JUDUL DOKUMEN
Nomor Dokumen
TABLE OF CONTENTS
1.0 INTRODUCTION.............................................................................................................................................3
Page 2 of 5
PEMBANGUNAN PIPA RUAS TRANSMISI GAS BUMI
CIREBON-SEMARANG
JUDUL DOKUMEN
Nomor Dokumen
1.0 INTRODUCTION
The pipeline system is approximately 238 km, 24-inch onshore pipeline, starting from existing
Gresem Pipeline near Tambak Lorok Semarang to Cirebon Region.
1. Stage 1, feed gas supplied from Gresem will be transported to Kendal and Batang area with
approximately 40 MMSCFD;
2. Stage 2, feed gas supplied from Gresem will be transported to Kendal and Batang area with
additional approximately 40 MMSCFD (Total 80 MMSCFD);
3. Stage 3, feed gas supplied from Gresem Pipeline will be transported to Jawa Barat Region.
Gas supplied increment in stage 3 are as follows:
Page 3 of 5
PEMBANGUNAN PIPA RUAS TRANSMISI GAS BUMI
CIREBON-SEMARANG
JUDUL DOKUMEN
Nomor Dokumen
All units in this document shall use the International System of Units (SI) unless otherwise noted.
All project documents, drawings, instructions, specifications, manuals shall be written in English.
The design life of the FACILITIES and all associated equipment, components and systems is a
minimum 15 years, unless otherwise specified. The design life shall be achievable with minimum
onsite maintenance and maximum availability.
All components which for practical, safety or cost-efficiency reasons are unable to meet the
required design life shall be identified as soon as possible. Their expected service life shall be
informed to COMPANY and provision made in the system design for maintenance to extend
component life or routine change-out.
API RP 14C Recommended Practice for Analysis, Design, Installation and Testing
of Basic Surface System on Offshore Production Platforms
API RP 14E Recommended Practice for Design and Installation of Offshore
Production Platform Piping Systems
API RP 14J Recommended Practice for the Design and Hazard Analysis for
Page 4 of 5
PEMBANGUNAN PIPA RUAS TRANSMISI GAS BUMI
CIREBON-SEMARANG
JUDUL DOKUMEN
Nomor Dokumen
1.7 Abbreviations
COMPANY Bakrie and Brothers Tbk. or its successor or assignees who are
the end user of the facilities.
Page 5 of 5