0% found this document useful (0 votes)
316 views3 pages

Sheet Pile Wall Design Based On 2018 IBC / 2019 CBC / ACI 318-19

This document provides a design summary and analysis for a sheet pile wall and flagpole footing. For the sheet pile wall: - The cantilever height is 10 ft with a 500 psf surcharge. - Lateral soil pressure is 35 pcf. Seismic pressure is 450 psf for heights over 12 ft. - Pile spacing is 4.0333 ft with 44 in diameter piles reinforced with 16 #11 bars and 6 #6 ties at 8 in. - Calculations check flexural and axial capacity as well as shear. The required embedment depth is 20.51 ft. For the flagpole footing: - The lateral force at the pole top is 104.23 kips
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
316 views3 pages

Sheet Pile Wall Design Based On 2018 IBC / 2019 CBC / ACI 318-19

This document provides a design summary and analysis for a sheet pile wall and flagpole footing. For the sheet pile wall: - The cantilever height is 10 ft with a 500 psf surcharge. - Lateral soil pressure is 35 pcf. Seismic pressure is 450 psf for heights over 12 ft. - Pile spacing is 4.0333 ft with 44 in diameter piles reinforced with 16 #11 bars and 6 #6 ties at 8 in. - Calculations check flexural and axial capacity as well as shear. The required embedment depth is 20.51 ft. For the flagpole footing: - The lateral force at the pole top is 104.23 kips
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

PROJECT : PAGE :

CLIENT : DESIGN BY :
JOB NO. : DATE : REVIEW BY :
Sheet Pile Wall Design Based on 2018 IBC / 2019 CBC / ACI 318-19
INPUT DATA & DESIGN SUMMARY
HEIGHT OF CANTILEVER Hcant = 10 ft
SURCHARGE WEIGHT ws = 500 psf
ALLOWABLE LATERAL SOIL-BEARING PRESSURE IN EMBEDMENT
Pp = 300 psf / ft
LATERAL SOIL PRESSURE Pa = 35 pcf (equivalent fluid pressure)
SEISMIC GROUND SHAKING PE = 450 psf / ft (for Hcant > 12 ft only)

SOIL SPECIFIC WEIGHT gb = 110 pcf


CONCRETE STRENGTH f c' = 4 ksi
VERT. REBAR YIELD STRESS fy = 60 ksi
PILE DIAMETER D = 44 in
PILE SPACING S = 4.0333 ft, o.c.
PILE VERT. REINF. 16 # 11
LATERAL REINF. OPTION (0=Spirals, 1=Ties) 1 Ties
LATERAL REINFORCEMENT # 6 @ 8 in o.c.

THE SHORING DESIGN IS ADEQUATE.


( Hembd = 20.51 ft. Min. Req'D)

ANALYSIS
DETERMINE PILE SECTION FORCES AT CANTILEVER BOTTOM
Hb = 0.5 S Pa (Hcant)2 = 7.06 kips, ASD
Hs = ws S Pa (Hcant) / gb = 6.42 kips, ASD
HE = 0.5 S PE (Hcant)2 = 90.75 kips, ASD
P = S D ws + 0.25 p gc D2 Hcant = 23.23 kips, ASD
V = Hb + HE + Hs = 104.23 kips, ASD
M = (Hb /3 + 2HE /3 + Hs /2 ) Hcant = 520.1 ft-kips, ASD

Pu = 1.2 P = 27.88 kips, SD


Vu = 1.6 V = 166.76 kips, SD
Mu = 1.6 M = 832.1 ft-kips, SD

CHECK PILE LIMITATIONS


fc ' = 4 ksi > 4 ksi [Satisfactory] (IBC Table 1808.8.1)
D= 44 in > MAX[( Hcant + Hembd) / 30 , 12 in] [Satisfactory] (IBC 1810.3.5.2)

CHECK FLEXURAL & AXIAL CAPACITY

      2 
  f C'  2   c     c   , for 0   c   o  s E s , for  s   ty
e
 fC    o    o   , f S
 '
 f y , for  s   ty
  e f C , for  c   o


2 e f C
'
 fy  ty , for compression controlled
 o  ,  ty  , t  
Ec Es  ty  0.003 , for tension controlled
'
E c  57 f C , E s  29000ksi ,  e  0.85 ,  cu  0.003
(cont'd)

Note:
1. Between compression & tension controlled is
f Pn (k) Transition, which the f should be by linear
interpolation. (ACI 318-19 Tab. 21.2.2 & Fig. R10.4.2.1)
2. ACI 318-19 changed f (Fig.R21.2.2b) and keeps
0
be (22.2.2.4.1) and ecu (Fig. R21.2.2a) the same.
0 500 But AISC 360/341-16 has different f (0.9 only) and
be (1.0 or 0.7).

Solid Black Line - Tension Controlled f Mn (ft-k)


Solid Red Line - Transition f Mn = 1706 ft-kips @ Pu = 28 kips > Mu
Dash Line - Compression Controlled [Satisfactory]

CHECK SHEAR CAPACITY


f Vn = f (Vs + Vc) = 312 kips, (ACI 318-19 22.5)
> Vu [Satisfactory]
where f = 0.75 (ACI 318 21.2)
A0 = 1228 in2. Av = 0.88 in2. fy = 60 ksi
Vc = 2 (fc')0.5A0 = 155.4 kips, (ACI 318-19 22.5)
Vs = MIN (d fy Av / s , 8 (fc')0.5A0) = 261.0 kips, (ACI 318-19 22.5.1)
smax = 12 (IBC 1810.3.9.4.2) sprovd = 8 in
smin = 1 [Satisfactory]
rs = 0.12 fc' / fyt = 0.008 < rs,provd = 0.008 [Satisfactory] (ACI 318-19 18.13.4.3 & 18.7.5.1)

DETERMINE PILE EMBEDMENT LENGTH, Hembd, (IBC 1807.3)


By trials, use pole depth, d = Hembd = 20.51 ft
Lateral bearing @ bottom, S3 = 2 Pp Min( d , 12' ) = 7.20 ksf
Lateral bearing @ d / 3, S1 = 2 Pp Min( d / 3 , 12' ) = 4.10 ksf
Require Depth is given by
A 4.36 h 
d 1  1   for nonconstrained 
2 A  20.51 ft [Satisfactory]

Where P =V = 104.23 kips


A = 2.34 P / (D S1) = 16.21
h =M / V = 4.99 ft
PROJECT : PAGE :
CLIENT : DESIGN BY :
JOB NO. : DATE : REVIEW BY :
Flagpole Footing Design Based on Chapter 18 of IBC & CBC
INPUT DATA & DESIGN SUMMARY
IS FOOTING RESTRAINED @ GRADE LEVEL ? (1=YES,0=NO) 0 no P
LATERAL FORCE @ TOP OF POLE P= 104.23 k
HEIGHT OF POLE ABOVE GRADE h= 4.989739 ft
DIAMETER OF POLE FOOTING b= 3.666667 ft h
LATERAL SOIL BEARING CAPACITY S= 0.3 ksf / ft
ISOLATED POLE FACTOR (IBC 09 1806.3.4) F= 2
FIRST TRIAL DEPTH ===> d = 20 ft

Use 3.66666666666667 ft dia x 20.51 ft deep footing unrestrained @ ground level d

ANALYSIS

LATERAL BEARING @ BOTTOM : S 3  FS Min  d , 12 '


LATERAL BEARING @ d/3 : d 
S 1  FS Min  , 12 ' 
3 
2.34 P
A
bS 1
A 4.36h 
 1  1   , FOR NONCONSTRAINED
REQUIRD DEPTH : 2  A 
d 
 4.25 Ph , FOR CONSTRAINED
 bS 3

NONCONSTRAINED CONSTRAINED
LATERAL FORCE @ TOP OF POLE P => 104.23 k 104.23 k
HEIGHT OF POLE ABOVE GRADE h => 5.0 ft 5.0 ft
DIAMETER OF POLE FOOTING b => 3.67 ft 3.67 ft
LATERAL SOIL BEARING CAPACITY FS => 0.60 ksf / ft 0.60 ksf / ft

1ST TRIAL TRY d1 => 20.00 ft 20.00 ft


LAT SOIL BEARING @ 1/3 d S1 => 4.00 ksf 4.00 ksf
LAT SOIL BEARING @ 1.0 d S3 => 7.20 ksf 7.20 ksf
CONSTANT 2.34P/(bS1) A => 16.63 - -
REQD FOOTING DEPTH RQRD d => 20.95 ft 9.15 ft

2ND TRIAL : TRY d2=> 20.47 ft 14.57 ft


LAT SOIL BEARING @ 1/3 d S1 => 4.09 ksf 2.91 ksf
LAT SOIL BEARING @ 1.0 d S3 => 7.20 ksf 7.20 ksf
CONSTANT 2.34P/(bS1) A => 16.24 - -
REQD FOOTING DEPTH RQRD d => 20.54 ft 9.15 ft

3RD TRIAL : TRY d3=> 20.51 ft 11.86 ft


LAT SOIL BEARING @ 1/3 d S1 => 4.10 ksf 2.37 ksf
LAT SOIL BEARING @ 1.0 d S3 => 7.20 ksf 7.12 ksf
CONSTANT 2.34P/(bS1) A => 16.22 - -
REQD FOOTING DEPTH RQRD d => 20.52 ft 9.20 ft

4TH TRIAL : TRY d4=> 20.51 ft 10.53 ft


LAT SOIL BEARING @ 1/3 d S1 => 4.10 ksf 2.11 ksf
LAT SOIL BEARING @ 1.0 d S3 => 7.20 ksf 6.32 ksf
CONSTANT 2.34P/(bS1) A => 16.21 - -
REQD FOOTING DEPTH RQRD d => 20.51 ft 9.77 ft

5TH TRIAL : TRY d5=> 20.51 ft 10.15 ft


LAT SOIL BEARING @ 1/3 d S1 => 4.10 ksf 2.03 ksf
LAT SOIL BEARING @ 1.0 d S3 => 7.20 ksf 6.09 ksf
CONSTANT 2.34P/(bS1) A => 16.21 - -
REQD FOOTING DEPTH RQRD d => 20.51 ft 9.95 ft

You might also like