VERVE RESIDENCES TOWER 1

Inspection and Test Plan

PLUMBING WORKS
(Plumbing & Sanitary Works)

ANGELO P. SALAZAR RINALYN T. MARTINEZ

A First issue
Project-in-charge QA Engineer
Rev. Date Prepared Checked Description

Document Review
Activity Company Name Title Signature Date

Reviewed by MDC Alfeo Levi Gamueda TSD Officer

Reviewed by MDC Rodel S. Castillo Project In-Charge

Reviewed by MDC Ma. Lourdes C. Cagampang QA Opcen Supervisor

Approved by MDC Yunkim P. Tee Area Manager

Makati Development Corporation ITP Number Rev

Plumbing & Sanitary Works Page 1 of 3 W P - I T P - 1 2 9 - - - A


VERVE RESIDENCES TOWER 1
Inspection and Test Plan
By Whom Frequencies
Item Description Inspection or Testing Acceptance Criteria Test Methods QA Records
(/QC) (QC)
Work Activity Submittal
Pre-Construction
Pre-Construction – Shop Drawings
1 Shop Drawings for Review Shop drawings TSD 3 set of shop drawings ACI 315 Check if shop Shop Drawings
reinforcing steel (ACI 315) prior to fabrication and drawings are
installation approved
Pre-Construction – Method Statement
1 Method Statement Prepare Method Statement Field Engineer Per type of work Review Method Statement
(Methodology)
Pre-Construction – Materials

By Whom Frequencies Acceptance


Item Description Inspection or Testing Test Methods QA Records
(/QC) (QC) Criteria
Work In-Progress
Construction – General – Storm Drainage pipe installation
1 QA/QC
Work Request Visual Engineer/Field Per Activity N/A N/A Work Request Work Inspection Request
Engineer
2 QA/QC
Storm Drainage pipe Each type As per Sanitary and Rainn water
Visual Engineer/Field N/A Check
installation Each source specification piping checklist
Engineer
QA/QC
3 As per
Work inspection Request Inspection Engineer/Field Per Activity N/A Check Work Inspection Request
specification
Engineer
Drainage pipe
shall be test by
QA/QC filling water MDC Form
Per Zone
4 Flow test and gravity test Testing Engineer/Field N/A higher than Check FQM MET-010
Per Floor
Engineer testing point, 3 FQM MET-014
meters waiting
15 min.

Makati Development Corporation ITP Number Rev

Plumbing & Sanitary Works Page 2 of 3 W P - I T P - 1 2 9 - - - A


VERVE RESIDENCES TOWER 1
Inspection and Test Plan

Construction – General – Sanitary Waste and vent pipe installation


1
Work Request Work Request Work Request Per Activity N/A Work Request Work Request Work Requests
QA/QC
2 Sanitary waste and vent Each Type As per Sanitary and rainb water
Visual Engineer/Field N/A Check
pipe installation Each source specification piping checklist
Engineer
QA/QC
3 Work Inspection Request Inspection Engineer/Field Per activity N/A N/A Check Work Inspection Request
Engineer
The system
Gravity test (Waste, soil and QA/QC shall hold the
Per zone As per MDC FORM
4 stack) (parking drain stack) Testing Engineer/Field water for a full 1 Check
Per floor specification FQM MET-014
(lateral sewer) Engineer hour, with no
drop of water.
Post-Construction
1 Work Inspection Request Visual Field Engineer

2 General Inspection Inspection Field Engineer


Quality Check
3 NCR Visual/Physical
4 As-Built Survey Survey Report Survey Team

4 Documentation Filing of Records Document


Controller

Makati Development Corporation ITP Number Rev

Plumbing & Sanitary Works Page 3 of 3 W P - I T P - 1 2 9 - - - A