HazardandRiskProfile..................................................................................................1
Disaster Preparedness...................................................................................32
Disaster Response.........................................................................................46
References................................................................................................................60
Annexes....................................................................................................................61
A. Local DRRM Council Members
B. Local DRRM Office Structure
C. Incident Command System / Organizational Structure for Disaster
Operations
D. Acronyms and Abbreviations
E. Organizational Chart
F. City Resolution
2|Page
SAN JUAN CITY PROFILE
GEOGRAPHY
Location
San Juan is a small congested City located in the heart of Metro
Manila. The City is among the smallest political subdivisions of the Metropolis. Its
land area of
5.94 square kilometers accounts for less than one percent of the region, occupying
0.93% of Metropolitan Manila’s 636 square kilometers. Located in the very center of
the Metropolis, it is bounded by Manila in the west, Quezon City in the north, and
Mandaluyong in the east and south, at coordinates 12º 36’ latitude due north and 121º
02’ longtitude due east.
San Juan City has a very little space for expansion. It is predominantly residential
with scattered commercial establishments. Because of its central location and
accessibility to and from all points of the region, San Juan has attracted migrants.
San Juan City is at risk to the impacts of natural hazards. Its constituents just like in
any other cities of Metro-Manila are considered to be increasingly vulnerable to the
threats of natural disasters due to numerous factors.
4|Page
Region is placed at high risk in the event of strong earthquakes that may emanate
from seismic fault zones very close to it.
San Juan City is located at the heart of Metro Manila bordered by Makati City
(North), Manila City (East) and Mandaluyong City (South). The City is expose to natural
and man-made hazards brought about by meteorological, geological and technological
hazards. The distance of the City to both the West Valley Fault and the San Juan River
contributes to these hazards, nevertheless the density of population and infrastructure
joined with the economic and political importance of the City, makes it a viable target
for domestic disturbance.
1. Earthquake Hazard
Based on the maps given by the GMMA (Greater Metropolitan Manila
Area) READY PROJECT, The West Valley Fault does not traverse San Juan
City thus saving the City from Ground Rupture but due to the proximity of the
West Valley fault, the City will Experience Ground Shaking with intensity low
eight (8).
5|Page
It is a vibration of the ground generated by seismic waves produced
when crustal materials and different classification of seismic waves interact.
The data on Ground shaking hazards in San Juan is based on the notion that
the West Valley Fault will generate a 7.2 magnitude earthquake, the worst
case scenario given in the model 8 of the Metro Manila Earthquake Impact
Reduction Study (2004). See MAP 1 for the Ground Shaking intensity in San
Juan Based on the study, the whole of San Juan Will experience very
destructive ground shaking of Intensity low 8 which signifies that:
6|Page
1.2 LIQUEFACTION POTENTIAL
7|Page
MAP 2: LIQUEFACTION HAZARD MAP OF SAN JUAN CITY
8|Page
1.3 Fire Prone Areas
9|Page
2. Flood Hazard
Based on the maps given by the GMMA (Greater Metropolitan Manila
Area) READY PROJECT, the City of San Juan is very susceptible to flooding,
the reason of which is the natural contour of the city and the proximity of the
affected areas to different bodies of water.
10 | P
age
Table 2: Flood Susceptibility per Barangay
District 1
11 | P
age
MAP 4: FLOOD HAZARD MAP OF SAN JUAN CITY
12 | P
age
3. RISK ASSESSMENT
3.1 FLOODING
The maps that is shown in this part was the result of the Urban development
Department Multi-Hazard risk Assessment Report and the Risk Analysis Project
(RAP). RAP is a collaborative project among Collective Strengthening of Community
Awareness for Natural Disaster (CSCAND) agencies in partnership with Geosciences
Australia and Aus Aid (Australia Aid) which aims to analyse Greater Metro Manila
Area’s risk from flood, severe wind and earthquake through development of
fundamental datasets and information on exposure, vulnerability and hazard.
Table 3 and Table 4 respectively shows the Hazard analysis for flooding and different
flood scenarios that the city of San Juan may encounter
13 | P
age
• Declogging of drainage system
• Upgrading/repair of drainage system
• Pumping Station
• Relocation of Informal settlers
Structural • Riprapping of riverbanks
• Continuous dredging of waterways
• Improvement of water level gauge
• Operation Center establishment
IEC on Flooding- Preparedness
Disaster Risk Non- • Implementation of Waste management
Reduction Structural laws/ordinances
Strategies • Proper waste disposal
• Updating & Enforcement of CLUP/Zoning
ordinances
• Hazard Maps Dissemination
Communitybased Flood Early Warning
System
SCENARIO
Affected 7,500
2,500 individuals 5,000 individuals
Population individuals
14 | P
age
60% of Roads
not Passable;
100% of
40% of Roads & Bridges not
Effects on 50% of Bridges not
Infra and 20% of Roads not Passable;
passable;
passable Electricity Electricity,
Facilities
temporarily cut-off; Water &
Communication
lines not
serviceable
100% CDRRMO, 70% of City’s
Response Volunteers, Emergency 25% of City’s
Capabilities BERTs, PRC, Response Units; Emergency
PNP, POSO Response Units
No Volunteers
15 | P
age
MAP 5: FLOOD HAZARD MAP OF SAN JUAN CITY
EVENT SCENARIO : 0.5% ANNUAL EXCEEDANCE PROBABILITY (1/200)
16 | P
age
EVENT SCENARIO : 0.5% ANNUAL EXCEEDANCE PROBABILITY (1/200) BUILDING
DAMAGE COST
17 | P
age
3.2 EARTHQUAKE
The map that is shown in this part was the result of the Urban
development Department Multi-Hazard risk Assessment Report and the Risk
Analysis Project (RAP). RAP is a collaborative project among Collective
Strengthening of Community Awareness for Natural Disaster (CSCAND)
agencies in partnership with Geosciences Australia and Aus Aid (Australia Aid)
which aims to analyse Greater Metro Manila Area’s risk from flood, severe wind
and earthquake through development of fundamental datasets and information
on exposure, vulnerability and hazard.
MAP 7: ESTIMATED NUMBER OF FATALITIES PER BARANGAY FOR A MAGNITUDE 7.2 VALLEY
FAULT EARTHQUAKE
18 | P
age
Table 6: BREAKDOWN OF THE ESTIMATED NUMBER OF CASUALTIES
LIFE-
SLIGHT SERIOUS THREATENING
BARANGAY INJURIES INJURIES INJURIES FATALITIES
ADDITION HILLS 62 17 1 4
BALONG-BATO 201 62 5 21
BATIS 264 80 6 25
CORAZON DE
JESUS 277 73 10 17
ERMITAÑO 84 24 2 8
GREENHILLS 757 208 13 65
ST. JOSEPH 131 36 3 8
ISABELITA 32 11 1 3
KABAYANAN 112 33 4 9
LITTLE BAGUIO 367 102 20 32
MAYTUNAS 48 10 1 2
ONSE 100 31 2 10
PASADEÑA 204 57 7 14
PEDRO CRUZ 85 27 3 6
PROGRESO 8 2 1 1
RIVERA 6 2 1 1
SALAPAN 181 54 6 17
SAN PERFECTO 218 64 5 17
SANTA LUCIA 124 37 1 9
TIBAGAN 95 27 1 10
WEST CRAME 311 89 12 27
19 | P
age
The estimated amount of economic loss per barangay for a magnitude
7.2 West valley fault earthquake as seen on MAP 8 is one million to fifteen
million pesos (P1, 000,000 – P15,000,000) which is classified under LOW.
Based on the study as seen on MAP 9, the total floor area in collapsed
damage state per barangay is 10,000 square meters of floor area per 1
square kilo meter barangay area to 30,000 square meters of floor area per 1
square kilo meter barangay area.
Based on the study as seen on MAP 10, the total floor area in complete
damage state with no collapse per barangay is 10,000 square meters of floor
area per 1 square kilo meter barangay area to 400,000 square meters of floor
area per 1 square kilo meter barangay area.
20 | P
age
MAP 8: ESTIMATED ECONOMIC LOSS IN SAN JUAN CITY
21 | P
age
MAP 9: TOTAL FLOOR AREA IN COLLAPSED DAMAGED STATE PER BARANGAY
IN SAN JUAN CITY
22 | P
age
MAP 10: TOTAL FLOOR AREA IN COMPLETE DAMAGE STATE WITH NO COLLAPSE PER
BARANGAY IN SAN JUAN CITY
23 | P
age
TABLE 7: ESTIMATED AMOUNT OF ECONOMIC LOSS, AREA OF COMPLETE DAMAGE AND
AREA OF COMPLETE COLLAPSED STRUCTURE FOR EACH BARANGAY
24 | P
age
City Disaster Risk Reduction and Management Office
VISION
Safer, adaptive and disaster resilient San Juan communities towards sustainable
development.
MISSION
• To set the direction, develop, implement, and coordinate DRRM programs with
in San Juan City
25 | P
age
SAN JUAN CITY
2016-2021
The San Juan Local Disaster Risk Reduction and Management Plan (SJLDRRMP)
fulfills the requirement of RA No. 10121 of 2010, which provides the legal basis for
policies, plans and programs to deal with disasters. The SJLDRRMP covers four
thematic areas, namely, (1) Disaster Prevention and Mitigation; (2) Disaster
Preparedness; (3) Disaster Response; and (4) Disaster Rehabilitation and Recovery,
which correspond to the structure of the National Disaster Risk Reduction and
Management Council (NDRRMC) and the National DRRM Plan
The SJLDRRMP is consistent with the National Disaster Risk Reduction and
Management Framework (NDRRMF), which serves as “the principal guide to disaster
risk reduction and management (DRRM) efforts of this City. The Framework envisions
a country of “safer, adaptive and disaster-resilient Filipino communities toward
sustainable development.” It conveys a paradigm shift from reactive to proactive
DRRM wherein men and women have increased their awareness and understanding
26 | P
age
of DRRM, with the end in view of increasing people’s resilience and decreasing their
vulnerabilities.
THEMATIC AREAS
The Thematic Areas mutually reinforce and complement each other. They do not,
should not and cannot stand along as they are inextricably linked. Having no clear
starting nor ending points between each other, overlapping is expected. These priority
areas are centered on problem-needs and asset-strengths that points to one direction
of reducing vulnerabilities and increasing capacities of the constituents of San Juan.
Preparedness
Mitigation
Response
Recovery and Rehabilitation
27 | P
age
IMPLEMENTING PERCENT COMPLETION TIMELINE
PROGRAMS ACTIVITIES PARTNERS
2017 2018 2019 2020 2021
28 | P a g e
IMPLEMENTIN PERCENT COMPLETION TIMELINE
PROGRAMS ACTIVITIES G PARTNERS 2017 2018 2019 2020 2021
2.1 Promote /
2.1 Promote / require seismic 2.1 Promote /
require seismic engineering require seismic
engineering designs for engineering
designs for 100% construction of 100% designs for
construction of
Annually critical Annually construction of
critical CBO CBO
No Budget infrastructur es No Budget critical
infrastructures
especially on Required especially on Required infrastructure s
liquefaction- liquefactionprone especially on
prone areas liquefactionprone
areas areas
2. Enhancement
of 2.2 Conduct 2.2 Conduct 2.2 Conduct
100% advocacies on 100% advocacies on
disaster resilient advocacies on
CBO Annually building code CBO Annually building code
infrastructure building code
CED No Budget and Structural CED No Budget and Structural
and Structural
Required Code. Required Code.
Code.
2.3 Strictly
implement
building code CBO 100% 100% 100% 100% 100%
and structural
code
2.4 Conduct
inspection of
INFRA AUDIT 100% 100% 100% 100% 100%
infrastructure for
compliance to
29 | P a g e
building
standards.
2.5 Strictly enforce
10 meter s
easement for river
and 3 meter BDRRMC
easement for LOCAL
100% 100% 100% 100% 100%
HOUSING
creeks
BOARD
respectively for
building structures
near waterways
2.6 Conduct and
sustain
infrastructure
Audit to the
remaining
infrastructure that
are not yet
assessed. INFRASTRUC
All institutional TURE AUDIT 20% 40% 60% 80% 100%
and commercial TEAM
establishments
Roads and
bridges
20% all Gov’t and
Private Schools
40% all Gov’t
buildings
30 | P a g e
60% all
Commercial
Buildings 80%
all Bridges and
local infra 100%
all infra. In
San Juan
2.7 Set up
Precautionary
signage along
identified high-risk
zones prohibiting
construction of
structures. 50% 100% 100%
CED
2. Enhancement of 200,000.00 230,000.00 264,000.00
Barangay
disaster resilient 50% - Started and (Special trust (Special (Special trust
Council
infrastructure installed signage fund AIP trust fund fund AIP
CDRRMO
to 10 barangays 2015) AIP 2015) 2015)
100%- Installed
and Maintaned
Signage to all 21
Barangays
31 | P a g e
IMPLEMENTING PERCENT COMPLETION TIMELINE
PROGRAMS ACTIVITIES PARTNERS
2017 2018 2019 2020 2021
100%
100%
ANNUAL
3.1 Waterways Cleanup CENRO ANNUALL 100% 100% 100%
LY
Drive NGOs Y ANNUALLY ANNUALLY ANNUALLY
500,000.0
BDRRMC 500,000.0 500,000.00 500,000.00 500,000.00
San Juan River 0
MMDA 0 (Special (Special trust (Special trust
Ermitano Creek (Special
DILG (Special trust fund fund fund
trust fund
3. Sustainability Maytunas Creek PRRC trust fund CDRRMF) CDRRMF) CDRRMF)
CDRRMF
of San Juan river CDRRMF)
)
and creeks 100%
protection and CENRO 100%
100,000.0 100% 100% 100%
preservation and NGOs 100,000.0
0 100,000.00 100,000.00 100,000.00
rehabilitation BDRRMC 0
3.2 Dredging (Special (Special (Special trust (Special trust
MMDA (Special
trust fund trust fund fund fund
DPWH trust fund
CDRRMF CDRRMF) CDRRMF) CDRRMF)
PRRC CDRRMF)
)
CENRO
3.3 Adopt-an –Estero Public-Private 100% 100% 100% 100% 100%
project partnership
32 | P a g e
IMPLEMENTING PERCENT COMPLETION TIMELINE
PROGRAMS ACTIVITIES PARTNERS 2017 2018 2019 2020 2021
4.1 Capacitate
BDRRMCs and the 100%
CDRRMO BOC
selected community ANNUALL 100%
BDRRMC 100% 100% 100%
leaders in : Y 690,000.0
DILG 793,000.00 915,000.00 1,100,000.00
- Community- Based 600,000.0 0
NGO
DRRM 0
4. Capacity - Hazard mapping
Enhancement of
100%
communities. 100%
600,000.0 100% 100%
600,000.0 100%
4.2 Conduct IEC on 0 600,000.00 600,000.00
CDRRMO BOC 0 600,000.00
Disater preparedness CDRRMF CDRRMF CDRRMF
BDRRMC CDRRMF CDRRMF AIP
to all 21 barangays. AIP AIP AIP
AIP 2017
2017 2017 2017
2017
5.Poverty 100% 100%
Reduction 5.1 CASH FOR WORK PESO 302,500.0 347,875.0 100% 100% 100%
system PROGRAMS (TUPAD) CENRO 0 0 400,500 461,000.00 530,000.00
6.1 Synchronize
6. Upgrading of
community-based EWS
early warning 100% 100% 100% 100% 100%
communication system BDRRMC
systems and between communities , 17,000,00 17,000,00 17,000,000. 17,000,000.0 17,000,000.0
CDRRMO
Hazard BDRRMCs and 0.00 0.00 00 0 0
CEDOC
monitoring. CDRRMO/CEDOC
33 | P a g e
100%
6.2 Procure EWS 17,000,00
equipment and CDRRMO 0 pesos 100% 100% 100% 100%
establish facilities. per year
34 | P a g e
PRIORITY AREA: DISASTER PREPAREDNESS
GOAL:
36 | P a g e
1.3 Develop and
Publish the San 100%
Juan Emergency
1,000,000.00
Handbook. CDRRMO 100% 100%
100% - Develop and (SPECIAL
PID 1,150,000.00 1,322,500.00
Publish the San TUST FUND
Juan Emergency AIP 2015)
Handbook.
1.4 Conduct
Lectures and
Stakeholder BDRRMC
engagements for CDRRMO
100% 100% 100% 100% 100%
the DRRM and CCA DILG
advocacies. 600,000.00 600,000.00 600,000.00 600,000.00 600,000.00
FAMILY
(Indicate budget and MMDA
title based from cap
dev)
1.5 Utilize social CDRRMO
media sites
(Facebook and
twitter) and San Juan
City official website
as a medium for 100% ANNUALLY
community NO BUDGET REQUIRED
awareness on
DRRM.
37 | P a g e
IMPLEMENTING PERCENT COMPLETION TIMELINE
PROGRAMS ACTIVITIES PARTNERS 2017 2018 2019 2020 2021
2.1 Conduct
BLS/First aid
Training to:
- City Hall
Employees 100% 100% 100% 100% 100%
CDRRMO
- BDRRMC, 800,000.00 800,000.00 800,000.00 800,000.00 800,000.00
Other Community
2. Enhancement of Leaders and
the capacity of the Volunteers
Communities and 2.2 Regularly
institutions to cope conduct earthquake ,
BDRRMC
with the imminent fire and flood drills 100% 100% 100% 100% 100%
CDRRMO
impacts of hazards on schools , 300,000.00 345,000.00 396,000.00 456,262.00 524,000.00
Barangays and DILG FAMILY
government offices
2.3 Review and
periodically update
100% 100% 100% 100% 100%
Contingency Plans CDRRMC
300,000.00 345,000.00 396,000.00 456,262.00 524,000.00
for earthquake and
flooding.
38 | P a g e
2.4 Conduct
Community-Based 100% 100% 100% 100% 100%
DRRM and DILG 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00
barangay monitoring
DRRNet CDRRMF CDRRMF CDRRMF CDRRMF CDRRMF
system on all 21
CDRRMO TRUST FUND TRUST TRUST TRUST TRUST
barangays in
collaboration with 2014 FUND FUND FUND FUND
DRRNET
39 | P a g e
2.6 Establish a
memorandum of
agreement (MOA)
between the City and
the following
Establishments: CDRRMO
- PureGold GSD
- Mercury Drug N. 100% 100%
BUDGET OFFICE
Domingo NO BUDGET NO BUDGET
ACCOUNTING
- UNIOIL Gas Station REQUIRED REQUIRED
OFFICE
- Xavier School CSWD
- Hardware’s
- Water Refilling
Station
- Funeral Homes
40 | P a g e
institutions to cope
2.9 Maintain and strengthen the
with the imminent
capacities and capabilities of 100% ANNUALLY
impacts of hazards the locally initiated “Barangay BDRRMCs 1,000,000.00
Brotherhood System” through (CDRRMF TRUST FUND)
drills and trainings
100%
100% 100% 100% 100%
2.11 Train competent ANNUAL
ANNUAL ANNUAL ANNUAL ANNUAL
personnel knowledgeable in LY
SPORTS LY LY LY LY
handling sports related 607,753.
500,000. 525,000. 551,250. 578,812.
emergencies and disaster 00
00 00 00 00
100% 100% 100% 100% 100%
2.12 Capacitate the existing ANNUAL ANNUAL ANNUAL ANNUAL ANNUAL
CDRRMO personnel with LY LY LY LY LY
CDRRMO
pertinent disaster related 8,000,00 8,400,00 8,820,00 9,261,00 9,724,00
trainings 0.00 0.00 0.00 0.00 0.00
41 | P a g e
IMPLEMEN PERCENT COMPLETION TIMELINE
TING
PROGRAMS ACTIVITIES
PARTNER 2017 2018 2019 2020 2021
S
3.1 Creation and
hiring of additional
personnel to fill-up a
total of at least 45-
manned emergency
response and
technical rescue unit
(with regular plantilla)
to perform 24 hours a
3.Establishment of day and 7 days a
a credible , week.
adequate and 3.2 Implement a
professional City coordinated
Emergency integrated emergency
Response Unit/ Medical Service
Personnel (EMS) system of
emergency response
3.3 Maintain and
equip the established
quick response team 100% 100%
CDRRMO 100% 100% 100%
ensuring capability for 980,000.0 1,128,200.
GSD 645,000.00 741,750.00 853,000.00
all-hazards USAR and 0 00
readily deployable in
a short span of time.
42 | P a g e
3.4 Procure and
maintain the following
emergency response
vehicles:
- Command Vehicle
(2 Pick up truck) -
Vehicle for 100%
evacuation of Maintenan 100%
100% 100% 100%
communities (1 Mini GSD/ ce Maintenan
Bus) Procurement Maintenanc Maintenanc
TFD/POSO/ 500,000.0 ce
- Motorcycles 21,000,000.00 e e
CENRO/CD 0 500,000.00
(12) - Relief Van (1 CDRRMF 500,000.00 500,000.00
RRMO/OV CDRRMF CDRRMF
Close aluminium van) TRUST FUND CDRRMF CDRRMF
M FUND FUND 2014
- QRT Van 2016 FUND 2014 FUND 2014
2014
(Commuter Van)
- ALS
Ambulance &
EMS Ambulance
- Manlifter with
basket
- Backhoe
43 | P a g e
IMPLEMENTING PERCENT COMPLETION TIMELINE
PROGRAMS ACTIVITIES PARTNERS 2017 2018 2019 2020 2021
3.5Procurement of 100%
Advance Command
1,500,000.00
post tent,supplies and
GSD CDRRMF
equipment 100%-
Completed TRUST FUND
Purchase of the items 2016
3.6 Purchase of GSD 100% 100% 100%
Emergency Response 2,000,000.00 2,000,000. 2,000,000.
3.Establishment of Supplies 00 00
a credible , 3.7 Purchase of GSD 100% 100%
adequate and Emergency Response 1,150,000.00 1,150,000.
professional City Uniforms for CDRRMF 00
Emergency responders TRUST FUND CDRRMF
Response Unit/ 2013 TRUST
Personnel FUND 2013
44 | P a g e
3.9 Purchase of GSD 100%
extrication tools, 18,000,000.00
supplies, equipment CDRRMF
and machineries for TRUST FUND
disaster response 2016
45 | P a g e
4.1Request training
on Damage and
needs assessment
and procurement of
4.Capacitate DANA Equipment
from the Office of
responsible 100% 100% 100%
Civil Defence (OCD) 50% 100%
personnel for pre CDRRMO OCD 900,000.0 900,000. 900,000.0
50%- Half of the 900,000.00 900,000.00
and post disaster council finished the 0 00 0
assessment DANA Training 100%
- All of the council
members Finished
the DANA
Training
100%
5.1 Procurement of 1,500,000.00
Satellite phone (10) GSD CDRRMF
TRUST FUND
2014
5.2 Procurement of 100%
4,000,000.00
Communication tools, CDRRMF
5.Enhance GSD
supplies and TRUST
Communication equipments FUND 2015
capabilities
5.3 Maintain and
develop an enhanced
ICS coordination and 100% 100% 100% 100%
communication system PID 100%
1,200,000 1,200,000. 1,200,00 1,200,000.
CDRRMO BOC 1,200,000.00
.00 00 0.00 00
100%-Conduct of
Training on ICS
46 | P a g e
5.4 Fiber optic 100%
Installation and Radio 35,000,000.00
Communication CDRRMO GSD CDRRMF
Equipment and TRUST FUND
Supplies 2017
47 | P a g e
SPORTS 100% 100%
100% 100%
CSWD 6,000,000. 6,000,000 100%
6,300,00 8,331,750
6.2 Stockpile relief goods, 00 .00 7,245,000.00
0.00 .00
water, food and clothing in a CDRRMF CDRRMF CDRRMF
CDRRMF CDRRMF
strategically secure location. TRUST TRUST TRUST
TRUST TRUST
FUND FUND FUND
FUND FUND
2014 2017
CDRRMO
PID
7.Enhance
DILG
preparedness for 7.1 Develop a dedicated 100% 100% 100%
BFP 100%
effective disaster “Specific Disaster Response 800,000.0 920,000. 1,300,000
PNP 1,058,000.00
response Manual”. 0 00 .00
DOH
operations
OCD
MMDA
8. Observe 100% 100%
Change Change 100% 100% 2,205,00 100% 2,431,012
8.1 Conduct Climate Change CENRO
Adaptation 2,000,000. 2,100,000 0.00 2,315,250.00 .00
related seminars and trainings CDRRMO
Initiatives 00 .00
48 | P a g e
PRIORITY AREA: DISASTER RESPONSE
GOAL:
CDRRMC
1.1 Activate ICS 100% Annually in the event of a Disaster
CDRRMO
1.Conduct a
wellestablished 1.3 Conduct a consolidated INFRASTRUCTURE
disaster response 100% Annually in the event of a Disaster
DANA AUDIT TEAM
operations
50 | P a
ge
GSD
CSWD
1.5 Safe and timely CDRRMO
evacuation of affected BARANGAY 100% Annually in the event of a Disaster
population. COUNCIL
BFP
PNP
BOC
1.6 Implement
PID
the “forced or
PNP
Pre-emptive 100% Annually in the event of a Disaster
CDRRMO
Evacuation”
BARANGAY
Ordinance
1.Conduct a COUNCIL BFP
wellestablished
disaster CED
1.7 Conduct
response CENRO
Prompt road
operations BFP 100% Annually in the event of a Disaster
clearing
CDRRMO
operations
PNP
1.8 Restore
lifelines- CED NGO 100% Annually in the event of a Disaster
electricity and
51 | P a
ge
water
1.9 Provide
accurate CSWD
account and SJMC
100% Annually in the event of a Disaster
data of missing CHO
and dead DILG
persons
1.10Disaster 100% 100% 100% 100% 100%
Operational Annually in Annually in Annually in Annually in Annually in
DSWD/ CENRO/
Costs for other the event of a the event of a the event of a the event of the event of
CDRRMO
emergencies Disaster Disaster Disaster a Disaster a Disaster
with out 6,000,000.00 6,300,000.00 6,615,000.00 6,945,750.00 7,293,037.00
declaration of
state of calamity
i.e.
fire, flash floods
1.11 Implement
CENRO
a system of
CHO/HEMS
burial of the
PNP
dead according 100% Annually in the event of a Disaster
DILG
to protocols and
CIVIL
religious
REGISTRY
practice.
52 | P a
ge
IMPLEMENT PERCENT COMPLETION TIMELINE
PROGRAMS ACTIVITIES ING
202
PARTNERS 2017 2018 2019 2020
1
2.1 PREPARE
Issue Directives
Convene DRRMC CDRRMC 100% Annually in the event of a Disaster
Prepare Administrative and
Logistical Support
2.Implement
2.2 RESPONSE
OPLAN LISTO
Delineate tasks and roles with
Based on the
corresponding lead offices and
advisory and CDRRMC 100% Annually in the event of a Disaster
guidelines from members who will execute
DILG actions across a given time
scale
2.3 MONITOR the Disaster
Response
Upon receipt of Alert, During and CDRRMC 100% Annually in the event of a Disaster
After the Disaster.
3. Provision of
CSWD
temporary shelter 3.1 Prepare pre-identified
BDRRMC 100% Annually in the event of a Disaster
needs of the evacuation sites and facilities.
CED
affected population.
53 | P a
ge
3.2 Provide adequate space
for:
• Temporary learning and CSWD
play area for children. 100% Annually in the event of a Disaster
CHO
• Lactating mothers
• Couples room
CITY
3.3 Provide adequate space VETERINAR 100% Annually in the event of a Disaster
and /or cages for animal/pets.
Y OFFICE
100%
3.4 purchase of Portable Toilet 4,000,000.00
for Disaster and complex GSD CDRRMF
emergencies TRUST FUND
2017
54 | P a
ge
IMPLEMENTING PERCENT COMPLETION TIMELINE
PROGRAMS ACTIVITIES PARTNERS 2017 2018 2019 2020 2021
5.3 Provide CISD CHO CSWD 100% Annually in the event of a Disaster
55 | P a
ge
IMPLEMENTING PERCENT COMPLETION TIMELINE
PROGRAMS ACTIVITIES PARTNERS 2017 2018 2019 2020 2021
6.1 Conduct Post-DANA RDNA TEAM 100% Annually in the event of a Disaster
6. Implement a
coordinated and
integrated system 6.2 Implement livelihood and
of early recovery. income-generating programs. CTLC
•Cash for work PESO 100% Annually in the event of a Disaster
•Food for work NGO
•Micro enterprise
56 | P a
ge
PRIORITY AREA: DISASTER REHABILITATION AND RECOVERY
GOAL:
OBJECTIVES:
59 | P a g e
IMPLEMENTING PERCENT COMPLETION TIMELINE
PROGRAMS ACTIVITIES PARTNERS
2017 2018 2019 2020 2021
3.1 Repair and CED
rehabilitate damaged BO
infrastructure according NGO
to standards of the
national building and 100% Immediately after a disaster
structural codes and to
adopt the principle of
“Building Back Better
and Safer”.
3.2 Implement green CED/ CENRO/
technology in the CBO
3.Restore SANGGUNIAN 100% Immediately after a disaster
damaged reconstruction of
infrastructures. PANLUNGSOD
infrastructure
3.3 Coordinate and
develop arrangements
with NGOs, Faith Based
Organization, Health BOC
Professionals, and CHO
Associations of HEMS
100% Immediately after a disaster
architects / engineers to CDRRMO
supplement the City’s SJMC
NGO
resources and facilitate
the reconstruction and
rehabilitation programs.
60 | P a g e
3.4Develop and identify
CSWD
safe relocation sites for 100% Immediately after a disaster
UPAO
affected communities
61 | P a g e
SOURCES OF FUNDING
Funding for the implementation of the DRRM plan shall be sourced from not less
than 5% of the estimated revenue from regular sources (RA 10121 Sec. 21 par 1).
Thirty percent (30%) of the fund shall be set aside as a Quick Response Fund
(QRF) for relief and recovery programs.
Considering the government’s limited funding capacity, the national government,
the civil society and the private sector are expected to play a significant role in
supporting the funding of disaster risk reduction measures. Support from
international donors is also expected, especially in the context of a broader scope
disaster risk reduction.
This DRRM Plan shall be evaluated and monitored by the San Juan City DRRM
Council.
62 | P a g e
References:
a. Republic Act No. 10121
b. 2010 Census of population and Housing – Final Results
c. Republic act 7160
d. IRR of RA 10121
e. City Executive Ordinance No.GGG-13 Series 2011
f. Metro Manila Earthquake Impact Reduction Study (MMEIRS)
g. “Oplan Yakal” of MMDA
h. Compendium of Disaster Preparedness Protocols of DILG
i. The National Disaster Risk Reduction and Management Plan 2011 - 2028
j. Disaster Prevention and Mitigation
• GMMA Project
• Executive Order No. GGG-09
• DILG Memorandum Circular No. 2011 – 47
• Comprehensive Land Use Plan
• Climate Change Adaptation Plan
• San juan Urban Gardening Program
k. Disaster Preparedness
• Comprehensive Development Plan CY 2008-2015
• Project Proposal Dated February 18, 2013 (Approved)
• San Juan Barangay Brotherhood System
l. Disaster Response
• Senate Bill No. 2410
• Memorandum Circular No. 04 s. 2012
• PD no. 603
• Republic Act No 9147 (approved 18 May 1998)
• Pre-emptive Evacuation Ordinance
m. Disaster Rehabilitation
• NDCC Memo No. 04 Series of 1998
• CSC MC No. 23 s. 2013
63 | P a g e
Annex A
LOCAL DRRM COUNCIL MEMBERS
Nathaniel N. Rabonza
Local Office of Civil Defense (OCD) Coordinator, CDRRMC Secretariat
HON. JANELLA EJERCITO ESTRADA
City Vice Mayor
DR. JESUS ESTEBAN P. OLAÑO ATTY. RANULFO BA DACALOS
City Health Officer City Administrator
JESSICA D. QUITOR RENATO RAMOS
City Social Welfare and Development Chief, Public Order and Safety
Officer EDGAR DE JESUS
VISITACION MARTINEZ Head, Barangay Operations
City Director, DILG-San Juan Center
DR. RUBEN A. QUIMOSING EMILIO G. SOLISA
Head, City Gender Development Office City General Services Officer
DR. JERRY ALCANTARA HON COUN. SANCHO HICAP
City Veterinary Officer President, Liga ng mga Barangay
MA. AURA E. ROBLES DINAH LAMSEN
City Planning and Development Officer City Accountant
LETICIA ALCOBER EDGARDO BRIONES
City Treasurer City Assessor
ENGR. RIGOR JOHN ABUTAR ERWIN OLGADO
ICO- City Engineer Representative, MMDA-San Juan
ARCH. ROMEO B. GONZALES ALLENMARIE ALEJO
City Architect City Tourism Officer
LIZA S. TIOMICO MARILYN MANASALA
City Budget Officer Protocol Officer/ Special
PS/SUPT. WILLIAM MONGAS SEGUN Operations IV, Office of
San Juan Chief of Police the Mayor
DR. JOEL TORRECAMPO
OIC, Office of Schools Division Representative, OCD-NCR
Superintendent SANDRA BELEN PERLAS
BANTILING Representative Doña Felomina
Chief, Public Assisstance Office Homeowners Assoc.
DANTE SANTIAGO MIGUEL ORTIGAS
Head, CENRO Representative, Private Sectror
MELCHOR ROBLES PAUL BRYAN CASTILLO
Deputy Director for Operations, TFD Representative, Red Cross
FCINSP. GREG B. BOMOWEY ALBERT DELA FUENTE
Fire Marshal, San Juan BFP Representative, San Juan Ecology
Advocacy Resource Center
RAYMOND GANZON
Representative, Bukluran ng
Kabataan ng San Juan
64 | P a g e
Annex D
65 | P a g e
MMDA METRO MANILA DEVELOPMENT AUTHORITY
MMEIRS METRO MANILA EARTHQUAKE IMPACT REDUCTION STUDY
MOA MEMORANDUM OF AGREEMENT
NDRRMC NATIONAL DISASTER RISK REDUCTION AND MANAGEMENT COUNCIL
NDRRMF NATIONAL DISASTER RISK REDUCTION AND MANAGEMENT FUND
NGO NON-GOVERNMENT ORGANIZATION
OCD OFFICE OF CIVIL DEFENCE
PAC PUBLIC ASSISTANCE CENTER
PESO PUBLIC EMPLOYMENT SERVICES OFFICE
PHILVOLCS PHILIPPINE INSTITUTES OF VOLCANOLOGY AND SEISMOLOGY
PID PUBLIC INFORMATION DEPARTMENT
PNP PHILIPPINE NATIONAL POLICE
PPE PERSONAL PROTECTIVE EQUIPMENT
QRF QUICK RESPONSE FUND
RA REPUBLIC ACT
RAP RISK ANALYSIS PROJECT
RSAP REHABILITATION STRATIGIC ACTION PLAN
SJLDRRMP SAN JUAN LOCAL DISASTER RISK REDUCTION AND MANAGEMENT PLAN
SJMC SAN JUAN MEDICAL CENTER
SRR SEARCH RESCUE RETRIVAL
USAR URBAN SEARCH AND RESCUE