QUESTION 1
Based on management review and problem solving meeting, some of the change areas could include
the following (select 2)
A. Business Priorities
B. Adjustment to Vision
C. Investment guardrails
D. Re-review of business case
Explanation/Reference:
Management review of the risks and impediments occur on day 1 end and the changes could be in
business priorities, vision adjustments, change in scope or realignment of the teams
QUESTION 2
Explanation/Reference:
SAFe has 4 out of box configurations: Essential, Portfolio, Large Solution and Full
QUESTION 3
A. Components
B. Flexible Design sets
C. Interconnections
D. Architecture
E. Flexible specifications
https://www.dumpslink.com/SASM-pdf-dumps.html
Correct Answer: B,E
Explanation/Reference:
Flexible specifications and design sets are the two dimensions that converge on an optimal solution
QUESTION 4
Correct Answer: A
Explanation/Reference:
Cadence limits the batch size to single interval, enforcing discipline and practice of keeping small
batch sizes
QUESTION 5
Late testing is an example of weak collaboration between _________ and _________ (choose 2)
A. Scrum Master
B. Testers
C. Developers
D. Infrastructure team
E. Product owner
Explanation/Reference:
Late testing normally is a result of weak collaboration between developers and testers
QUESTION 6
Which type of anti-patterns is listed here: Order Team has two Product Owners, both working at
50?pacity and at exclusive time zones across US and Australia
A. Planning
B. Retrospectives
https://www.dumpslink.com/SASM-pdf-dumps.html
C. PO and Backlog
D. Demos
E. Commitment
F. Execution
Correct Answer: C
Explanation/Reference:
QUESTION 7
In SAFe Framework in the Spanning Palette, Shared Services has people with specialized skills like
Regulatory and Compliance, Information Architecture
A. TRUE
B. FALSE
Correct Answer: A
Explanation/Reference:
Shared Services teams has people with specialized skills to support teams in SAFe model. They could
be experts in regulatory and compliance, end user training, infrastructure etc
QUESTION 8
In SAFe CALMR Approach for DevOps, when someone is talking about Feature toggles or fix-forward,
they are referring to
A. Lean Flow
B. Automation
C. Measurement
D. Recovery
Correct Answer: D
https://www.dumpslink.com/SASM-pdf-dumps.html
QUESTION 9
Correct Answer: D
Explanation/Reference:
LACE - Lean Agile Centre of Excellence is a team of people who are dedicated to implementing the
SAFe framework across the organization as a guiding coalition
QUESTION 10
As the team demonstrates consistency in delivering value and quality, they can build _______ with
their stakeholders
A. Collaboration
B. Trust
C. Communication
D. Transparency
Correct Answer: B
Explanation/Reference:
QUESTION 11
In SAFe DevOps approach, for Continuous Delivery Pipeline a key enabler is the decoupling of ____
and _____ (choose 2)
A. Release
B. Deployment
C. Testing
D. Exploration
E. Integration
https://www.dumpslink.com/SASM-pdf-dumps.html
Correct Answer: A,B
Explanation/Reference:
Deployment and Release are decoupled. While deployment is ongoing as part of Continuous
Deployment, Release is on-demand as prioritized by business stakeholders
QUESTION 12
Story backlog that does not have stories refined for next iteration and no acceptance criteria defined -
is an anti-pattern related to _____
A. Product Management
B. Scrum Master
C. Team members
D. Product Owner
Correct Answer: D
Explanation/Reference:
QUESTION 13
Some of the commonly used standard Program performance metrics include: #NFR Tests under
Quality
A. TRUE
B. FALSE
Correct Answer: A
Explanation/Reference:
Standard program performance metrics that are commonly used include #NFR Tests
QUESTION 14
In SAFe CALMR Approach for DevOps, when someone is talking about implementing full-stack
telemetry, they are referring to
https://www.dumpslink.com/SASM-pdf-dumps.html
A. Lean Flow
B. Automation
C. Measurement
D. Recovery
Correct Answer: C
Explanation/Reference:
Full-stack telemetry is related to the Measurement, ex: time taken to deploy, or recovery time etc
QUESTION 15
Correct Answer: B
Explanation/Reference:
PO Sync can be facilitated by RTE or Product Manager, and not by Scrum Master
https://www.dumpslink.com/SASM-pdf-dumps.html