
3.6 Piston-rod group assembly and disassembly .................................................................. 11
3.7 Damper, crankshaft pulley and hub assembly and disassembly ..................................... 14
4 Timing mechanism ............................................................................................................. 16
Please strictly comply with instructions in this manual to safely and properly disassemble and
assemble the engine.
Please comply with relevant laws and regulations on environmental protection when handling oil
and hydrocarbon waste. For further instructions please contact your local officials.
Failure in complying with safety regulations and basic safety practices causes the majority of
engine-related accidents. Proper training is required for all engine operators and maintenance
personnel. Any violation of instructions in this manual may result in serious injury or death.
Note: Before proceeding with any maintenance or repair operation, place a sign clearly
stating “Maintenance In Progress, Do Not Use” on the engine starter switch.
Take the following precautions before using a lockout tool and beginning maintenance or repair:
• Ensure the maintenance site and surrounding area are clean and suitable for safe operation.
• Remove any rings, necklaces, watches, or other jewelry and wear appropriate close-fit work
clothes before entering the maintenance site.
• Wear relevant protective devices (goggles, gloves, shoes, masks, work clothes, helmet, etc.)
that are in good condition prior to entering the maintenance site.
1) Apply oil on connecting area and thread of cylinder head bolt, then tightening them as below:
The figure below shows the tightening sequence of cylinder head bolt in every cylinder head.
Key point 2:
Inspection:
Note that protrusion of cylinder sleeve is average value of X direction and Y direction; and the
measurement should be done without seal rings. Cylinder sleeve for the same engine should be
uniform.
2) No corrosion, scratch and crash damage is allowed for fitting surface and friction surface, wipe
them out and apply clean lubricating oil or grease before assembling.
Assembly:
Place cylinder sleeve vertically on engine block, install seal rings on the sleeve and engine block and
then assemble the sleeve, knock it to the right place evenly with nylon rod.
Key point 3:
Disassembly:
8
Use dedicated tool to disassemble the camshaft sleeve, and try to protect other sleeves during
disassembling.
Inspection:
Before assembling, grease on sleeve back, bush surface and fitting hole inner surface must be wiped
out, and make sure there is no burr, overlap and scrap iron.
Assembly:
Apply oil on engine block hole, put camshaft sleeve into the dedicated tool and guide it into engine
block, in the meantime align oil gallery holes on the sleeve and engine block.
Inspection:
Check and clean engine block. Including but not limited to: Assembly environment must be clean;
check engine block finished surfaces for crash damage, scratch and rust; do not bump and scratch the
parts during assembling, and besides special requirements, sharp corner and edge on parts must be
smoothed.
Installation:
For 4-cylinder engine, 10 of M14-10.9 main bearing bolts are used to fix the bearings. As shown in
Fig. below, tighten from the middle bolts, and then move to two ends alternately, follow the procedures
below: pre-tighten each bolt to 70Nm, then turn the bolts for further 90°±4°.
10
Install the thrust bearing cap on rear end of engine block, and the others are non-thrust bearing caps.
Take the cap two ends as locating basis when assembling; the main bearing bolts cannot be screwed on
if the cap is inversely placed.
11
Key point 1:
12
Inspection:
Check the gear housing to ensure that it is clean and without any damage or burrs on the fitting surface.
Check the O-Rings to ensure that they are in good condition. Replace the O-Rings if necessary.
Assembling:
1) Knock the locating pins into place, as shown in the figure below;
2) Apply sealant on the sealing surface of the Gear Housing. Ensure that the sealant is evenly
distributed and continuous.
3) Place the gear housing with alignment pins in the pin holes. Knock the cover edge gently with
a nylon rod such that the cover and engine block can fit together closely.
13
4) Place the bolts with gaskets in their corresponding holes. Tighten them with a pneumatic
impact wrench and an open-end wrench.
Key Point 2:
Assembly:
Oil seals and seal rings should be checked before assembling. Ensure there is no damage or
dirt. For a tight seal, apply some clean engine oil on the shaft first, and then press the seal in
slowly with the dedicated tool, ensuring that the pressing force is evenly distributed on the
seal.
Disassembly:
14
The removed oil seal can not be reused; replace it with a new one.
1) Compress nozzle module tightly with bolt (with spring washer) and pressing plate;
2) Place the pressing plate in nozzle end face groove.
3) Tighten bolt.
15
Check O-shape seal ring for damage; make sure the nozzle is clean and free of burr.
Thrust plate should be used in pairs and the side with oil groove should be outward during assembling.
Put the anti-misloading lug in corresponding groove of thrust bearing cap.
17
Inspection:
Check whether the junction surface between rear oil seal cover and engine body is cleaning or
knocking wound.
Assembly:
1) Clean the junction surface and install 2 pins into engine body.
2) Apply sealant on the junction surface of rear oil seal cover.
3) Apply oil on surface of crankshaft flange, assemble rear oil seal and tighten bolt. Bolt
tightening sequence is: 1-2-6-7-3-4-5-8-9-10。
Key point 2:
Inspection:
Oil seals and seal rings should be checked before assembling, make sure there is no damage. Check
whether rear oil seal cover is clean and whether its finished surface is free of obvious scratch.
18
Assembly:
Apply sealant on the rear oil seal outer ring first, and then press-in the seal slowly with dedicated tool.
NOTICE: Do not damage the seal during assembling, and seal outer ring should be parallel and level to
oil seal cap plane.
Assembly
Check whether flywheel is cleaned up. Debur the corresponding fitting surface on engine block with
240# fine oil stone and clean the surface with ethyl alcohol. Apply sealant on fitting surfaces of
flywheel housing and engine block. Bolts and tools: M10-10.9 hexagon bolts (×12), M12-10.9 hexagon
bolts (×6), 17mm and 19mm socket spanner.
Step 2: Follow the sequence of arrow to tighten the M10 bolts, tighten torque for M10 bolts is
80~85Nm. And then tighten the M12 bolts according to the marked order 1-2-3-4-5-6, tighten torque
for M12 bolts is 140~145Nm.
20
NOTICE: For the strengthening bolts listed above, the thread and bearing surface of each bolt should
be applied with lubricating oil before assembling.
21
22
Before the disassembling, all engine oil should be drained out. Put an engine oil container under drain
screw plug of oil sump, screw off the plug with a plug wrench to drain oil out.
Key point 2:
Assembling
1) Apply sealant on fitting surface of engine block and partially apply sealant on oil sump, place
sealing gasket on the fitting surface.
2) Lift and place oil sump, be careful and avoid crashing the fitting surface.
3) Place bolts and gaskets, and tighten the bolts with pneumatic impact wrench to 20~35.5Nm.
23
Assembling
1) Refer to Figure 9-5 for the bolt pre-tightening and tightening order for each individual cylinder
head. The cylinder heads should be tightened in the order 3-2-4-1.
24
2) The cylinder head bolt will stretch and deform between 0.2~0.6mm after tightening. The bolt
can’t be reuse if the length over 160.5mm.
3) Install the valve oil seal.
Key point 2:
Inspection
Clean the cylinder head, focusing on the combustion chamber surface, valve seat, intake and exhaust
valves, and intake and exhaust passages. Remove the carbon deposits and mucilage glue, and check the
surface condition.
Appearance Inspection:
Check the cylinder cover for any discoloration or cracks. If any cracks are discovered, a leak test
should be done.
25
1. Valve Recession:
Valve recession is the vertical distance between valve undersurface and cylinder cover
undersurface. Any difference between the measured and required values of valve recession
can reflect the degree of wear on the valve and valve seat. A depth micrometer can be used to
measure valve recession, as shown in Figure below:
Reference Table below for valve recession requirements. If valve recession exceeds the allowed range,
the cylinder cover must be replaced to ensure engine reliability. If valve recession doesn’t exceed
allowed range, disassemble the valve and check the sealing surface between the valve and valve seat
for wear and abnormal damage.
27
Valve cover gaskets are disposable and should be replaced during maintenance.
1) Check the covers for any cracks or other damage. Replace if damaged.
2) If there is leakage through the valve cover gaskets, then all gaskets should be checked and replaced.
28
29
1) Check the breather system appearance for any parts that are damaged or flawed. Replace the
damaged or flawed parts.
2) Check for any oil leakage in the system.
3) Check for proper air flow by blowing air into the CCV breather. If resistance is high, clean the
breather element. If the problem persists, replace the breather element.
3 Crank-rod mechanism
caution to avoid jamming cylinder block with connecting rod tip. Remover other pistons in the
same way, number and place them orderly.
2) Screw off fastening bolts of torque vibration damper and fastening bolts of hub, take down
crankshaft pulley, torque vibration damper and hub.
3) Screw off flywheel bolts, take down flywheel assembly, bearing, etc.
2) Take down crankshaft and flywheel, remove front and rear thrust plates and flywheel bearing.
Remove oil seals; place the crankshaft on bracket (for long time storage, the crankshaft should
be placed vertical);
3) Classify the removed parts according to the requirements
a: The bearing shell should be strictly inspected for bump damage before assembling, and shell with
bump damage should not be reused even if repaired.
b: The assembled upper bearing shell should be aligned to oil hole and oil groove on cylinder body,
misalignment exceeds 1/5~1/4 of oil hole is strictly forbidden. The assembled upper bearing shell
should be closely fit with cylinder bottom holes.
10) Apply clean lubricating oil on crankcase bolt bearing surface and main bearing bolt thread.
Place main bearing bolts and pre-tighten them according to the order shown in Figure below.
Firstly pre-tighten to 70Nm, and then tighten each bolt for another 90°±4°. Assembly of crank
shaft is finished.
2) Check and ensure there is no peeling, locating lip damage and transverse crack on the shell.
4) Rotate the gear on the balance mechanism until the gear tooth with “0” marked arrive at the
location which is pointed by red circle on following figure, then mark this gear tooth’s crest and
flank by marking pen.
5) Install balance mechanism, insure that the gear teeth with “0” marked on crankshaft gear and
balance mechanism gear engage.
6) Install bolts, pay attention on distinguish bolt’s length, do not install bolts in wrong location, and
note that there is no washer.
7) Tighten bolts and measure the gear clearance.
Note: The gear clearance should be between 0.3mm to 0.4mm. Remove balance mechanism and
change quantity of adjusting shims on each side if the clearance is less than 0.3mm or greater than
0.4mm, replace complete balance mechanism if adjustment doesn’t work. The max quantity of shims
on each side is 5 pieces.
8) Tighten bolts after clearance adjustment is completed. The torque of bolt (4Xm10) is (35+5)
N·m.
10
Flywheel bolts:
Bolt specification M16-12.9 (×6); Tightening torque: 285~295Nm; Test value: 285~340Nm.
3.5.4 inspection and maintenance of flywheel and gear
1) Check whether there is failure like thread damage on flywheel bolts.
2) Check flywheel surface for conquassation.
3) Check whether flywheel ring gear is damaged.
11
12
4) Clean up cylinder inner wall, crankshaft connecting lever and piston-rod assembly, and apply
clean lubricating oil on each motion pair.
5) Adjust opening direction of each ring: The opening direction of first compression ring should
be 30° to piston pin center line, opening direction of the second compression ring should be
120° to that of the first compression ring, and opening direction of oil ring should be 120° to
both that of first compression ring and second compression ring, also should be perpendicular
to piston pin center line. As shown in Figure below.
6) Rotate the flywheel with external force until cylinder 1, 6 get to BDC, install thrust plates of
cylinder 1 and 6, and screw on connecting rod bolts. Rod parting surface should face left side of
cylinder block (i.e. engine oil cooler side). The numbered pistons should not be mixed, install
each piston to the corresponding cylinder; connecting rod cap and connecting rod should be
used in pairs, apply clean lubricating oil on connecting rod bolts before assembling.
7) Tighten connecting rod bolts: Firstly tighten the bolts to 30Nm in symmetry, and then tighten
each bolts for another 120±5°, in the meantime tighten torque should be up to 67~107Nm.
Assemble other piston-rods in the same way.
13
1) Fasten the hub to crankshaft with the hub fastening bolts and tighten.
2) Torque the hub fastening bolts:
Bolt specification M16-12.9 (×4);
Tightening torque: 300~310Nm;
Test value: 300~360Nm.
3) Fasten the torque vibration damper and crankshaft pulley to the hub with the damper fastening
bolts and tighten.
4) Torque vibration damper fastening bolts:
Bolt specification M10-10.9 (×6);
15
4 Timing mechanism
16
17
1) Check camshaft for blur and bump damage, and make sure there is no rust, scratch and scrap
iron.
2) Apply clean engine oil on camshaft hole and tappet hole inner surface. Install camshaft, do not
damage camshaft surface and engine block hole during the push-in process of camshaft and the
push-in strength should be equally, the end with thread should be on gear housing side.
3) Install sector plate, tightening torque of bolts should be 35±10Nm, seal up the bolts with
lacquer.
4) Install gaskets, flange, washers and hexagon bolts on camshaft threaded end. Measure the axial
clearance of camshaft, which should be 0.1~0.29mm, if the clearance is too small, check
whether there is burr between camshaft and sector plate. If fail to adjust the clearance to
required range after deburring, then the camshaft should be replaced.
5) Rotate the crankshaft until 0 tick on timing gear is closest to camshaft, install camshaft timing
gear, make sure 0 tick of timing gear is engaged with 0 tick of crankshaft gear;
18
6) After correctly installed the gears, mark 0 tick position of camshaft timing gear and crankshaft
timing gear with a marking pen.
7) After adjusting the holes, install camshaft bolts (cleaned and applied with KB277 sealant)
through flanges holes; pre-tighten camshaft timing gear fixing bolts with pneumatic impact
wrench, and pre-tighten connecting bolts between camshaft timing gear and fuel injection pump
driven gear. Tighten the bolts with torque spanner, tightening torque for M10 bolts: 85~90Nm,
tightening torque for M8 bolts: 55~60.5Nm, seal up the bolts with lacquer after tightening
19
20
21
5) Apply clean lubricating oil on the pushrod and ensure that the round head is applied with
sufficient oil.
6) Install the pushrod by putting the pushrod into the valve tappet through the cylinder cover.
4.4.4 inspection and maintenance of tappet and push rod
1) Clean the valve tappet and pushrod.
2) Ensure that the oil channels of valve tappet and pushrod are smooth.
3) Ensure that the pushrod is not crooked. Check wear condition on the outside surface.
4) Ensure that the two ends of the pushrod are not worn.
5) Ensure that the valve tappet surface and undersurface are not worn.
6) Ensure that the valve tappet inner socket head is not worn.
22
23
24
25
26
27
28
29
1 Gasket 4 Bolt
2 Exhaust manifold 5 Gasket
3 Nut 6 Stud
Note: the recommended tightening torque of exhaust manifold bolt is 65N·m~80N·m and do not
reuse this bolt more than twice.
30
31
Note: the recommended tightening torque of exhaust manifold bolt is 65N·m~80N·m and do
not reuse this bolt more than twice.
32
6 Ignition system
34
35
36
7 Fuel system
37
4) Remove fitting bolts and shock pads to remove LPG evaporator from its bracket.
5) Remove shut-off valve from LPG evaporator.
6) Remove all connectors and plugs on the evaporator.
39
2) Remove the bolts and nuts bolting the NG bracket to the NG shut-off valve. Remove the NG
shut-off valve.
7.3.3 Steps to assemble NG shut-off valve
Reverse disassembly procedure to assemble NG shut-off valve.
40
41
42
8 Cooling system
43
44
45
3) Check water pump and middle cushion block for cracks. Replace them if necessary.
9 Lubricating system
47
48
49
50
3 O-ring 7 Nut
4 Oil pipe 8 Washer
52
10 Starting system
The starter is the core component of the starting system. The starter converts battery power to
electromagnetic torque. The ring gear mechanism drives the starting engine rotation. The starter motor’s
main components are the DC motor, one-way clutch, reduction gear train, electromagnetic switches, and
the starter relay.
See exploded view of starting system as following:
54
11 Alternator
55
56
12 APPENDIX A
Appendix A: Torsional Torque and Tightening Method for Main Bolts and Nuts
57
13 APPENDIX B
Appendix B: Tolerance Clearance for Main Parts of Gas Engine (Reference value)
58
14 APPENDIX C
Appendix C: The Evaluation Criteria for Main Friction Wear of Gas Engine (Reference value)
59