A102-R4 Software
A102-R4 Software
ß‚ ◊ÊÚ«˜UÿÍ‹/¬¬⁄U ∑§ ŒÊ ÷ʪ „Ò¥– ÷ʪ ∞∑§ ◊¥ øÊ⁄U ¬˝‡Ÿ •ÊÒ⁄U ÷ʪ There are TWO PARTS in this Module/Paper. PART ONE
ŒÊ ◊¥ ¬Ê°ø ¬˝‡Ÿ „Ò¥– contains FOUR questions and PART TWO contains FIVE
questions.
÷ʪ ∞∑§ ““flÒ∑§ÁÀ¬∑§”” ¬˝∑§Ê⁄U ∑§Ê „Ò Á¡‚∑§ ∑ȧ‹ •¥∑§ 40 „Ò ÃÕÊ PART ONE is Objective type and carries 40 Marks.
÷ʪ ŒÊ ““√ÿÁÄì⁄U∑§”” ¬˝∑§Ê⁄U ∑§Ê „Ò •ÊÒ⁄U ß‚∑§ ∑ȧ‹ •¥∑§ 60 „Ò– PART TWO is Subjective type and carries 60 Marks.
÷ʪ ∞∑§ ∑§ ©ûÊ⁄U, ß‚ ¬˝‡Ÿ-¬òÊ ∑§ ‚ÊÕ ŒË ªß¸ •Ê∞◊•Ê⁄U ©ûÊ⁄-U PART ONE is to be answered in the OMR ANSWER
¬ÈÁSÃ∑§Ê ¬⁄U, ©‚◊¥ ÁŒÿ ª∞ •ŸÈŒ‡ÊÊ¥ ∑§ •ŸÈ‚Ê⁄U „Ë ÁŒÿ ¡ÊŸ „Ò¥– SHEET only, supplied with the Question Paper, as per the
÷ʪ ŒÊ ∑§Ë ©ûÊ⁄U-¬ÈÁSÃ∑§Ê ◊¥ ÷ʪ ∞∑§ ∑§ ©ûÊ⁄U Ÿ„Ë¥ ÁŒÿ ¡ÊŸ øÊÁ„∞– instructions contained therein. PART ONE is NOT to be
answered in the answer book for PART TWO.
÷ʪ ∞∑§ ∑§ Á‹∞ •Áœ∑§Ã◊ ‚◊ÿ ‚Ë◊Ê ∞∑§ ÉÊá≈UÊ ÁŸœÊ¸Á⁄Uà ∑§Ë ªß¸ Maximum time allotted for PART ONE is ONE HOUR.
„Ò– ÷ʪ ŒÊ ∑§Ë ©ûÊ⁄U-¬ÈÁSÃ∑§Ê, ÷ʪ ∞∑§ ∑§Ë ©ûÊ⁄U-¬ÈÁSÃ∑§Ê ¡◊Ê Answer book for PART TWO will be supplied at the table
∑§⁄UÊŸ ∑§ ¬‡øÊØ ŒË ¡Ê∞ªË– ÃÕÊÁ¬, ÁŸœÊ¸Á⁄Uà ∞∑§ ÉÊ¥≈U ‚ ¬„‹ when the Answer Sheet for PART ONE is returned.
÷ʪ ∞∑§ ¬Í⁄UÊ ∑§⁄UŸ flÊ‹ ¬⁄UˡÊÊÕ˸ ÷ʪ ∞∑§ ∑§Ë ©ûÊ⁄U-¬ÈÁSÃ∑§Ê ÁŸ⁄UˡÊ∑§ However, Candidates who complete PART ONE earlier
∑§Ê ‚ÊÒ¥¬Ÿ ∑§ ÃÈ⁄¥Uà ’ÊŒ, ÷ʪ ŒÊ ∑§Ë ©ûÊ⁄U-¬ÈÁSÃ∑§Ê ‹ ‚∑§Ã „Ò¥– than one hour, can collect the answer book for PART TWO
immediately after handing over the Answer Sheet for
PART ONE to the Invigilator.
¬⁄UˡÊÊÕ˸, ©¬ÁSÕÁÃ-¬ÁòÊ∑§Ê ¬⁄U „SÃÊˇÊ⁄U Á∑§∞ Á’ŸÊ •ÊÒ⁄U •¬ŸË Candidate cannot leave the examination hall/room
©ûÊ⁄U-¬ÈÁSÃ∑§Ê, ÁŸ⁄UˡÊ∑§ ∑§Ê ‚ÊÒ¬¥ Á’ŸÊ, ¬⁄UˡÊÊ „ÊÚ‹/∑§◊⁄UÊ Ÿ„Ë¥ ¿UÊ« ∏ without signing on the attendance sheet and handing over
‚∑§Ã „Ò–¥ ∞‚Ê Ÿ„Ë¥ ∑§⁄UŸ ¬⁄U, ¬⁄UˡÊÊÕ˸ ∑§Ê ß‚ ◊ÊÚ«U˜ ÿ‹Í /¬¬⁄U ◊¥ his/her Answer Sheet to the invigilator. Failing in doing
so, will amount to disqualification of Candidate in this
•ÿÊÇÿ ÉÊÊÁ·Ã ∑§⁄U ÁŒÿÊ ¡Ê∞ªÊ–
Module/Paper.
¬˝‡Ÿ-¬ÈÁSÃ∑§Ê ∑§Ê πÊ‹Ÿ ∑§ ÁŸŒ¸‡Ê Á◊‹Ÿ ∑§ ¬‡øÊØ ∞fl¥ ©ûÊ⁄U Á‹πŸÊ After receiving the instruction to open the booklet and
•Ê⁄Uê÷ ∑§⁄UŸ ‚ ¬„‹ ©ê◊ËŒflÊ⁄U ¡Ê°ø ∑§⁄U ÿ„ ‚ÈÁŸÁ‡øÃ ∑§⁄U ‹¥ Á∑§ before starting to answer the questions, the candidate should
¬˝‡Ÿ-¬ÈÁSÃ∑§Ê ¬˝àÿ∑§ ŒÎÁc≈U ‚ ‚¥¬Íáʸ „Ò– ensure that the Question Booklet is complete in all respect.
(B) Classes
Page 2 A10.2-R4-01-20
1.8 Who controls the FAST (Facilitated 2. Each statement below is either TRUE or
Application Specification Techniques) FALSE. Choose the most appropriate one
meeting ? and enter your choice in the "OMR"
answer sheet supplied with the question
(A) System Analyst paper, following instructions therein.
(1 x 10)
(B) Scribe
2.1 A systems analyst needs to understand
(C) Facilitator people and the way they work.
1.10 The SRS is said to be consistent if and only 2.6 ISO standards are used to control quality
if : in software.
(B) every requirement stated therein is 2.8 Project Risk affects the Schedule or
one that the software shall meet Resources.
(C) every requirement stated therein is 2.9 The ISO 9000 series of standards is a
verifiable program that can be used for external
quality assurance purposes.
(D) no subset of individual requirements
described in it conflict with each 2.10 Flow charts are best ways to describe test
other logic.
Page 3 A10.2-R4-01-20
3. Match words and phrases in column X with the closest related meaning/ word(s)/phrase(s)
in column Y. Enter your selection in the “OMR” answer sheet supplied with the question
paper, following instructions therein. (1x10)
X Y
L. Project Planning
M. Data object
Page 4 A10.2-R4-01-20
4. Each statement below has a blank space to fit one of the word(s) or phrase(s) in the list
below. Choose the most appropriate option, enter your choice in the "OMR" answer
sheet supplied with the question paper, following instructions therein. (1x10)
Equivalent partitioning
A. CMM B. C. Test case
testing
D. Verification E. Maintenance F. Bugs
M. Developers
4.3 ______________is a software testing technique which divides the application input test
data into each partition at least once of equivalent data from which test cases can be derived.
4.5 A set of inputs, execution preconditions and expected outcomes is known as a_________.
4.6 A project usually has a timeline chart which was developed by_____________.
4.9 Software Testing with real data in real environment is known as_____________.
Page 5 A10.2-R4-01-20
. PART TWO 8. (a) What is the difference between code
inspection and code walkthrough ?
(Answer ANY FOUR questions) Give an example of at least two types
of errors detected during code
inspection and at least two types of
errors detected during code
5. (a) What is Boundary Value Analysis walkthrough ?
& Equivalent Class Partitioning ?
Why Equivalence & Boundary (b) What is the difference between
Value Analysis Testing is
required ? Error, Mistake, Fault, Bug &
Defect ?
(b) What is a test plan ? Discuss a test
(c) Differentiate between Software
plan template and briefly explain
each item in your test plan Development Life Cycle (SDLC) and
template. Software Testing Life Cycle (STLC).
(8+7)
(5+5+5)
Page 6 A10.2-R4-01-20
SPACE FOR ROUGH WORK
Page 7 A10.2-R4-01-20
SPACE FOR ROUGH WORK
Page 8 A10.2-R4-01-20