Welders Performance Qualification Record: Actual Values Range Qualified
Welders Performance Qualification Record: Actual Values Range Qualified
Current DC DC
Yes X
Yes X
Test Result
We certify that the statements in this record are true and correct and that the test weld were prepared, welded and tested in accodance with the requirements of
Section IX ASME Boiler and Pressure Vessel.
Page 1 of 1
QAQC DEPARTMENT Procedure No.: Document Type / Level : FORM / Level 7
Manual: Manual No.: Revision No.: Status: Issued For REVIEW (IFR)
Procedure: Effective Date: (After IFI) Prepared By: QAQC PIC
WELDERS PERFORMANCE
Form Title: QUALIFICATION RECORD Form No.: Doc. Custodian: BEC SECRETARY Approved By: BEC Lead
CPM Construction and General
Work Instruction (WI) Title: WI Ref. No.: Review Frequency: Annual Distribution: PX, BDC, PM, BDM Services, Inc.
Current DC DC
Yes X
Yes X
Test Result
We certify that the statements in this record are true and correct and that the test weld were prepared, welded and tested in accodance with the requirements of
Section IX ASME Boiler and Pressure Vessel.
Page 1 of 1
QAQC DEPARTMENT Procedure No.: Document Type / Level : FORM / Level 7
Manual: Manual No.: Revision No.: Status: Issued For REVIEW (IFR)
Procedure: Effective Date: (After IFI) Prepared By: QAQC PIC
WELDERS PERFORMANCE
Form Title: QUALIFICATION RECORD Form No.: Doc. Custodian: BEC SECRETARY Approved By: BEC Lead
CPM Construction and General
Work Instruction (WI) Title: WI Ref. No.: Review Frequency: Annual Distribution: PX, BDC, PM, BDM Services, Inc.
Current DC DC
Yes X
Yes X
Test Result
We certify that the statements in this record are true and correct and that the test weld were prepared, welded and tested in accodance with the requirements of
Section IX ASME Boiler and Pressure Vessel.
Page 1 of 1
QAQC DEPARTMENT Procedure No.: Document Type / Level : FORM / Level 7
Manual: Manual No.: Revision No.: Status: Issued For REVIEW (IFR)
Procedure: Effective Date: (After IFI) Prepared By: QAQC PIC
WELDERS PERFORMANCE
Form Title: QUALIFICATION RECORD Form No.: Doc. Custodian: BEC SECRETARY Approved By: BEC Lead
CPM Construction and General
Work Instruction (WI) Title: WI Ref. No.: Review Frequency: Annual Distribution: PX, BDC, PM, BDM Services, Inc.
Current DC DC
Yes X
Yes X
Test Result
We certify that the statements in this record are true and correct and that the test weld were prepared, welded and tested in accodance with the requirements of
Section IX ASME Boiler and Pressure Vessel.
Page 1 of 1
QAQC DEPARTMENT Procedure No.: Document Type / Level : FORM / Level 7
Manual: Manual No.: Revision No.: Status: Issued For REVIEW (IFR)
Procedure: Effective Date: (After IFI) Prepared By: QAQC PIC
WELDERS PERFORMANCE
Form Title: QUALIFICATION RECORD Form No.: Doc. Custodian: BEC SECRETARY Approved By: BEC Lead
CPM Construction and General
Work Instruction (WI) Title: WI Ref. No.: Review Frequency: Annual Distribution: PX, BDC, PM, BDM Services, Inc.
Current DC DC
Yes X
Yes X
Test Result
We certify that the statements in this record are true and correct and that the test weld were prepared, welded and tested in accodance with the requirements of
Section IX ASME Boiler and Pressure Vessel.
Page 1 of 1
QAQC DEPARTMENT Procedure No.: Document Type / Level : FORM / Level 7
Manual: Manual No.: Revision No.: Status: Issued For REVIEW (IFR)
Procedure: Effective Date: (After IFI) Prepared By: QAQC PIC
WELDERS PERFORMANCE
Form Title: QUALIFICATION RECORD Form No.: Doc. Custodian: BEC SECRETARY Approved By: BEC Lead
CPM Construction and General
Work Instruction (WI) Title: WI Ref. No.: Review Frequency: Annual Distribution: PX, BDC, PM, BDM Services, Inc.
Current DC DC
Yes X
Yes X
Test Result
We certify that the statements in this record are true and correct and that the test weld were prepared, welded and tested in accodance with the requirements of
Section IX ASME Boiler and Pressure Vessel.
Page 1 of 1
QAQC DEPARTMENT Procedure No.: Document Type / Level : FORM / Level 7
Manual: Manual No.: Revision No.: Status: Issued For REVIEW (IFR)
Procedure: Effective Date: (After IFI) Prepared By: QAQC PIC
WELDERS PERFORMANCE
Form Title: QUALIFICATION RECORD Form No.: Doc. Custodian: BEC SECRETARY Approved By: BEC Lead
CPM Construction and General
Work Instruction (WI) Title: WI Ref. No.: Review Frequency: Annual Distribution: PX, BDC, PM, BDM Services, Inc.
Current DC
Polarity REVERSE
Yes X
Yes X
Test Result
We certify that the statements in this record are true and correct and that the test weld were prepared, welded and tested in accodance with the requirements of
Section IX ASME Boiler and Pressure Vessel.
Page 1 of 1
QAQC DEPARTMENT Procedure No.: Document Type / Level : FORM / Level 7
Manual: Manual No.: Revision No.: Status: Issued For REVIEW (IFR)
Procedure: Effective Date: (After IFI) Prepared By: QAQC PIC
WELDERS PERFORMANCE
Form Title: QUALIFICATION RECORD Form No.: Doc. Custodian: BEC SECRETARY Approved By: BEC Lead
CPM Construction and General
Work Instruction (WI) Title: WI Ref. No.: Review Frequency: Annual Distribution: PX, BDC, PM, BDM Services, Inc.